Project HISN A’ SHUMOOKH Date 28-03-2022

Client Royal Court Affairs Panel Ref MSB Cubicle-6


Oman National Engineering & Investment
Contractor Company (S.A.O.G.) Doc ref SPB-TR-001-R1
Sub NEW SERVICE
SINGLE PHASE BUSINESS LLC Location
Contractor COMPOUND LV ROOM

FIELD TEST REPORT FOR LV ACB

MAKE ABB Nominal Voltage (Ue) 690 V Serial Number A0891B05C


Model SACE E2 Nominal Current (In) 2000 A Feeder Ref. 6.2

Testing Equipment Details:


Equipment Name Make & Model Serial Number Calibration Validity
Digital Multimeter HIOKI / DT4254 210816764 11-02-2023
CB Analyser & Timer Kit DC POWER/ CAT35 20U398 11-06-2022
Digital Insulation Tester HIOKI / IR3455 211010083 11-02-2023
Primary Injection Kit MEGGER/ PCITS 2000/2 101363461 31-01-2023

1. Insulation Resistance Test: (Not Possible, since transformer LV Side cable is connected and neutral
point is earthed).

Insulation Resistance (T)


CB Condition
R-E Y-E B-E R-Y Y-B B-R
Closed

Insulation Resistance Values (T)


CB Condition
R-R’ Y-Y’ B-B’
Open 87.7G 96.7G 87.8G

2. Contact Resistance Test:

CB condition Injected Current Measured Ohms (µΩ)


(Amps) R-Phase Y-Phase B-Phase
Closed 100 37.6 41.0 33.7

3. Primary Injection Test:

Overload protection: (L)

Pickup Current Test:

Set current (Amps) Pickup Current (Amps)


R-Phase Y-Phase B-Phase
0.4*2000= 800 842 845 856

Trip timing test:


Set time (Sec) Injected Current Tripping Time (Sec)
(Amps) R-Phase Y-Phase B-Phase
3 1350 41 40 42

Ground Protection: (G)

Pickup Current Test:

Set current (Amps) Pickup Current (Amps)


R
0.1*2000=200 228

Trip timing test:

Set Time (Sec) Trip Time (Sec)


R
0.1 1

Note:
1. During testing, ACB settings made into minimum setting current at 0.4 In and time at 3 Sec. After
testing done, settings was normalized.
2. Tripping time mentioned above, the values are approximately equal to.

4. LV ACB General Operational checks:

a) LV ACB Rack in & Out----------------------------------------- NA.


b) LV ACB Spring charge Manual ---------------------------------OK.
c) CB close & Open operation by Manual and Electrical-----------OK.
d) Alarm indication & Trip reset button -------------------------OK.

5. Remarks/Observations: Tested and found breaker healthy.

Tested by Single Phase Business Witnessed by Royal Court Affairs


Sign Sign

Name C.Muruganantham Name

Date 31-03-2022 Date