Air System Sizing Summary for 1.

WAITING AREA
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:21PM

Air System Information


Air System Name 1. WAITING AREA Number of zones 1
Equipment Class CW AHU Floor Area 265.0 m²
Air System Type SZCAV Location Kuala Lumpur, Malaysia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 65.6 kW Load occurs at Jun 1400
Sensible coil load 44.5 kW OA DB / WB 33.6 / 25.5 °C
Coil L/s at Jun 1400 3049 L/s Entering DB / WB 26.1 / 19.6 °C
Max block L/s 3049 L/s Leaving DB / WB 13.9 / 13.4 °C
Sum of peak zone L/s 3049 L/s Coil ADP 12.6 °C
Sensible heat ratio 0.678 Bypass Factor 0.100
m²/kW 4.0 Resulting RH 55 %
W/m² 247.6 Design supply temp. 14.4 °C
Water flow @ 5.6 K rise 2.83 L/s Zone T-stat Check 1 of 1 OK
Max zone temperature deviation 0.0 K

Central Heating Coil Sizing Data


Max coil load 19.8 kW Load occurs at Jan 0800
Coil L/s at Jan 0800 3049 L/s W/m² 74.6
Max coil L/s 3049 L/s Ent. DB / Lvg DB 14.1 / 19.5 °C
Water flow @ 11.1 K drop 0.43 L/s

Supply Fan Sizing Data


Actual max L/s 3049 L/s Fan motor BHP 0.00 BHP
Standard L/s 3041 L/s Fan motor kW 0.00 kW
Actual max L/(s·m²) 11.51 L/(s·m²) Fan static 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s 502 L/s L/s/person 2.97 L/s/person
L/(s·m²) 1.89 L/(s·m²)

Hourly Analysis Program v5.01 Page 1 of 11


Zone Sizing Summary for 1. WAITING AREA
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:21PM

Air System Information


Air System Name 1. WAITING AREA Number of zones 1
Equipment Class CW AHU Floor Area 265.0 m²
Air System Type SZCAV Location Kuala Lumpur, Malaysia

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Sum of space airflow rates
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Zone Terminal Sizing Data

Reheat Zone Zone


Design Minimum Reheat Coil Htg Unit Htg Unit Mixing
Supply Supply Coil Water Coil Water Box Fan
Airflow Airflow Zone Load L/s Load L/s Airflow
Zone Name (L/s) (L/s) L/(s·m²) (kW) @ 11.1 K (kW) @ 11.1 K (L/s)
Zone 1 3049 3049 11.51 0.0 0.00 0.0 0.00 0

Zone Peak Sensible Loads

Zone Zone Zone


Cooling Time of Heating Floor
Sensible Peak Sensible Load Area
Zone Name (kW) Cooling Load (kW) (m²)
Zone 1 34.7 Jun 1700 0.0 265.0

Space Loads and Airflows

Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s·m²)
Zone 1
1. WAITING AREA 1 34.7 Jun 1700 3049 0.0 265.0 11.51

Hourly Analysis Program v5.01 Page 2 of 11


Ventilation Sizing Summary for 1. WAITING AREA
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:21PM

1. Summary
Ventilation Sizing Method Sum of Space OA Airflows
Design Ventilation Airflow Rate 502 L/s

2. Space Ventilation Analysis


Floor Maximum Required Required Required Required Uncorrected
Zone Name / Space Name Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Mult. (m²) Occupants (L/s) (L/s/person) (L/(s·m²)) (L/s) (% of supply) (L/s)
Zone 1
1. WAITING AREA 1 265.0 169.0 3049.2 2.50 0.30 0.0 0.0 502.0
Totals (incl. Space Multipliers) 3049.2 502.0

Hourly Analysis Program v5.01 Page 3 of 11


Air System Design Load Summary for 1. WAITING AREA
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:21PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jun 1400 HEATING DATA AT DES HTG
COOLING OA DB / WB 33.6 °C / 25.5 °C HEATING OA DB / WB 21.7 °C / 15.2 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 55 m² 8190 - 55 m² - -
Wall Transmission 44 m² 1116 - 44 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 55 m² 2766 - 55 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 3710 W 3239 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 1500 W 1347 - 0 0 -
People 169 8141 5949 0 0 0
Infiltration - 2587 4322 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 2739 1027 0% 0 0
>> Total Zone Loads - 30125 11298 - 0 0
Zone Conditioning - 31803 11298 - 0 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 3049 L/s 0 - 3049 L/s 0 -
Ventilation Load 502 L/s 5472 9825 502 L/s -336 0
Supply Fan Load 3049 L/s 0 - 3049 L/s 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 37275 21123 - -336 0
Central Cooling Coil - 44479 21123 - -336 0
Central Heating Coil - -7204 - - 0 -
>> Total Conditioning - 37275 21123 - -336 0
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program v5.01 Page 4 of 11


Zone Design Load Summary for 1. WAITING AREA
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:21PM

Zone 1 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jun 1700 HEATING DATA AT DES HTG
COOLING OA DB / WB 33.0 °C / 25.3 °C HEATING OA DB / WB 21.7 °C / 15.2 °C
OCCUPIED T-STAT 23.9 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 55 m² 11195 - 55 m² - -
Wall Transmission 44 m² 1742 - 44 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 55 m² 2724 - 55 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 3710 W 3326 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 1500 W 1375 - 0 0 -
People 169 8740 5949 0 0 0
Infiltration - 2420 4296 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 3152 1024 0% 0 0
>> Total Zone Loads - 34674 11269 - 0 0

Hourly Analysis Program v5.01 Page 5 of 11


Space Design Load Summary for 1. WAITING AREA
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:21PM

TABLE 1.1.A. Component Loads For Space "1. WAITING AREA" In Zone "Zone 1"
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jun 1700 HEATING DATA AT DES HTG
COOLING OA DB / WB 33.0 °C / 25.3 °C HEATING OA DB / WB 21.7 °C / 15.2 °C
OCCUPIED T-STAT 23.9 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
SPACE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 55 m² 11195 - 55 m² - -
Wall Transmission 44 m² 1742 - 44 m² 0 -
Roof Transmission 0 m² 0 - 0 m² 0 -
Window Transmission 55 m² 2724 - 55 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 0 m² 0 - 0 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 3710 W 3326 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 1500 W 1375 - 0 0 -
People 169 8740 5949 0 0 0
Infiltration - 2420 4296 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 3152 1024 0% 0 0
>> Total Zone Loads - 34674 11269 - 0 0

TABLE 1.1.B. Envelope Loads For Space "1. WAITING AREA" In Zone "Zone 1"
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(m²) (W/(m²·K)) Coeff. (W) (W) (W)
N EXPOSURE
WALL 15 2.014 - 674 - 0
WINDOW 1 28 6.208 0.881 1362 5141 0
W EXPOSURE
WALL 29 2.014 - 1068 - 0
WINDOW 1 28 6.208 0.881 1362 6054 0

Hourly Analysis Program v5.01 Page 6 of 11


Hourly Air System Design Day Loads for 1. WAITING AREA
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:21PM

DESIGN MONTH: JULY


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (°C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 27.1 618 9.2 13.0 0.0 0.0 0.0 0.0 0.0 0.0
0100 26.6 569 8.5 12.2 0.0 0.0 0.0 0.0 0.0 0.0
0200 26.2 522 7.8 11.4 0.0 0.0 0.0 0.0 0.0 0.0
0300 25.8 478 7.1 10.6 0.0 0.0 0.0 0.0 0.0 0.0
0400 25.5 439 6.5 9.9 0.0 0.0 0.0 0.0 0.0 0.0
0500 25.4 408 6.0 9.3 0.0 0.0 0.0 0.0 0.0 0.0
0600 25.6 387 5.7 8.9 0.0 0.0 0.0 0.0 0.0 0.0
0700 26.1 382 5.7 8.9 0.0 0.0 0.0 0.0 0.0 0.0
0800 26.9 3049 40.7 61.2 14.9 0.0 0.0 0.0 0.0 0.0
0900 28.1 3049 41.5 62.3 13.7 0.0 0.0 0.0 0.0 0.0
1000 29.4 3049 42.1 62.8 12.8 0.0 0.0 0.0 0.0 0.0
1100 30.9 3049 42.7 63.1 12.1 0.0 0.0 0.0 0.0 0.0
1200 32.4 3049 43.7 64.4 10.1 0.0 0.0 0.0 0.0 0.0
1300 33.5 3049 44.5 65.4 8.5 0.0 0.0 0.0 0.0 0.0
1400 34.2 3049 44.5 64.8 7.9 0.0 0.0 0.0 0.0 0.0
1500 34.4 3049 44.5 64.8 6.1 0.0 0.0 0.0 0.0 0.0
1600 34.2 3049 44.4 64.7 4.5 0.0 0.0 0.0 0.0 0.0
1700 33.5 3049 44.2 64.8 3.4 0.0 0.0 0.0 0.0 0.0
1800 32.6 1090 16.4 20.8 0.0 0.0 0.0 0.0 0.0 0.0
1900 31.4 926 13.9 18.1 0.0 0.0 0.0 0.0 0.0 0.0
2000 30.2 863 12.9 17.1 0.0 0.0 0.0 0.0 0.0 0.0
2100 29.2 797 11.9 16.0 0.0 0.0 0.0 0.0 0.0 0.0
2200 28.3 731 10.9 14.9 0.0 0.0 0.0 0.0 0.0 0.0
2300 27.6 672 10.0 13.9 0.0 0.0 0.0 0.0 0.0 0.0

Hourly Analysis Program v5.01 Page 7 of 11


Hourly Zone Loads for 1. WAITING AREA
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:21PM

ZONE: Zone 1
DESIGN MONTH: JULY
ZONE TERMINAL TERMINAL ZONE
OA ZONE ZONE SENSIBLE ZONE COOLING HEATING HEATING
TEMP TEMP RH AIRFLOW LOAD COND COIL COIL UNIT
Hour (°C) (°C) (%) (L/s) (W) (W) (W) (W) (W)
0000 27.1 26.8 53 617.9 13118.4 9212.6 0.0 0.0 0.0
0100 26.6 26.8 54 569.4 12101.7 8479.8 0.0 0.0 0.0
0200 26.2 26.8 54 521.8 11138.7 7764.1 0.0 0.0 0.0
0300 25.8 26.8 55 478.4 10274.1 7112.1 0.0 0.0 0.0
0400 25.5 26.8 56 439.3 9504.5 6524.7 0.0 0.0 0.0
0500 25.4 26.8 56 407.6 8876.7 6049.8 0.0 0.0 0.0
0600 25.6 26.8 57 386.6 8438.9 5736.4 0.0 0.0 0.0
0700 26.1 26.8 57 382.0 8275.0 5667.0 0.0 0.0 0.0
0800 26.9 24.6 55 3049.2 19382.1 24320.6 0.0 0.0 0.0
0900 28.1 24.4 55 3049.2 21067.8 25541.9 0.0 0.0 0.0
1000 29.4 24.5 55 3049.2 22778.1 26357.0 0.0 0.0 0.0
1100 30.9 24.7 55 3049.2 24551.4 26837.7 0.0 0.0 0.0
1200 32.4 24.5 55 3049.2 26228.1 28847.9 0.0 0.0 0.0
1300 33.5 24.4 55 3049.2 27729.2 30528.6 0.0 0.0 0.0
1400 34.2 24.7 55 3049.2 29768.6 30878.7 0.0 0.0 0.0
1500 34.4 24.8 55 3049.2 31928.4 32648.9 0.0 0.0 0.0
1600 34.2 24.8 55 3049.2 33599.1 34224.5 0.0 0.0 0.0
1700 33.5 24.6 55 3049.2 34450.0 35415.6 0.0 0.0 0.0
1800 32.6 27.0 49 1089.8 23622.2 16412.2 0.0 0.0 0.0
1900 31.4 26.9 50 925.6 20010.5 13891.1 0.0 0.0 0.0
2000 30.2 26.9 51 862.9 18476.9 12931.8 0.0 0.0 0.0
2100 29.2 26.9 51 796.6 16959.1 11921.3 0.0 0.0 0.0
2200 28.3 26.9 52 731.1 15522.6 10926.8 0.0 0.0 0.0
2300 27.6 26.8 52 671.8 14242.0 10026.7 0.0 0.0 0.0

Hourly Analysis Program v5.01 Page 8 of 11


System Psychrometrics for 1. WAITING AREA
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:21PM

June DESIGN COOLING DAY, 1400

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet 33.6 0.01728 502 400 5472 9825
Vent - Return Mixing Outlet 26.1 0.01172 3049 1231 - -
Central Cooling Coil Outlet 13.9 0.00936 3049 1231 44479 21123
Central Heating Coil Outlet 15.9 0.00936 3049 1231 7204 -
Supply Fan Outlet 15.9 0.00936 3049 1231 0 -
Cold Supply Duct Outlet 15.9 0.00936 3049 1231 - -
Zone Air - 24.6 0.01062 3049 1395 31803 11298
Return Plenum Outlet 24.6 0.01062 3049 1395 0 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.204 W/(L/s-K)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2939.9 W/(L/s)
Site Altitude = 21.9 m

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (W) Mode (W) (°C) (L/s) (ppm) (W) (W)
Zone 1 30125 Cooling 31803 24.6 3049 1395 0 0

Hourly Analysis Program v5.01 Page 9 of 11


System Psychrometrics for 1. WAITING AREA
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:21PM

WINTER DESIGN HEATING

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet 21.7 0.00810 502 400 336 0
Vent - Return Mixing Outlet 21.2 0.00810 3049 446 - -
Central Cooling Coil Outlet 21.1 0.00810 3049 446 336 0
Central Heating Coil Outlet 21.1 0.00810 3049 446 0 -
Supply Fan Outlet 21.1 0.00810 3049 446 0 -
Cold Supply Duct Outlet 21.1 0.00810 3049 446 - -
Zone Air - 21.1 0.00810 3049 455 0 0
Return Plenum Outlet 21.1 0.00810 3049 455 0 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.204 W/(L/s-K)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2939.9 W/(L/s)
Site Altitude = 21.9 m

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (W) Mode (W) (°C) (L/s) (ppm) (W) (W)
Zone 1 0 Deadband 0 21.1 3049 455 0 0

Hourly Analysis Program v5.01 Page 10 of 11


Psychrometric Analysis for 1. WAITING AREA
Project Name: OFFICE BUILDING 10/19/2021
Prepared by: MALAYSIA FRANCE INSTITUTE 04:21PM

Location: Kuala Lumpur, Malaysia


Altitude: 21.9 m.
Data for: June DESIGN COOLING DAY, 1400
0.020
1. Outdoor Air
2. Mixed Air
3. Central Cooling Coil Outlet
4. Central Heating Coil Outlet 1 0.018
5. Supply Fan Outlet
6. Room Air
0.016

Specific Humidity ( kg/kg )


0.014
2
0.012
6
3 45 0.010

0.008

0.006

0.004

0.002

0.000
0 5 10 15 20 25 30 35
Temperature ( °C )

Hourly Analysis Program v5.01 Page 11 of 11