The document provides a cost estimate for two piling options. Option 1 involves installing 258 piles with a diameter of 750mm, along with a pile cap beam, for a total cost of Rs. 4,26,05,660. Option 2 involves installing 310 piles with a diameter of 500mm, along with a pile cap, for a total cost of Rs. 2,27,70,552. The document lists the unit rates and quantities for each item involved in the piling and pile cap work for both options.
The document provides a cost estimate for two piling options. Option 1 involves installing 258 piles with a diameter of 750mm, along with a pile cap beam, for a total cost of Rs. 4,26,05,660. Option 2 involves installing 310 piles with a diameter of 500mm, along with a pile cap, for a total cost of Rs. 2,27,70,552. The document lists the unit rates and quantities for each item involved in the piling and pile cap work for both options.
The document provides a cost estimate for two piling options. Option 1 involves installing 258 piles with a diameter of 750mm, along with a pile cap beam, for a total cost of Rs. 4,26,05,660. Option 2 involves installing 310 piles with a diameter of 500mm, along with a pile cap, for a total cost of Rs. 2,27,70,552. The document lists the unit rates and quantities for each item involved in the piling and pile cap work for both options.
The document provides a cost estimate for two piling options. Option 1 involves installing 258 piles with a diameter of 750mm, along with a pile cap beam, for a total cost of Rs. 4,26,05,660. Option 2 involves installing 310 piles with a diameter of 500mm, along with a pile cap, for a total cost of Rs. 2,27,70,552. The document lists the unit rates and quantities for each item involved in the piling and pile cap work for both options.
OPTION -01 (Single Row of 750mm dia pile) 1 Pile Bore (750mm dia) RMT 16.00 950.00 15,200.00 2 Pile Concrete (for 16M) cum 7.07 6950.00 49,102.00 3 Steel 25dia (315M) with Stirrup Kg 1306.64 70.00 91,465.00 4 Muck Disposal cum 7.06 250.00 1,765.00
Total (Cost of One Pile) 1,57,532.00
Total (Cost of 258 Pile) 4,06,43,256.00
Pile Cap Beam
1 Dismentilng of Pile cum 0.44 3600.00 1,588.00 2 Excavation cum 71.18 250.00 17,795.00 3 PCC 75mm thick cum 9.70 4370.00 42,400.00 4 Steel 16dia (315M) with Stirrup Kg 7091.51 70.00 4,96,406.00 5 Surafce bar 12 dia (2x2 nos) Kg 941.60 70.00 65,912.00 6 Stirrup Outer 10mm dia Kg 2823.05 70.00 1,97,614.00 7 Stirrup Inner 10mm dia Kg 1674.69 70.00 1,17,229.00 8 RCC of Pile Cap cum 125.09 6950.00 8,69,383.00 9 Shuttering sqm 280.14 550.00 1,54,077.00
TOTAL (Cost of Pile Cap Beam for 750mm dia 19,62,404.00 Pile) TOTAL (Option-01) 4,26,05,660.00
S. No. Description Unit Quantity Rate Amount
OPTION -02 Double Row of 500mm dia pile) 1 Pile Bore (500mm dia) RMT 16.00 600.00 9,600.00 2 Pile Concrete (for 16M) cum 3.14 6950.00 21,823.00 3 Steel 20dia with stirrup Kg 460.00 70.00 32,200.00 4 Muck Disposal cum 0.20 250.00 49.00
Total (Cost of One Pile) 63,672.00
Total (Cost of 310 Pile) 1,97,38,320.00 Pile Cap 1 Dismentilng of Pile cum 0.20 3600.00 707.00 2 Excavation cum 214.59 250.00 53,648.00 7 PCC 75mm thick cum 29.18 4370.00 1,27,536.00 8 Steel 12dia @150 c/c bothways Kg 13556.58 70.00 9,48,961.00 9 RCC of Pile Cap cum 251.15 6950.00 17,45,521.00 10 Shuttering sqm 283.38 550.00 1,55,859.00 PILE COST 14-01-2023
S. No. Description Unit Quantity Rate Amount
TOTAL 30,32,232.00 (Cost of Pile Cap for 500mm dia Pile) TOTAL (Option-02) 2,27,70,552.00