Method of Statement
Method of Statement
.As we made the site visit to Al Rayyan municipality building and saw how it is
a very sensitive place of serving people in Al Rayyan area so every system and
equipment has to be working in perfect condition and to make sure that no
failure happens that cause any bad effect in serving people , so please accept
our method of statement that trying to achieve the mentioned before.
.For HVAC system :
.Normal daily procedure :
A/C technicians will check all HVAC system that are working in healthy
condition without any problem such as :
Package units are working effectively achieving the demand cooling
temperature, belts are in good condition to avoid sudden belts cut and
no up normal noise from bearings or fan or any of components.
Ducting and air distribution diffusers are delivering proper quantity of air
and no blockage or flexible duct cut.
.A/C duct split or wall mounted split units to be checked for refrigerant
and any piping leak.
Cleaning filters and fan every 1 weeks (for package units, duct and wall
mounted split units) to be on Saturday as no duty.
Checking exhaust fans are working perfectly without any problem.
For urgent call : if the duty already finished and an urgent call received ,
maintenance team should reach the site in maximum 2 hours to achieve the
mentioned task.
.Note :
If any spare part not available in site or will not in suppliers stock within 24
hours , maintenance engineer should give full information to Al Rayyan
municipality responsible engineer based on supplier delivery status.
For urgent call : if the duty already finished and an urgent call received ,
maintenance team should reach the site in maximum 2 hours to achieve the
mentioned task.
.Note :
If any spare part not available in site or will not in suppliers stock within 24
hours , maintenance engineer should give full information to Al Rayyan
municipality responsible engineer based on supplier delivery status.
For urgent call : if the duty already finished and an urgent call received ,
maintenance team should reach the site in maximum 2 hours to achieve the
mentioned task.
.Note :
If any spare part not available in site or will not in suppliers stock within 24
hours , maintenance engineer should give full information to Al Rayyan
municipality responsible engineer based on supplier delivery status.
For urgent call : if the duty already finished and an urgent call received ,
maintenance team should reach the site in maximum 2 hours to achieve the
mentioned task.
.Note :
If any spare part not available in site or will not in suppliers stock within 24
hours , maintenance engineer should give full information to Al Rayyan
municipality responsible engineer based on supplier delivery status.
.For electrical system (LV panels , submain panels and distribution boards) :
.Normal daily procedure :
.Before duty time to check any all breakers in LV panel and all individual
breakers in panels on switch on.
.In case of main power failure , electrical team go directly to LV room to check
the status of LV panel and to determine the problem :
For urgent call : if the duty already finished and an urgent call received ,
maintenance team should reach the site in maximum 2 hours to achieve the
mentioned task.
.Note :
If any spare part not available in site or will not in suppliers stock within 24
hours , maintenance engineer should give full information to Al Rayyan
municipality responsible engineer based on supplier delivery status.
.For generator :
.Normal daily procedure :
.All connections coming from LV panel to generator to be checked.
.Weekly oil and filter to be checked and to start generator for working test for
10 minutes and readings will be recorded in the weekly report.
.Note :
If any spare part not available in site or will not in suppliers stock within 24
hours , maintenance engineer should give full information to Al Rayyan
municipality responsible engineer based on supplier delivery status.
.Note :
If any spare part not available in site or will not in suppliers stock within 24
hours , maintenance engineer should give full information to Al Rayyan
municipality responsible engineer based on supplier delivery status.
.For lifts :
.Any problem happens , all electrical connections will be checked if problem
not solved , AL MUFTAH ELEVATORS will be responsible to rectify the problem.
.Weekly test will be done by Saturday to check all lifts and its interface with fire
alarm.
For urgent call : if the duty already finished and an urgent call received ,
maintenance team should reach the site in maximum 2 hours to achieve the
mentioned task.
.Note :
If any spare part not available in site or will not in suppliers stock within 24
hours , maintenance engineer should give full information to Al Rayyan
municipality responsible engineer based on supplier delivery status.
.Note :
.All mentioned tasks in the previous method of statement is general , and if we
will be responsible for the building maintenance , a weekly detailed schedule
of method of statement will be arranged.