Professional Documents
Culture Documents
4.6. Schematic - Bus Riser-J1.10 - R
4.6. Schematic - Bus Riser-J1.10 - R
SCHEMATIC DIAGRAM
A A
For Preliminary
For Approval
B B
For Manufacture
As built
C C
D D
E E
PROJECT NAME:
104MWp SOLAR POWER PLANT
Switching to perfect
CUSTORMER:
R02 03/2019 As built Pham Long VIETSTAR INDUSTRY CORPORATION
R01 02/2019 Modify Pham Long
ADD : T2-4, D1 Street, Saigon Hi-Tech Park, District 9, STERLING & WILSON PRIVATE LIMITED
F Ho Chi Minh City, Vietnam. F
TITLE: Location: +DW18-SAO MAI SLP
R00 12/2018 Approval Pham Long 22KV SWITCHGEAR
Manufacturer Client Consultant Customer
A SCHNEIDER SCHEMATIC DIAGRAM FOR BUS RISER-J1.10
Doc No:
Sheet
SM SLP-22-SC-C41_J1.10
01
Rev. No. Date Description Drawn by Approved
ELECTRIC PARTNER Drawing name: COVER PAGE
Cont.. 02
Contract: 02/SWPL-Vietstar/ 22 KVHT Panel Total 13 Revised R02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET No. DESCRIPTION NO. CATOGARY DESCRIPTION
1 ENCLOSURE Type of switchboard: Metal-clad Swichtgear
First Issue
Revision 1
Revision 2
Revision 3
Revision 4
Revision 5
Revision 6
Approval
=J1.1
TEST POSITION
Q1
B B
=J2.1 =J2.10
TEST POSITION TEST POSITION
Q1 Q1
C C
D D
DS. INTERLOCKING
COIL
E E
F F
Location: + DW18-SAO MAI SLP
Drawn by Pham Long Client ---- PROJECT NAME: TITLE: 22KV SWITCHGEAR
Doc No: SM SLP-22-SC-C41_J1.10
SCHEMATIC DIAGRAM FOR BUS RISER-J1.10
Date 03/2019 Checked by Pham Long Consultant ---- 104MWp SOLAR POWER PLANT Switching to perfect
Sheet 07
Drawing name: CONTROL CIRCUIT
08
Comment As built Approved by Huynh Minh Duc Customer ---- VIETSTAR Contract: 02/SWPL-Vietstar/ 22 KVHT Panel
Cont..
A SCHNEIDER ELECTRIC PARTNER Total 13 Revised R02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
DS POSITION
IN TEST IN-SERVICE
A A
B B
C C
D D
E E
F F
Location: + DW18-SAO MAI SLP
Drawn by Pham Long Client ---- PROJECT NAME: TITLE: 22KV SWITCHGEAR
Doc No: SM SLP-22-SC-C41_J1.10
SCHEMATIC DIAGRAM FOR BUS RISER-J1.10
Date 03/2019 Checked by Pham Long Consultant ---- 104MWp SOLAR POWER PLANT Switching to perfect
Sheet 08
Drawing name: INDICATION CIRCUIT
09
Comment As built Approved by Huynh Minh Duc Customer ---- VIETSTAR Contract: 02/SWPL-Vietstar/ 22 KVHT Panel
Cont..
A SCHNEIDER ELECTRIC PARTNER Total 13 Revised R02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SIGNALS FOR INTERLOCKING
VCB IN TEST
TO BUS COUPLER (J2.10) (FOR ES CIRCUIT) SPARE TO BUSBAR PT1-J1.2
A A
B B
C C
D D
E E
F F
Location: + DW18-SAO MAI SLP
Drawn by Pham Long Client ---- PROJECT NAME: TITLE: 22KV SWITCHGEAR
Doc No: SM SLP-22-SC-C41_J1.10
SCHEMATIC DIAGRAM FOR BUS RISER-J1.10
Date 03/2019 Checked by Pham Long Consultant ---- 104MWp SOLAR POWER PLANT Switching to perfect
Sheet 09
Drawing name: SIGNALS FOR INTERLOCKING
10
Comment As built Approved by Huynh Minh Duc Customer ---- VIETSTAR Contract: 02/SWPL-Vietstar/ 22 KVHT Panel
Cont..
A SCHNEIDER ELECTRIC PARTNER Total 13 Revised R02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
EVOLIS CB IN SERVICE/TEST POSITION
SHOWN WITH VCB IN TEST POSITION
A A
VCB LIMIT SWITCH
INDICATION FOR INTERLOCKING FOR INTERLOCKING FOR INTERLOCKING TEST POSITION
/08/B.3 /09/B.3 /09/B.5 /09/B.7 /08/C.3
B B
DISCONNECT SWITCH 24KV-2500A-25KA
RACK-IN/RACK-OUT POSITION
-Q1
C C
D D
E E
F F
Location: + DW18-SAO MAI SLP
Drawn by Pham Long Client ---- PROJECT NAME: TITLE: 22KV SWITCHGEAR
Doc No: SM SLP-22-SC-C41_J1.10
SCHEMATIC DIAGRAM FOR BUS RISER-J1.10
Date 03/2019 Checked by Pham Long Consultant ---- 104MWp SOLAR POWER PLANT Switching to perfect
Sheet 10
Drawing name: DS TEST/SERVICE POSITION
11
Comment As built Approved by Huynh Minh Duc Customer ---- VIETSTAR Contract: 02/SWPL-Vietstar/ 22 KVHT Panel
Cont..
A SCHNEIDER ELECTRIC PARTNER Total 13 Revised R02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
BUS RISER - J1.10
No. Symbol Name & Description Origin Part Code Unit Quantity
A 1 H10
Pilot lamp /DS READY TO UNLOCK A
Idec -- pcs 1
- Ø = 22mm, GREEN, 220 VDC
Pilot lamp /DS IN TEST
2 H15 Idec -- pcs 1
- Ø = 22mm, GREEN, 220 VDC
Pilot lamp /DS IN-SERVICE
3 H16 Idec -- pcs 1
- Ø = 22mm, RED, 220 VDC
Selector switch 2 position stay put
4 S3 VS/India -- pcs 1
/OFF-UNLOCK
B B
VCB IN TEST VCB IN DS. READY OFF UNLOCK
SERVICE TO UNLOCK
H15 H16 H10 S3
C C
D D
E E
F F
Location: + DW18-SAO MAI SLP
Drawn by Pham Long Client ---- PROJECT NAME: TITLE: 22KV SWITCHGEAR
Doc No: SM SLP-22-SC-C41_J1.10
SCHEMATIC DIAGRAM FOR BUS RISER-J1.10
Date 03/2019 Checked by Pham Long Consultant ---- 104MWp SOLAR POWER PLANT Switching to perfect
Sheet 11
Drawing name: INTERLOCKING LOGIC DIAGRAM
12
Comment As built Approved by Huynh Minh Duc Customer ---- VIETSTAR Contract: 02/SWPL-Vietstar/ 22 KVHT Panel
Cont..
A SCHNEIDER ELECTRIC PARTNER Total 13 Revised R02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SYMBOL POSITION DESCRIPTION MANUFACTURING REFERENCE/TYPE TECHNICAL DATA REMARK
Q1 MV WITHDRAWABLE DISCONNET SWITCH SCHNEIDER 24KV, 2500A, 25KA
QCT LV MCB FOR METER & INDICATION VS V5S-CSMBS2DC06X 2P/6A, 6kA, type C
A QLT MCB FOR LIGHTING & HEATER VS V5S-CSMBS2C06X 2P/6A, 6kA, type C A
LV
H10 D PILOT LAMP: DS READY TO UNLOCK IDEC YW1P-2EQM3G = 22mm, GREEN, 220 VDC
H15 D PILOT LAMP: DS IN TEST IDEC YW1P-2EQM3G = 22mm, GREEN, 220 VDC
H16 D PILOT LAMP: DS IN-SERVICE IDEC YW1P-2EQM3R = 22mm, RED, 220 VDC
KQ0 LV BOX AUXILIARY RELAYS SCHNEIDER RXM4AB1MD COIL 220 VDC, 6A, 4NO + 4NC with Sockets
DSL MV WITHDRAWBLE LOCKING COIL SCHNEIDER 59516 220 VDC
EH MV HEATER FOR CABLE COMPARTMENT VS -- 150W, 220VAC
TH LV BOX THERMOSTAT FOR CABLE COMPARTMENT HANGYONG ND4-PKMR05 220VAC With sensor
L LV BOX LIGHTING LAMP VS -- 220VAC
B LS LV BOX LV'S DOOR SWITCH HANGYONG -- With cover
B
LCRM LV BOX LOOP CIRCUIT RESISTANCE MONITOR VS RSJ-4 220VAC
XDC TOP LV BOX TERMINAL BLOCK - AUX. SUPPLY BUSWIRES - 220 VDC LEIPOLE JST2.5 2.5mm2, 31A
XAC TOP LV BOX TERMINAL BLOCK - AUX. SUPPLY BUSWIRES - 220VAC LEIPOLE JST2.5 2.5mm2, 31A
XB2 TOP LV BOX TERMINAL BLOCK - CONTROL CIRCUIT LEIPOLE JST2.5 2.5mm2, 31A
XB4 TOP LV BOX TERMINAL BLOCK - INDICATION CIRCUIT LEIPOLE JST2.5 2.5mm2, 31A
XSQ TOP LV BOX TERMINAL BLOCK - WITHDRAWABLE DS POSITION LEIPOLE JST2.5 2.5mm2, 31A
XI TOP LV BOX TERMINAL BLOCK - INTERLOCKING LEIPOLE JST2.5 2.5mm2, 31A
C C
D D
E E
APPARATUS SITUATION: D: DOOR
LV: LOW VOLTAGE
MV: MEDIUM VOLTAGE
F F
Location: + DW18-SAO MAI SLP
Drawn by Pham Long Client ---- PROJECT NAME: TITLE: 22KV SWITCHGEAR
Doc No: SM SLP-22-SC-C41_J1.10
SCHEMATIC DIAGRAM FOR BUS RISER-J1.10
Date 03/2019 Checked by Pham Long Consultant ---- 104MWp SOLAR POWER PLANT Switching to perfect
Sheet 12
Drawing name: INTERLOCKING LOGIC DIAGRAM
13
Comment As built Approved by Huynh Minh Duc Customer ---- VIETSTAR Contract: 02/SWPL-Vietstar/ 22 KVHT Panel
Cont..
A SCHNEIDER ELECTRIC PARTNER Total 13 Revised R02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Switchboard code: Panel: Incoming Feeder-Jxx
= DW18-SAO MAI SLP = SM SLP-22-SC-C41_J1.10
Switchboard Destination device
Item Auxiliary Type Remark
A Function Description Terminal Terminal Terminal Terminal A
contact Equipment code
block number block number
-- HW XDC 1 = SM SLP-22-SC-C41
1 Auxiliary DC voltage (220V DC+)
-- HW XDC 2 = SM SLP-22-SC-C41
-- HW XDC 3 = SM SLP-22-SC-C41
2 Auxiliary DC voltage (220V DC-)
-- HW XDC 4 = SM SLP-22-SC-C41
-- HW XAC 5 = SM SLP-22-SC-C41
3 Auxiliary AC voltage (230V AC/L)
B B
-- HW XAC 6 = SM SLP-22-SC-C41
-- HW XAC 7 = SM SLP-22-SC-C41
4 Auxiliary AC voltage (230V AC/N)
-- HW XAC 8 = SM SLP-22-SC-C41
- DI XB2 2 = SM SLP-22-SC-C41_J1.1 XI 5
5 DS interlocking
-- DI XB2 3 = SM SLP-22-SC-C41_J2.1 XI 6
-- DI XB2 4 = SM SLP-22-SC-C41_J2.10 XI 6
C 2 = SM SLP-22-SC-C41_J1.1 XI 43 C
6 DS interlocking NC DI XB2 Auxiliary contact
3 = SM SLP-22-SC-C41_J1.1 XI 44
3 = SM SLP-22-SC-C42_J2.1 XI 27
NC DI XB2 Auxiliary contact
4 = SM SLP-22-SC-C42_J2.1 XI 29
4 = SM SLP-22-SC-C42_J2.10 XI 10
NC DI XB2 Auxiliary contact
5 = SM SLP-22-SC-C42_J2.10 XI 6
NO DO XI 1 = SM SLP-22-SC-C41_J2.10 XB2 43
D 7 DS in test Auxiliary contact D
NO DO XI 2 = SM SLP-22-SC-C41_J2.10 XB2 44
NO DO XI 3 SPARE -- --
Auxiliary contact
NO DO XI 4 SPARE -- --
NO DO XI 5 = SM SLP-22-SC-C41_J1.2 XB2 11
Auxiliary contact
NO DO XI 6 = SM SLP-22-SC-C41_J1.2 XB2 12
E E
F F
Location: + DW18-SAO MAI SLP
Drawn by Pham Long Client ---- PROJECT NAME: TITLE: 22KV SWITCHGEAR
Doc No: SM SLP-22-SC-C41_J1.10
SCHEMATIC DIAGRAM FOR BUS RISER-J1.10
Date 03/2019 Checked by Pham Long Consultant ---- 104MWp SOLAR POWER PLANT Switching to perfect
Sheet 13
Drawing name: INTERLOCKING LOGIC DIAGRAM
END
Comment As built Approved by Huynh Minh Duc Customer ---- VIETSTAR Contract: 02/SWPL-Vietstar/ 22 KVHT Panel
Cont..
A SCHNEIDER ELECTRIC PARTNER Total 13 Revised R02
1 2 3 4 5 6 7 8