TS - LR Bend
TS - LR Bend
TS - LR Bend
MECON LIMITED
DELHI - 110 092
TECHNICAL SPECIFICATION
FOR
LONG RADIUS BENDS
MEC/TS/05/62/015 REVISION 1
CONTENTS
1.0 SCOPE
3.0 MATERIAL
4.0 MANUFACTURE
7.0 WARRANTY
8.0 DOCUMENTATION
MEC/TS/05/62/015 REVISION 1
1.0 SCOPE
Reference has also been made in this specification to the latest edition of the
following codes, standards and specifications.
3.0 MATERIALS
3.1 Bends shall be fabricated from bare steel line pipe (to be issued as free issue
item by Purchaser). The details of free issue line pipe material is given
separately in LR Bend Data Sheet & Purchase Requisition.
MEC/TS/05/62/015 REVISION 1
3.2 All mechanical properties of the bends after finishing shall be same as pipe
specification as referred in section 3.1. The following tests shall be conducted
on finished bends and test procedures shall be as per pipe specification as
referred in para 3.1.
3.2.1 One transverse tensile test will be conducted to establish the yield strength,
ultimate tensile strength and elongation of :
3.2.2 One all weld tensile test will be conducted (wherever applicable) to establish
yield strength, ultimate tensile strength and elongation of weld material on
bend.
3.2.3 Three transverse Charpy-V-notch impact tests shall be conducted on full sized
specimen of the same heat in accordance with ASTM A370 at 0°C for each of
the following :
One face and one root guided bend weld test shall be performed on samples
cut from one bend per heat of steel. The dimensions `A’ in guided bend test
shall not exceed 4.0 times the nominal wall thickness and dimension `B’ shall
be equal to A + 2t + 3.2mm.
4.0 MANUFACTURE
4.1 Bends shall be manufactured by hot bending of pipe applying induction heating
only.
MEC/TS/05/62/015 REVISION 1
4.2 When bending, the weld wherever applicable shall be located at approx. 10° from
the neutral zone, measured at outside of the bend as indicated in figure below.
10°
W E LD H ER E B E N D IN G P L A N E
OR
HERE
BEND
10°
4.3 Bevels at the ends shall be as specified in MSS-SP-75 unless otherwise specified
differently in the material/ purchase requisition.
4.6 The cooling of the bend immediately after bending shall be an interval cooling,
alternatively with water and air at a minimum pressure of 2 atmospheres.
4.7 The procedure shall be such which shall not require any additional heat –
treatment after bending. If such a heat treatment is required, it is permitted only
after the written approval of purchaser and shall be carried out at Manufacturer’s
expense.
4.8 Bulges, dents and flat areas shall not appear within 100mm from end of the bend.
For the remaining part of the bend these deviations from the original contour of
the pipe are permitted but the same shall be repaired, provided these deviations
shall not exceed 6.5% of nominal wall thickness in height/ depth and the same
shall not extend (in any direction) over a distance of more than 25% of nominal
diameter.
4.9 The excess weld material wherever applicable at the inside of the bend shall be
removed over a distance of 100mm at both ends.
4.10 Tolerances
The dimensions of bends shall be controlled to make sure that they are
manufactured according to the tolerances indicated below over and above the
requirements of MSS-SP-75
MEC/TS/05/62/015 REVISION 1
4.10.1 Minimum Inside Diameter : -2.5% of inside nominal
diameter except 200mm from ends
4.10.2 The manufacturer shall check the wall thickness of the pipe before and after
bending along the outside radius either at distances approximately equal to
pipe diameter or 300mm whichever is less. The measured wall thickness shall
be atleast equal to :
OD max. – OD min
OD nom.
The above value shall be < 1% within 100mm from each end and < 6% for
remaining part of the bend. The measurement shall be made over the
circumference of the bend either at distance approximately equal to pipe
diameter or 300mm whichever is less.
4.10.4 Wrinkles
Measurements of the outside diameter shall be taken in the plane of the bend
at locations where wrinkles are present (OD max.) and at locations where
wrinkles are not present (OD min,). The acceptance limit shall be as defined
below.
OD max. – OD min
------------------------- < 1%
OD nom.
MEC/TS/05/62/015 REVISION 1
5.1 The manufacturer shall perform all inspection and tests as per the
requirements of this specification and MSS-SP-75 prior to shipment at his
works. Such inspection and tests shall be, but not limited to, the following :
Manufacturer shall give reasonable notice of time and shall provide without
charge reasonable access and facilities required for inspection, to the
Purchaser’s Representative. Inspection and test performed or witnessed by
Purchaser’s Representative shall in no way relieve the Manufacturer’s
obligation to perform the required inspection and tests. Under no
circumstances any action of the Purchaser’s Representative shall relieve the
Manufacturer of his responsibility for the material, design, quality and
operation of the equipment.
MEC/TS/05/62/015 REVISION 1
The Manufacturer shall produce the Certificates (in original) for all, but not
limited to, the following :
In case any of the above said certificates are not available during the final
inspection, the supply shall be considered incomplete.
6.2 All loose and foreign material i.e. rust, grease, etc. shall be removed from
inside and outside of the bends.
6.3 All bends except bevelled ends shall be coated internally and externally with a
thin film of zinc chromate red oxide paint for protection against corrosion
during transit and storage. The coating shall be easily removable in the field.
Manufacturer shall furnish the details for the same.
6.4 Both ends of all bends shall be suitably protected to avoid any damage during
transit by means of metallic bevel protectors.
6.5 Package shall be marked legibly with suitable marking to indicate the
following:
a) Order Number
b) Package Number
c) Manufacturer’s Name
d) Size (Inches) and wall thickness (mm)
MEC/TS/05/62/015 REVISION 1
7.0 WARRANTY
8.0 DOCUMENTATION
8.2 At the time of bidding, bidder shall submit the following documents :
8.3 Within one week of placement of order the Manufacturer shall submit four
copies, of the manufacturing process and quality assurance plan for pipe and
bends.
Once the approval has been given by Purchaser any change in material and
method of manufacture and quality control shall be notified to Purchaser
whose approval in writing of all such changes shall be obtained before the
bends are manufactured.
8.4 Within four weeks from the approval date Manufacturer shall submit one
reproducible and six copies of the documents as stated in para 8.3 of this
specification.
8.5 Prior to shipment, the Manufacturer shall submit one reproducible and six
copies of test certificates as listed in para 5.3 of this specification.