Emergency Lights Central Battery System Testing and Commissioning Method of Statement
Emergency Lights Central Battery System Testing and Commissioning Method of Statement
Emergency Lights Central Battery System Testing and Commissioning Method of Statement
Abbreviations
EMS: Energy
Management System
W: Watts
Reference & Related Standards
Project Quality Plan / Commissioning Plan
Commissioning Team/CxT.
In case of failure in any test, the Commissioning team will rectify, and
CxT to re-offer the test for re- inspection and approval.
QA/QC Engineers
Specialist Sub-Contractors
Prepare safety permits in advance and obtain approval as per the site
safety requirements.
Visual Inspections
Address each individual emergency light and exit fitting as in lay out
drawings.
Functional Test:
Mechanical Check
Insulation Measurement
Reconnect the mains connecting lead and the lead to the emergency
lights.
Panel Detail
Battery Output
Battery Capacity
Number of Blocks
The CxT should verify any as-built record of testing and confirm that
the information meets the project requirements.
All the instruments engaged for testing shall have valid calibration
and certificate should be furnished at site.
Attachments
Arrange lighting on the work area and provide task light and
ventilation in the work area.
Keep all the leads and cables off the ground, use cable hangers as
applicable.
Before starting the testing evacuate all other workers from that area
that are not related with the testing.
All the power tools and leads that will be used must be inspected by
the competent electricians.
Do not work on live system; isolate the supply from the main and
physically remove the connections prior to start doing any
maintenance.
Safety team will monitor the entire activities and they shall be
informed prior to start of every activity by the responsible testing
commissioning engineer.
All accidents, incidents and near misses must be reported to safety
team immediately.