I. External Cooling
Load
A. Roof
B. Walls
From Ashrae 1997, Table 11, Chapter 28
Wall Construction:
Layer: Outside Surface Resistance, 100mm Face Brick, 200mm high density
concrete, Inside Surface Resistance, Finish
U = 1/Rt = 1/0.424
U = 2.358 W/m2K
E 26 ˚F
W 25 ˚F
From PAG-ASA annual (Summer 2019) Info
Tm = 34 ˚C = 93.2 ˚F
Tr = 23 ˚C = 73.4 ˚F
Wall Area :
East Wall
West Wall
@East Wall : Qwall = (2.358 W/m2K)( 23.07 m2)( 3.78 ˚C) = 205.63 W
@West Wall : Qwall =(2.358 W/m2K)( 23.07 m2)( 3.22 ˚C) = 175.16W
C. Ceilings
Material: Concrete
Ceiling Area
Area Ceiling = 77.12 m2
Thus,
Q ceiling = 1.874 kW
D. Floors
Slab Floor
Floor Area
Thus,
Q floor = 730.61 W
E. Windows
U = 2.50 W/m2K
CLTD window
Area of Window
Thus,
Q = UACLTD(Number of windows)
Q window = 260.65 W
A. People
A.1 Sensible
Qsensible = NQsCLF
CLF = 0.97
Thus,
Qlatent = NQL
Qlatent = 2.2 kW
B. Lights
W = 12 watts x 8 = 96 W
Thus,
W = 20 watts x 16 = 320 W
Thus,
C. Appliances
Fu = 8hrs/24hr = 0.33
Assume Fr = 1.0
Thus,
Qlatent = Qin x Fu
D. Infiltration
Doors Single 1 12 12
Wiring Caulked 4 2 8
AL Total = 187.12
From ASHRAE 1997, Chapter 25, Table 6
Temperature Difference = 34 ˚C – 25 ˚C = 9 ˚C
Thus,
Qinfiltration= (AL/1000)((Cs(∆T)) + Cw(V)2)0.5
Assume 55% RH
Thus,
Qsensible = CpT(Qrate)
Qsensible = 141.75 W
Qlatent = 4840(Qrate)(∆W)
Qlatent = 34.80 W
E. Miscellaneous Sources
a. Ventilation
No. of Persons = 40
Thus,
Qsensible = 1.08CFM(∆T)
Qsensible = 3.76 kW
Qlatent = 6.63 kW
EQUIPMENT SCHEDULE
INDOOR UNIT
OUTDOOR UNIT
OUTDOOR UNIT