PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S)
Friction Factor
pipe Dia LENGTH /
PIPE DIA WATER λ (through Velocity
from EQ. LENGTH Re=(Density x From CIBSE
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Iteration Pressure Remarks
Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Pa Kpa feet
Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
(mm) Dynamic Viscosity 4.53

d l Re k/d c λ ζ 1/2 ρc2 Pa ft

1 LEVEL P1 HEAT EX. 57.436 73100.00 73.10 24 As advised by UDC

2 HEAT EX. TO HEADER

FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036 0.01 λ = 0.01518

ELBOW 200 202.7 2 57.436 1.78 0.65 1585.57 2061.23 2.061 0.68 Refer Page 7 of 11

PIPE 200 202.7 1 57.436 2.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 240.736 0.241 0.08 λ = 0.01518

MOTORIZED VALVE 200 202.7 1 57.436 1.78 0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11

PIPE 200 202.7 1 57.436 1.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 120.368 0.120 0.04 λ = 0.01518

IV 200 202.7 1 57.436 1.78 0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11

PIPE 200 202.7 1 57.436 1.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 120.368 0.120 0.04 λ = 0.01518

TEE 200 202.7 1 57.440 1.78 0.55 1585.79 872.18 0.872 0.29 Refer Page 6 of 11

HEAT EX./PUMP
3 300 304.8 1 114.872 3.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 178.354 0.178 0.06 λ = 0.01438
HEADER

REDUCER 300 / 250 1 114.872 2.26 0.13 2552.16 331.78 0.332 0.11 Refer 7 of 11

PIPE 250 254.5 1 114.872 2.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 283.809 0.284 0.09 λ = 0.01390

ELBOW 250 254.5 1 114.872 2.26 0.55 2552.16 1403.69 1.404 0.46 Refer Page 7 of 11

PIPE 250 254.5 1 114.872 1.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 141.905 0.142 0.05 λ = 0.01390

TEE 300 304.8 1 114.872 1.58 0.70 1240.51 868.35 0.868 0.28 Refer Page 6 of 11

PIPE 300 304.8 1 114.872 1.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 59.451 0.059 0.02 λ = 0.01438

TEE 300 304.8 1 114.870 1.58 0.70 1240.46 868.32 0.868 0.28 Refer Page 6 of 11

PIPE 300 304.8 1 114.870 3.00 309535.314 3.28083989501E-07 1.58 0.01340 0.01438 1240.46 178.349 0.178 0.06 λ = 0.01438

TEE 300 304.8 1 57.436 0.79 0.50 310.13 155.06 0.155 0.05 Refer Page 6 of 11

4 PUMP SUCTION

PIPE 200 202.7 1 57.436 3.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 361.104 0.361 0.12 λ = 0.01518

IV 200 202.7 1 57.436 1.78 0.03 1585.57 47.57 0.048 0.02 Assumed as Gate Valve. Refer Page 8 of 11

STAINER 200 202.7 1 57.436 1.78 6300.00 6.300 2.07 From Catalouge (Kv value-817) Refer Page 9 fo 11

FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036 0.01 λ = 0.01518

ELBOW 200 202.7 3 57.436 1.78 0.65 1585.57 3091.85 3.092 1.01 Refer Page 7 of 11

5 PUMP DISCHARGE

FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036 0.01 λ = 0.01518

NRV 200 202.7 1 57.436 1.78 3.20 1585.57 5073.81 5.074 1.66 Refer Page 8 of 11

DRV 200 202.7 1 57.436 1.78 1.65 1585.57 2616.18 2.616 0.86 Assumed as Globe Valve

PIPE 200 202.7 1 57.436 3.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 361.104 0.361 0.12 λ = 0.01518

ELBOW 200 202.7 4 57.436 1.78 0.65 1585.57 4122.47 4.122 1.35 Refer Page 7 of 11

PUMP HEADER TO
6
TOWER RISER SUPPLY

TEE 300 304.8 1 57.436 0.79 0.70 310.13 217.09 0.217 0.07 Refer Page 6 of 11

PIPE 300 304.8 1 57.436 3.00 154770.352 3.28083989501E-07 0.79 0.01593 0.01645 310.13 51.024 0.051 0.02 λ = 0.01645

TEE 300 304.8 1 114.872 1.58 0.70 1240.51 868.35 0.868 0.28 Refer Page 6 of 11

PIPE 300 304.8 1 114.872 2.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 118.903 0.119 0.04 λ = 0.01438

TEE 250 254.5 1 114.872 2.26 0.70 2552.16 1786.51 1.787 0.59 Refer Page 6 of 11

PIPE 250 254.5 1 114.872 1.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 141.905 0.142 0.05 λ = 0.01390

ELBOW 250 254.5 1 114.872 2.26 0.55 2552.16 1403.69 1.404 0.46 Refer Page 6 of 11

PIPE 250 254.5 1 114.872 5.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 709.523 0.710 0.23 λ = 0.01390

TEE 250 254.5 1 114.872 2.26 0.70 2552.16 1786.51 1.787 0.59 Refer Page 6 of 11

PIPE 250 254.5 1 113.960 18.00 367775.843 3.92927308448E-07 2.24 0.01283 0.01392 2511.80 2517.622 2.518 0.83 λ = 0.01392

ELBOW 250 254.5 2 113.960 2.24 0.55 2511.80 2762.98 2.763 0.91 Refer Page 7 of 11

TOWER RISER SUPPLY


8 RISER PIPNG
& RETURN

Page 1 of 4
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S)
Friction Factor
pipe Dia LENGTH /
PIPE DIA WATER λ (through Velocity
from EQ. LENGTH Re=(Density x From CIBSE
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Iteration Pressure Remarks
Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Pa Kpa feet
Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
(mm) Dynamic Viscosity 4.53

GROUND FLOOR PIPE 250 254.5 2 103.372 4.10 333605.865 3.92927308448E-07 2.03 0.01315 0.01418 2066.74 961.004 0.961 0.32 λ = 0.01418

TEE 250 254.5 2 103.372 2.03 0.70 2066.74 2893.43 2.893 0.95 Refer Page 6 of 11

1ST FLOOR PIPE 250 254.5 2 98.012 5.00 316307.879 3.92927308448E-07 1.93 0.01333 0.01432 1857.97 1064.183 1.064 0.35 λ = 0.01432

TEE 250 254.5 2 98.012 1.93 0.70 1857.97 2601.15 2.601 0.85 Refer Page 6 of 11

2ND FLOOR PIPE 250 254.5 2 94.402 7.00 304657.556 3.92927308448E-07 1.86 0.01345 0.01442 1723.62 1391.963 1.392 0.46 λ = 0.01442

TEE 250 254.5 2 94.402 1.86 0.70 1723.62 2413.07 2.413 0.79 Refer Page 6 of 11

3RD FLOOR PIPE 250 254.5 2 90.672 4.00 292619.965 3.92927308448E-07 1.78 0.01359 0.01453 1590.11 739.415 0.739 0.24 λ = 0.01453

TEE 250 254.5 2 90.672 1.78 0.70 1590.11 2226.15 2.226 0.73 Refer Page 6 of 11

4TH FLOOR PIPE 250 254.5 2 87.220 3.00 281479.545 3.92927308448E-07 1.72 0.01372 0.01464 1471.34 516.926 0.517 0.17 λ = 0.01464

TEE 250 254.5 2 87.220 1.72 0.70 1471.34 2059.87 2.060 0.68 Refer Page 6 of 11

5TH FLOOR PIPE 250 254.5 2 83.772 3.80 270352.035 3.92927308448E-07 1.65 0.01386 0.01475 1357.30 608.656 0.609 0.20 λ = 0.01475

TEE 250 254.5 2 83.772 1.65 0.70 1357.30 1900.23 1.900 0.62 Refer Page 6 of 11

6TH FLOOR PIPE 250 254.5 2 80.322 3.50 259218.070 3.92927308448E-07 1.58 0.01400 0.01487 1247.81 519.574 0.520 0.17 λ = 0.01487

TEE 250 254.5 2 80.322 1.58 0.70 1247.81 1746.93 1.747 0.57 Refer Page 6 of 11

7TH FLOOR PIPE 250 254.5 2 76.872 3.50 248084.105 3.92927308448E-07 1.51 0.01416 0.01500 1142.92 479.912 0.480 0.16 λ = 0.01500

TEE 250 254.5 2 76.872 1.51 0.70 1142.92 1600.09 1.600 0.52 Refer Page 6 of 11

8TH FLOOR PIPE 250 254.5 2 73.422 3.50 236950.140 3.92927308448E-07 1.44 0.01432 0.01513 1042.63 441.702 0.442 0.14 λ = 0.01513

TEE 250 254.5 2 73.422 1.44 0.70 1042.63 1459.69 1.460 0.48 Refer Page 6 of 11

9TH FLOOR PIPE 250 254.5 2 70.291 3.50 226845.663 3.92927308448E-07 1.38 0.01448 0.01526 955.61 408.255 0.408 0.13 λ = 0.01526

TEE 250 254.5 2 70.291 1.38 0.70 955.61 1337.85 1.338 0.44 Refer Page 6 of 11

10TH FLOOR PIPE 250 254.5 2 67.160 3.50 216741.186 3.92927308448E-07 1.32 0.01464 0.01539 872.37 376.022 0.376 0.12 λ = 0.01539

TEE 250 254.5 2 67.160 1.32 0.70 872.37 1221.32 1.221 0.40 Refer Page 6 of 11

REDUCER 250 / 200 2 63.980 1.98 0.15 1967.45 590.24 0.590 0.19 Refer Page 7 of 11

11TH FLOOR PIPE 200 202.7 2 63.980 3.50 259244.190 4.93339911199E-07 1.98 0.01401 0.01487 1967.45 1024.010 1.024 0.34 λ = 0.01487

TEE 200 202.7 2 63.980 1.98 0.70 1967.45 2754.43 2.754 0.90 Refer Page 6 of 11

12TH FLOOR PIPE 200 202.7 2 60.800 3.50 246358.968 4.93339911199E-07 1.89 0.01418 0.01502 1776.74 933.817 0.934 0.31 λ = 0.01502

TEE 200 202.7 2 60.800 1.89 0.70 1776.74 2487.43 2.487 0.82 Refer Page 6 of 11

13TH FLOOR PIPE 200 202.7 2 57.620 3.50 233473.746 4.93339911199E-07 1.79 0.01438 0.01517 1595.74 847.461 0.847 0.28 λ = 0.01517

TEE 200 202.7 2 57.620 1.79 0.70 1595.74 2234.04 2.234 0.73 Refer Page 6 of 11

14TH FLOOR PIPE 200 202.7 2 54.440 3.50 220588.523 4.93339911199E-07 1.69 0.01458 0.01534 1424.47 764.858 0.765 0.25 λ = 0.01534

TEE 200 202.7 2 54.440 1.69 0.70 1424.47 1994.25 1.994 0.65 Refer Page 6 of 11

15TH FLOOR PIPE 200 202.7 2 51.260 3.50 207703.301 4.93339911199E-07 1.59 0.01480 0.01552 1262.91 686.114 0.686 0.23 λ = 0.01552

TEE 200 202.7 2 51.260 1.59 0.70 1262.91 1768.08 1.768 0.58 Refer Page 6 of 11

16TH FLOOR PIPE 200 202.7 2 48.080 3.50 194818.079 4.93339911199E-07 1.49 0.01504 0.01572 1111.08 611.227 0.611 0.20 λ = 0.01572

TEE 200 202.7 2 48.080 1.49 0.70 1111.08 1555.51 1.556 0.51 Refer Page 6 of 11

17TH FLOOR PIPE 200 202.7 2 44.900 3.50 181932.856 4.93339911199E-07 1.39 0.01530 0.01593 968.97 540.295 0.540 0.18 λ = 0.01593

TEE 200 202.7 2 44.900 1.39 0.70 968.97 1356.55 1.357 0.44 Refer Page 6 of 11

18TH FLOOR PIPE 200 202.7 2 41.720 3.50 169047.634 4.93339911199E-07 1.29 0.01558 0.01617 836.57 473.328 0.473 0.16 λ = 0.01616

TEE 200 202.7 2 41.720 1.29 0.70 836.57 1171.20 1.171 0.38 Refer Page 6 of 11

19TH FLOOR PIPE 200 202.7 2 38.600 3.50 156405.529 4.93339911199E-07 1.20 0.01589 0.01642 716.13 411.495 0.411 0.13 λ = 0.01642

TEE 200 202.7 2 38.600 1.20 0.70 716.13 1002.58 1.003 0.33 Refer Page 6 of 11

20TH FLOOR PIPE 200 202.7 2 35.480 3.50 143763.424 4.93339911199E-07 1.10 0.01623 0.01670 605.04 353.605 0.354 0.12 λ = 0.01670

TEE 200 202.7 2 35.480 1.10 0.70 605.04 847.05 0.847 0.28 Refer Page 6 of 11

21TH FLOOR
PIPE 200 202.7 2 32.360 3.80 131121.319 4.93339911199E-07 1.00 0.01660 0.01701 503.31 325.386 0.325 0.11 λ = 0.01701
PENTHOUSE

TEE 200 202.7 2 32.360 1.00 0.70 503.31 704.63 0.705 0.23 Refer Page 6 of 11

Page 2 of 4
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S)
Friction Factor
pipe Dia LENGTH /
PIPE DIA WATER λ (through Velocity
from EQ. LENGTH Re=(Density x From CIBSE
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Iteration Pressure Remarks
Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Pa Kpa feet
Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
(mm) Dynamic Viscosity 4.53

ROOF LEVEL 2 PIPE 150 154.1 2 26.770 5.13 142680.387 6.4892926671E-07 1.44 0.01626 0.01672 1031.14 1178.410 1.178 0.39 λ = 0.01672

TEE 150 154.1 2 26.770 1.44 0.58 1031.14 1196.12 1.196 0.39 Refer Page 6 of 11

9 ROOF LEVEL 2 FLOOR PIPING SUPPLY

PIPE 150 154.1 2 26.770 7.00 142680.387 6.4892926671E-07 1.44 0.01626 0.01672 1031.14 1609.536 1.610 0.53 λ = 0.01672

IV 150 154.1 1 26.770 1.44 0.03 1031.14 30.93 0.031 0.01 Gate Valve. Refer Page 8 of 11

DRV 150 154.1 1 26.770 1.44 1.86 1031.14 1917.92 1.918 0.63 Assumed as Globe Valve. Refer Page 8 of 11

ELBOW 150 154.1 3 26.770 1.44 0.85 1031.14 2629.40 2.629 0.86 Refer Page 7 of 11

BTU METER 150 154.1 1 26.770 1.44 0.03 1031.14 30.930 0.031 0.01 Assumed as Gate Valve. Refer Page 8 of 11

ELBOW 150 154.1 2 26.770 1.44 0.85 1031.14 1752.93 1.753 0.57 Refer Page 7 of 11

PIPE 150 154.1 2 26.770 1.00 142680.387 6.4892926671E-07 1.44 0.01626 0.01672 1031.14 229.934 0.230 0.08 λ = 0.01672

TEE 150 154.1 2 26.770 1.44 0.58 1031.14 1196.12 1.196 0.39 Refer Page 6 of 11

PIPE 150 154.1 2 26.520 5.00 141347.921 6.4892926671E-07 1.42 0.01630 0.01676 1011.97 1130.374 1.130 0.37 λ = 0.01676

ELBOW 150 154.1 2 26.520 1.42 0.85 1011.97 1720.35 1.720 0.56 Refer Page 7 of 11

TEE 150 154.1 2 26.520 1.42 0.58 1011.97 1169.84 1.170 0.38 Refer Page 6 of 11

AHU TAPPING

PIPE 100 102.3 1 16.400 3.00 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 1016.103 1.016 0.33 λ = 0.01700

ELBOW 100 102.3 2 16.400 2.00 1.10 1992.58 4383.68 4.384 1.44 Refer Page 7 of 11

IV 100 102.3 1 16.400 2.00 0.03 1992.58 59.78 0.060 0.02 Gate Valve. Refer Page 8 of 11

STRAINER 100 102.3 1 16.400 2.00 6652.00 6.652 2.18 From Catalouge (Kv value-229)

FLEX. 100 102.3 1 16.400 0.30 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 101.610 0.102 0.03 λ = 0.01700

AHU 100 102.3 1 16.400 2.00 1992.58 50000.00 50.000 16.40 As advised by UDC

AHU RETURN

FLEX. 100 102.3 1 16.400 0.30 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 101.610 0.102 0.03 λ = 0.01700

PIPE 100 102.3 1 16.400 3.00 131669.977 9.77517106549E-07 2.00 0.01659 0.01700 1992.58 1016.103 1.016 0.33 λ = 0.01700

ELBOW 100 102.3 2 16.400 2.00 1.10 1992.58 4383.68 4.384 1.44 Refer Page 7 of 11

CONTROL VALVE 100 102.3 1 16.400 2.00 2.20 1992.58 4383.68 4.384 1.44 Assumed as Globe Valve. Refer Page 8 of 11

BALANCING CONTROL
100 102.3 1 16.400 2.00 2.20 1992.58 4383.68 4.384 1.44 Assumed as Globe Valve. Refer Page 8 of 11
VALVE

TOWER RETURN TO
10
HEAT EX. HEADER

PIPE 250 254.5 1 113.962 5.00 367782.297 3.92927308448E-07 2.24 0.01283 0.01392 2511.88 699.362 0.699 0.23 λ = 0.01392

ELBOW 250 254.5 2 113.962 2.24 0.55 2511.88 2763.07 2.763 0.91 Refer Page 7 of 11

PIPE 250 254.5 1 113.962 23.00 367782.297 3.92927308448E-07 2.24 0.01283 0.01392 2511.88 3217.063 3.217 1.06 λ = 0.01392

TEE 250 254.5 2 114.872 2.26 0.70 2552.16 3573.02 3.573 1.17 Refer Page 6 of 11

AIR SEPERATOR 250 254.5 1 114.872 2.26 2552.16 15000.00 15.00 4.92 As advised by UDC

PIPE 250 254.5 1 114.872 5.00 370719.082 3.92927308448E-07 2.26 0.01281 0.01390 2552.16 709.523 0.710 0.23 λ = 0.01390

REDUCER 250 / 300 1 114.872 1.58 0.13 1240.51 161.27 0.161 0.05 Refer Page 7 of 11

PIPE 300 304.8 1 114.872 1.00 309540.703 3.28083989501E-07 1.58 0.01340 0.01438 1240.51 59.451 0.059 0.02 λ = 0.01438

TEE 300 304.8 1 114.872 1.58 0.55 1240.51 682.28 0.682 0.22 Refer Page 6 of 11

PIPE 300 304.8 1 57.436 3.00 154770.352 3.28083989501E-07 0.79 0.01593 0.01645 310.13 51.024 0.051 0.02 λ = 0.01645

TEE 300 304.8 1 57.436 0.79 0.70 310.13 217.09 0.217 0.07 Refer Page 6 of 11

11 HEAT EX. TAPPING

PIPE 200 202.7 1 57.436 4.00 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 481.471 0.481 0.16 λ = 0.01518

ELBOW 200 202.7 1 57.436 1.78 0.65 1585.57 1030.62 1.031 0.34 Refer Page 7 of 11

IV 200 202.7 1 57.436 1.78 0.03 1585.57 47.57 0.048 0.02 Gate Valve. Refer Page 8 of 11

STRAINER 200 202.7 1 57.436 1.78 6300.00 6.300 2.07 From Catalouge (Kv value-817) Refer Page 9 of 11

FLEX. 200 202.7 1 57.436 0.30 232728.186 4.93339911199E-07 1.78 0.01439 0.01518 1585.57 36.110 0.036 0.01 λ = 0.01518

Page 3 of 4
PUMP HEAD CALCULATION FOR VIVA BAHRIYA PROJECT

Relative Fluid Velocity


Reynolds Number Friction Factor Pressure Loss
Internal Roughness (M/S)
Friction Factor
pipe Dia LENGTH /
PIPE DIA WATER λ (through Velocity
from EQ. LENGTH Re=(Density x From CIBSE
SI.NO LEVEL DESCRIPTION (mm) QTY FLOW (L/S) k = 0.10mm (From V = Water Flow λ = 0.11((k/d) + Iteration Pressure Remarks
Catalouge (MTR) Velocity x Pipe Dia) / Table 4.47 to Pa Kpa feet
Table 4.1) (m3/s) / Area m2 (68/Re))0.25 formula)
(mm) Dynamic Viscosity 4.53

TOTAL (excluding HEX, AHU & AIR SEPARATOR) 159134.23 159.13 52.20

SAFETY FACTOR 10% 7956.71 7.96 2.61

GRAND TOTAL (excluding HEX, AHU & AIR SEPARATOR) 167090.94 167.09 54.81

GRAND TOTAL (including HEX, AHU & AIR SEPARATOR) 305190.94 305.19 100.10

= λ x l/d x 1/2 ρc2 Pump Affinity Law

q1/q2 = n1/n2 q1 = 114.872 l/s

= ζ x 1/2 ρc2 dp1/dp2 = (n1/n2)2 dp1 = 3.75bar

dp1/dp2 = (q1/q2)2 q2 = 118 l/s


λ = Friction Co efficient dp2 = dp1 / (q1/q2) 2

ζ = Pressure Loss Factor


l = Length in Meter. dp2 = 3.96 bar
d = Diameter
ρ = Density (Kg/m3)= 1000

c = Velocity (m/s)

Page 4 of 4