Dual Plate Checks
2” to 80”. Up to ASME 2500 & API 6A, -196 oC to 900 oC
Wafer, Lugged, Flanged, Butt weld, Jacketed , API 594, 598 & 6D, BS 6364, API 6FA
Actuated Valves
Range Valves with Electro-Hydraulic Actuators
Actuator Makes : Rotork, Leden…
Power Supply : 3- Phase/Single Phase, 50 HZ/60 HZ
Control Signal : MODBUS Serial/Foundation, Fieldbus/Profibus,
Hard contacts etc.
Supplied to:
SATORP
Saudi Aramco & TOTAL JV
Jubail Export Refinery
Through SK Engineering
02/13
48” & 54”, # 150, LCC Valve with Inc 718 shaft + Inc 625 seating
GASCO – Habshan Flare Gas Recovery Project through CCC
Selected as a superior alternate to Ball Valves
03/13
Supplied to:
IOCL Paradeep
Refinery Project,
Essar Projects
PMC – Foster
Wheeler
08/14
16”-32” Stainless
Steel material
for Sour Service
at Mangalore PTA
plant supplied
through Technip
Range:
16”-32” #150-#300
Long face-to-face
Flanged end
connections
18” Model 51
Special Pneumatic Actuator, Supplied to:
Extended Double Flanged Indian Oil Corporation Ltd.
Specialized for
LNG & Cryo Services
03 / 22
06/12
72” 1800mm, PN 6
Fabricated Valve Body
Carbon Steel Disc &
Stainless Steel Trims
Pneumatic operated
for ESD
closing time < 3 sec
Bhushan Steel
Blast Furnace Flame Gas
(2007)
06/12
Pneumatic Actuators
Electro Hydraulic Actuators
11/14
12” # 300
Tested at Cryo
temperatures of -196°C.
Long pattern,
with butt weld-ends.
36” #150
Supplied to
GAIL PATA India
Tested at -450C
Internal Cryogenic
Testing Facilities
as per EIL spec
(in line with BS 6364)
with Helium as test medium,
and Liquid Nitrogen as
cooling agent.
09/14
20” #900
Part of Supplies to
Chevron Phillips
Chemical (CPChem)
US Gulf Coast Project
Tested at -196 ˚C (-320 ˚F)
04/16
36” #150
Complete
Stainless Steel
(Also covered up to
42” #300 & 20” #900)
Chevron Phillips
Chemical
(CPChem)
Project, US
Tested at -196 ˚C
(-320 F)
05/16
Supplied to :
Year : 2018-19
Project :
Compressor Station At
The Onshore Processing Facility
In The Sakhalin Island. Of The
Russian Federation
EPC : Petrofac
11 / 19
08/21
06/12
Range: 2” to 80” ANSI #2500
Standards: API 594, 598 & 6D, BS 6364, CE
Wafer, Lugged, Flanged, Butt weld, Jacketed
Triple Offset Actuated Butterfly Valves
Range from 4” – 42” #150, #300, #600
(Manual and Actuated, Tested at -196 ˚C (-320 F)
03/19
28” # 300
Carbon Steel Valve
36” line size
Pneumatic Actuator
Cairn Energy
Bhogat Terminal
Through IOT.
03/13
Supplied to
Reliance Jamnagar Refinery
03/13
MOC: WCB / CA – 15
EPC: Bechtel
Stainless Steel
Supplied to:
GASCO, For 4th NGL Project through GS Petrofac JV
06/12
Bechtel USA
Chenniere LNG
Regasification
Terminal (2006)
03/13
07/12
20” - 48”
# 150
SGI/AB2
Sea Water
Offsite utilities
Supplied to
IOCL
Paradeep
through
Kazstroy
03/13
12/16
66”& 56”
#150
Supplied to
Petronas for
RAPID Project
through
Technip and
Fluor
68” #300
LCB/LCB/Stellite seats
Low Temperature Service
Butt-weld with Pup-piece
Supplied to
CB&I / Zachry
via
Sunbelt
Project : Freeport LNG
06/2017
60”#300
Supplied to :
Samsung Engineering
Co. Ltd.
Project :
RAPID Package
11 EO/EG
End User: Petronas
MOC : WCB/CA15
09/2017
12”& 8”#150
AB2, PN10,
Monel 400
Welding
Supplied to
NFE2 LNG
Project through
Fluor
Supplied to:
CCC / Vijay Arabia
Project :
HIA’s multi-
phased expansion
QATAR Project
End User :
MATAR
03 / 22
06/12
06/12
02/13
Supplied to:
EIL –
Engineers
India Limited
MRPL &
BPCL Kochi
Refineries
06/12
06/12
96” 2400mm
PN 10 #150
Supplied to:
Dangote
Refinery
Lagos,
Nigeria
06/21
06/12
Supplied to:
Tecnimont, Italy
Project :
Amur Gas Chemical
Complex (AGCC),
Russia
End User :
Amur GCC, LLC
04 / 22
06/12
08/21
06/12