Bms System
Bms System
Bms System
Return NORTH
T
T T T FS
T T
P QIBLA
3.50
CHILLER 01
CHILLER 02
CHILLER 06
Water Tank
WATER LEAK DETECTION SYSEM P1
3.381
3.420
3.332
3.619
T T T T P
P2
Control Panel
LEGEND:-
LEVELS REFERENCE
DDC Controller
PV.L PAVEMENT LEVEL S.L
SLAB LEVEL
LS.L LANDSCAPE LEVEL T.O.P TOP OF PARAPET
ST.L STREET LEVEL T.O.C TOP OF COPING
CHILLER PLANT MANAGEMENT SYSTEM
F.F.L FLOOR FINISH LEVEL C.L CANOPY LEVEL
MONITORING T.L. TOP LEVEL W.A.L WALKWAY LEVEL
MONITORING STATION CONTROLLER
NOTES:-
CHILLERS HEAT EXCHANGER WATER LEAK DETECTION SYSEM BOOSTER PUMPS copied or used without the above consultant authority.
2. Do not scale from this drawing.
P2 P2 P1 VACUUM PUMP
FIRE PUMP SET
CONTROL PANEL Control Panel
CONTROL PANEL P1
P2
Control Panel
DDC Controller
DDC Controller
CLIENT
DDC CONTROLLER
DDC CONTROLLER
P
P1 P2 P3 P4 MAIN CONSULTANT
DPS DPS
P2 LOCAL CONSULTANT
CONTROL PANEL FS
CONTROL PANEL
Control Panel
BAYATY ARCHITECTS
ABU DHABI
Tel + 971 2 6311880- Fax + 971 26311775
P.O Box 75417 Abu Dhabi U.A.E
E-mail: bayaty@emirates.net.ae
MECHANICAL P- 502
BMS-OV-501 00
UPS
Lift SUBMISSION DATE : SCALE :
- -
MONITORING
MONITORING
MONITORING
MONITORING
Enthalpy Sensible
DPS
Heat Recovery Wheel Heat Recovery Wheel Panel Filter RETURN AIR TO AHU QIBLA
3.50
2.25
Fresh Air
Extruct Air From FAHU
Return/Ectract Air VAV
SD CO2 P T H
3.381
3.420
3.332
3.619
Panel DPS DPS
Filter Filter Bag Filter Cooling Coil Elec. Heater RETURN AIR Supply Air to Space
Cleanable SD T H
NOTES:-
REV.
DESCRIPTION DATE CHECKED APPROVED
NO.
DPS
Extract Air
Extract Air
0 FINAL DESIGN 07.06.18
CLIENT
M
Cooling coil
DPS
Extract Air
Supply Air Space
Extract Air
LCD Display
RAK
PICBV
STARTER PANEL M
OPERATOR
STARTER PANEL
x2
x2
CONTROLLER
DDC CONTROLLER
1X2 Core 22 AWG Shielded Cable 1X2 Core 22 AWG Shielded Cable LOCAL CONSULTANT
DDC CONTROLLER
BAYATY ARCHITECTS
ABU DHABI
Tel + 971 2 6311880- Fax + 971 26311775
P.O Box 75417 Abu Dhabi U.A.E
E-mail: bayaty@emirates.net.ae
NOTE: Geust room FCU shall be as above without BMS connection and FANS ANANTARA MINA AL ARAB
TWIN EXTRACT FANS SET RAS AL KHAIMAH RESORT
controlled by GRMS (see electrical design)
AREA NO. PLOT
601 5015
TITLE
BMS LAYOUT
DPS TYPICAL DETAILS-2
MECHANICAL P- 502
WATER FILTER
T SPACE
JUNE 2018 N.T.S
PROJECT ID : PLAN ID :
DDC Controller
- -
DDC CONTROLLER
DDC CONTROLLER
Note: The shown BMS connection points are for one unit (pump, board, fan,...) but they are required for each unit shown on MEP drawings.
NORTH
2.25
U
BALANCING Space
POWER / CONTROL TANK HEAT/COOL
PANEL PUMP T LEVEL SENSOR
Return Air
3.381
3.420
3.332
3.619
P1
T H
F T
FROM POOL OR TO POOL OR
WATER FEATURE WATER FEATURE FUEL STORAGE TANK
FILTER MV
IV QIBLA DIRECTION TO BE VERIFIED BY SITE ENGINEER.
Unit Control Panel
LEGEND:-
T P1 T
LEVELS REFERENCE
Dos. Dos. PV.L PAVEMENT LEVEL S.L
SLAB LEVEL
PUMP PUMP LS.L LANDSCAPE LEVEL T.O.P TOP OF PARAPET
ST.L STREET LEVEL T.O.C TOP OF COPING
F.F.L FLOOR FINISH LEVEL C.L CANOPY LEVEL
T.L. TOP LEVEL W.A.L WALKWAY LEVEL
NOTES:-
REV.
DESCRIPTION DATE CHECKED APPROVED
NO.
SWIMMING POOL SYSTEM / WATER FEATURE SYSTEM PRECISE AC /CHILLED WATER UNIT MAIM FUEL STORAGE TANK
CLIENT
RAK
OPERATOR
MONITORING MONITORING
MONITORING MAIN CONSULTANT
1X2 Core 18 AWG Shielded Cable 1X2 Core 18 AWG Shielded Cable 1X2 Core 18 AWG Shielded Cable 1X2 Core 18 AWG Shielded Cable
1X2 Core 18 AWG Shielded Cable 1X2 Core 18 AWG Shielded Cable
MONITORING
1X2 Core 22 AWG Shielded
Master Slave Token Pass Cable
LOCAL CONSULTANT
BAYATY ARCHITECTS
ABU DHABI
Tel + 971 2 6311880- Fax + 971 26311775
P.O Box 75417 Abu Dhabi U.A.E
E-mail: bayaty@emirates.net.ae
PROJECT
DIESEL GENERATOR DOOR AIR CURTAIN WATER FLOW METER ELECTRICAL POWER METER ANANTARA MINA AL ARAB
RAS AL KHAIMAH RESORT
TITLE
BMS LAYOUT
ODOR
FILTER REMOVAL DPS TYPICAL DETAILS-3
PROJECT ID : PLAN ID :
DDC Controller - -
Note: The same BMS point shall be considered if the unit Compartmentalized and as shown on drawings
ECOLOGY AIR PURIFICATION UNIT (EAPU) CAR PARK VENTILATION AND SMOKE MANAGMENT IN CASE OF FIRE MAKE UP FRESH AIR HANDLING UNIT FOR KITCHEN HOOD (FAHU)
NORTH
QIBLA
3.50
2.25
3.381
3.420
3.332
3.619
QIBLA DIRECTION TO BE VERIFIED BY SITE ENGINEER.
LEGEND:-
LEVELS REFERENCE
PV.L PAVEMENT LEVEL S.L
SLAB LEVEL
LS.L LANDSCAPE LEVEL T.O.P TOP OF PARAPET
ST.L STREET LEVEL T.O.C TOP OF COPING
SEQUENCE OF OPERATION F.F.L FLOOR FINISH LEVEL C.L CANOPY LEVEL
T.L. TOP LEVEL W.A.L WALKWAY LEVEL
1) THE FAHU SHALL BE SWITCHED ON LOCALLY THROUGH
THE STARTER CONTROL PANEL OR REMOTELY THROUGH
THE BMS. NOTES:-
SIMULTANEOUSLY A SIGNAL SHALL OPEN THE FRESH AIR 1. This drawing is the copyright of AL-BAYATY
MOTORIZED DAMPER AND THE EXTRACT AIR MOTORIZED ARCHITECTS (ABU DHABI) and must not be retained,
DAMPER copied or used without the above consultant authority.
2. Do not scale from this drawing.
2) WHEN THE ROOM IS OCCUPIED, AND THROUGH THE I&M 3. All dimensions are in millimeters, All dimensions to be
SENSOR THE VENTILATION DAMPERS (GMD) AT THE verified on site & approved by the Engineer.
SUPPLY AIR DUCT AND THE BATH ROOM EXTRACT DUCT 4. This drawing should be read in conjunction with the
WILL BE SWITCHED TO MAXIMUM VENTILATION FLOW, specifications. Other relevant Architectural, Structural,
SIMULTANEOUSLY THE FCU CONTROL WILL BE TURN INTO Mechanical & Electrical drawings & all relevant sections
of the specifications.
MEDIUM SPEED FAN & 22±1°C INDOOR SETTING
TEMPERATURE. THE WALL MOUNTED FCU CONTROL SHALL
INCLUDE TEMPERATURE SENSOR, FAN SPEED CONTROL REV.
FAHU (OFF, LOW, MEDIUM AND HIGH), LED DISPLAY SCREEN,
THE INDOOR SETTING TEMPERATURE SHALL BE
NO.
DESCRIPTION DATE CHECKED APPROVED
BAG FILTER
SENSOR THE VENTILATION DAMPERS (GMD) AT THE
EXTRUCT FAN MD
SUPPLY AIR DUCT AND THE BATH ROOM EXTRACT DUCT
WILL BE SWITCHED TO 30% VENTILATION,
SIMULTANEOUSLY THE FCU CONTROL WILL BE TURN INTO
UV
LIGHT LOW SPEED FAN & 26±1°C INDOOR SETTING
SAND TRAP LOUVER
ELECTRIC HEATER
TEMPERATURE.
COOLING COIL
BAG FILTER
CLEANABLE FILTER
PANEL FILTER
CAV
STARTER/ SUPPLY DUCT (9/10 THE DISTANCE BETWEEN FAHU AND
OPERATOR
CONTROL CT THE FIRST BRANCH SHALL MODULATE THE FAHU
PANEL SUPPLY FAN SPEED (VFD), SIMILARLY THE PRESSURE
SENSOR INSTALLED AT THE FAHU EXTRACT DUCT (9/10
BMS THE DISTANCE BETWEEN FAHU AND THE LAST BRANCH
FIRE ALARM PANEL SHALL MODULATE THE FAHU EXTRACT FAN SPEED (VFD)
6) WHEN THE CO₂ LEVEL INCREASED ABOVE 950 PPM MAIN CONSULTANT
EXTRACT AIR DUCT VIA THE SENSOR, THE FAHU FANS AND ALL THE
BMS BMS BMS VENTILATION MOTORIZED DAMPER AT THE SUPPLY
DDC DDC CT DDC
FIRE ALARM PANEL FIRE ALARM PANEL FIRE ALARM PANEL AND EXHAUST DUCTS WILL BE FULLY OPENED.
CONTROLLER CONTROLLER FCU CONTROLLER
7) THE DUCT TEMPERATURE AND HUMIDITY SENSORS IN
CAV
THE FAHU SUPPLY DUCT SHALL MODULATE THE PIBCV
SD VALVE OF THE FAHU COOLING COIL TO MAINTAIN LOCAL CONSULTANT
GMD GMD
CONSTANT SUPPLY AIR TEMPERATURE OF 21±1.5°C
CO2 FCU
CORRIDOR AND 50%±5RH.
T
BAYATY ARCHITECTS
FD FD ABU DHABI
8) SMOKE DETECTOR INSTALLED IN THE RETURN AIR Tel + 971 2 6311880- Fax + 971 26311775
P DUCT, WHEN TRIGGERED BY SMOKE SHALL SWITCH P.O Box 75417 Abu Dhabi U.A.E
E-mail: bayaty@emirates.net.ae
F F FCU OFF ALL THE FANS SHOWN, CLOSING THE MAIN FRESH
C D C D AIR DAMPER AND THE EXTRACT AIR DAMPER. PROJECT
I&M U I&M U
CT 9) IN A FIRE SITUATION WITHIN THE ZONE, THROUGH A ANANTARA MINA AL ARAB
SIGNAL FROM THE FIRE ALARM PANEL SHALL SWITCH RAS AL KHAIMAH RESORT
CT OFF ALL THE FANS SHOWN, CLOSING THE FRESH AIR
CT CT DAMPER AND THE EXTRACT AIR DAMPER
BATH RM DPS AREA NO. PLOT
10) WHEN THE UNIT IS SWITCHED OFF, ALL THE FAHU FANS
MD
BATH RM 601 5015
GUEST RM I&M GUEST RM I&M ELEC. RM PANTRY EXTRACT FAN AND THERMAL WHEEL SHOWN SHALL BE STOOPED, ALL THE
BAD BAD MOTORIZED DAMPER SHOWN SHALL BE CLOSED AND THE TITLE
GMD GMD TWO WAY CONTROL VALVE SHALL BE CLOSED.
D D BMS LAYOUT
SEQUENCE OF OPERATION-1
VILLAS ROOM FCU CONTROL, VARIABLE REFRIGERANT FLOW UNIT SHALL BE CONTROLED BY THE GRMS (SEE ELECTRIC DESIGN) SUBMISSION DATE : SCALE :
PROJECT ID : PLAN ID :
- -
QIBLA
3.50
2.25
3.381
3.420
3.332
3.619
FAHU
QIBLA DIRECTION TO BE VERIFIED BY SITE ENGINEER.
EXTRACT LOUVER
LEGEND:-
2 SPEED DPS
DPS STARTER LEVELS REFERENCE
M
BAG FILTER
SLAB LEVEL
EXTRUCT FAN MD LS.L LANDSCAPE LEVEL T.O.P TOP OF PARAPET
ST.L STREET LEVEL T.O.C TOP OF COPING
UV
F.F.L FLOOR FINISH LEVEL
SAND TRAP LOUVER LIGHT C.L CANOPY LEVEL
ELECTRIC HEATER
COOLING COIL
BAG FILTER
T.L.
CLEANABLE FILTER
PANEL FILTER
TOP LEVEL W.A.L WALKWAY LEVEL
SUPPLY FAN
SUPPLY FRESH AIR DUCT
NOTES:-
MD T H H T
1. This drawing is the copyright of AL-BAYATY
- ARCHITECTS (ABU DHABI) and must not be retained,
copied or used without the above consultant authority.
DPS H
T H T H T EHC 2. Do not scale from this drawing.
DPS
2 SPEED 3. All dimensions are in millimeters, All dimensions to be
PICBV STARTER
verified on site & approved by the Engineer.
4. This drawing should be read in conjunction with the
STARTER/ specifications. Other relevant Architectural, Structural,
CONTROL Mechanical & Electrical drawings & all relevant sections
PANEL of the specifications.
BMS
FIRE ALARM PANEL REV.
DESCRIPTION DATE CHECKED APPROVED
NO.
CO2
SD
T
P
T
EXTRACT AIR DUCT
F
C SEQUENCE OF OPERATION
U
1) THE FAHU SHALL BE SWITCHED ON LOCALLY THROUGH
THE STARTER CONTROL PANEL OR REMOTELY THROUGH
THE BMS. THE PUBLIC TOILETS EXTRACT FANS ARE 0 FINAL DESIGN 07.06.18
SPACE
SIMILARLY SWITCHED ON.
UPON A SIGNAL THE DDC CONTROLLERS SHALL OPEN THE CLIENT
T AIR MOTORIZED DAMPERS.
SPACE 5) THE ELECTRIC HEATER IN THE FAHU SHALL BE OPERATED MAIN CONSULTANT
WHEN THE OUT DOOR TEMPERATURE DROPS BELOW 21° C,
AND THE AIR LEAVING THE AHU DROPS BELOW 19°C DUE TO
T HUMIDITY CONTROL BY THE COOLING COIL. THE FAHU
SUPPLY AIR TEMPERATURE SHALL CONTROLLED TO BE
21±1°C.
F
C 6) SMOKE DETECTOR INSTALLED IN THE RETURN AIR
U DUCT, WHEN TRIGGERED BY SMOKE SHALL SWITCH
LOCAL CONSULTANT
OFF ALL THE FANS SHOWN, CLOSING THE FRESH AIR
DAMPER AND THE EXTRACT AIR DAMPER.
SPACE 7) IN A FIRE SITUATION WITHIN THE ZONE, THROUGH A BAYATY ARCHITECTS
ABU DHABI
SIGNAL FROM THE FIRE ALARM PANEL SHALL SWITCH Tel + 971 2 6311880- Fax + 971 26311775
T OFF ALL THE FANS SHOWN, CLOSING THE FRESH AIR P.O Box 75417 Abu Dhabi U.A.E
E-mail: bayaty@emirates.net.ae
PUBLIC TOILET DAMPER AND THE EXTRACT AIR DAMPER
8) WHEN THE UNIT IS SWITCHED OFF, ALL THE FAHU FANS PROJECT
F AND THERMAL WHEEL SHOWN SHALL BE STOOPED, ALL THE
C MOTORIZED DAMPER SHOWN SHALL BE CLOSED AND THE
U ANANTARA MINA AL ARAB
TWO WAY CONTROL VALVE SHALL BE CLOSED.
RAS AL KHAIMAH RESORT
DPS
BMS LAYOUT
SEQUENCE OF OPERATION-2
DPS
MD
STARTER/
CONTROL
MECHANICAL P- 502
PANEL
DRAWING NO : REVISION NO:
BMS
FIRE ALARM PANEL
BMS-OV-505 00
PROJECT ID : PLAN ID :
- -
QIBLA
3.50
2.25
3.381
3.420
3.332
3.619
QIBLA DIRECTION TO BE VERIFIED BY SITE ENGINEER.
LEGEND:-
LEVELS REFERENCE
PV.L PAVEMENT LEVEL S.L
SLAB LEVEL
LS.L LANDSCAPE LEVEL T.O.P TOP OF PARAPET
ST.L STREET LEVEL T.O.C TOP OF COPING
F.F.L FLOOR FINISH LEVEL C.L CANOPY LEVEL
T.L. TOP LEVEL W.A.L WALKWAY LEVEL
NOTES:-
REV.
DESCRIPTION DATE CHECKED APPROVED
SEQUENCE OF OPERATION NO.
P
OFF ALL THE FANS SHOWN, CLOSING THE FRESH AIR
DAMPER AND THE EXTRACT AIR DAMPER.
RAK
7) IN A FIRE SITUATION WITHIN THE ZONE, THROUGH A OPERATOR
P
SIGNAL FROM THE FIRE ALARM PANEL SHALL SWITCH
OFF ALL THE FANS SHOWN, CLOSING THE FRESH AIR
DAMPER AND THE EXTRACT AIR DAMPER
8) WHEN THE UNIT IS SWITCHED OFF, THE AHU FAN SHALL BE
STOOPED, ALL THE MOTORIZED DAMPER SHOWN SHALL BE
RETURN AIR CLOSED AND THE TWO WAY CONTROL VALVE SHALL BE
CLOSED.
I&M MAIN CONSULTANT
VAV
H T
SPACE 1
LOCAL CONSULTANT
I&M
VAV
BAYATY ARCHITECTS
ABU DHABI
Tel + 971 2 6311880- Fax + 971 26311775
P.O Box 75417 Abu Dhabi U.A.E
H T E-mail: bayaty@emirates.net.ae
PROJECT
SPACE 2
ANANTARA MINA AL ARAB
RAS AL KHAIMAH RESORT
I&M
VAV
AREA NO. PLOT
601 5015
H T
TITLE
SPACE 3
BMS LAYOUT
SEQUENCE OF OPERATION-3
PUBLIC TOILET
CAV
MECHANICAL P- 502
I&M
DRAWING NO : REVISION NO:
BMS-OV-506 00
- -
QIBLA
3.50
2.25
SEQUENCE OF OPERATION
3.381
3.420
3.332
1) THE INDOOR DUCTED SPLIT UNIT SHALL BE SWITCHED ON
3.619
LOCALLY THROUGH THE WALL MOUNTED DUCTED SPLIT
UNIT AS WELL THE FAN SPEED AND THE SPACE
TEMPERATURE.
2) THE SELECTED INDOOR AIR TEMPERATURE WILL BE QIBLA DIRECTION TO BE VERIFIED BY SITE ENGINEER.
MAINTAINED BY MODULATING THE LINEAR EXPANSION
VALVE LOCATED AT THE INLET REFRIGERANT PIPE TO THE LEGEND:-
INDOOR UNIT . LEVELS REFERENCE
PV.L PAVEMENT LEVEL S.L
3) THE VARIABLE REFRIGERANT FLOW SHALL BE PROVIDED SLAB LEVEL
LS.L
BY VARYING THE SCROLL COMPRESSOR SPEED (VFD) LANDSCAPE LEVEL T.O.P TOP OF PARAPET
Electronic ACCORDING TO THE PRESSURE SENSOR INSTALLED AT ST.L
Receiver STREET LEVEL T.O.C TOP OF COPING
Expansion Valve THE OUTDOOR UNIT SUPPLY REFRIGERANT PIPE SHALL F.F.L FLOOR FINISH LEVEL C.L CANOPY LEVEL
MODULATE THE (VFD), WHEN THE PRESSURE INCREASE
T.L. TOP LEVEL
THE COMPRESSOR SPEED DECREASE AND VICE VERSA. W.A.L WALKWAY LEVEL
Inverter
Scroll
Compressor
Controller
CLIENT
RAK
Linear Linear OPERATOR
Expansion Expansion
Valve Valve
M M
MAIN CONSULTANT
T T T T
INDOOR INDOOR
DUCTED DUCTED
SIPLT SIPLT
UNIT UNIT LOCAL CONSULTANT
T T BAYATY ARCHITECTS
ABU DHABI
Tel + 971 2 6311880- Fax + 971 26311775
P.O Box 75417 Abu Dhabi U.A.E
E-mail: bayaty@emirates.net.ae
PROJECT
TITLE
BMS LAYOUT
SEQUENCE OF OPERATION-4
MECHANICAL P- 502
CT - WALL MOUNTED DUCTED SPLIT UNIT CONTROL UNIT WITH FAN SPEED SELECTION AND TEMPERATURE (SENSOR, DISPLAY AND SETTING). BMS-OV-507 00
PROJECT ID : PLAN ID :
- -
BAG FILTER
QIBLA
2.25
3.381
3.420
3.332
ELEC. HEATING COIL
3.619
WASHABLE FILTER
FRESH AIR
+ T
_
MD
LEVELS REFERENCE
PICBV PV.L PAVEMENT LEVEL S.L
STARTER SLAB LEVEL
LS.L LANDSCAPE LEVEL T.O.P TOP OF PARAPET
ST.L STREET LEVEL T.O.C TOP OF COPING
CONTROL
F.F.L FLOOR FINISH LEVEL
PANEL WITH C.L CANOPY LEVEL
DDC CONTROLLER
T.L. TOP LEVEL W.A.L WALKWAY LEVEL
FIRE ALARM PANEL SAND TRAP LOUVER
BMS
NOTES:-
BMS AHU
FIRE ALARM PANEL
P SEQUENCE OF OPERATION
1) THE AHU AND FAHU SHALL BE SWITCHED ON LOCALLY 0 FINAL DESIGN 07.06.18
THROUGH THE STARTER CONTROL PANEL OR REMOTELY
THROUGH THE BMS. THE ECOLOGY UNIT ARE SIMILARLY
CLIENT
SWITCHED ON. SIMULTANEOUSLY SIGNALS BY THE DDC
CONTROLLERS SHALL OPEN THE AIR MOTORIZED
I&M DAMPERS.
VAV 1
2) THE PRESSURE SENSOR INSTALLED AT THE AHU AND AT
YHR FAHU SUPPLY DUCT (9/10 THE DISTANCE BETWEEN
H T AHU/FAHU AND THE FIRST BRANCH SHALL MODULATE
THE AHU/FAHU FAN SPEED (VFD).
MAIN CONSULTANT
FAN HOT SECTION SWITCHED ON (ECOLOGY UNITS SWITCHED ON) THE
ODOR
BMS
7) SMOKE DETECTOR INSTALLED IN THE RETURN AIR BAYATY ARCHITECTS
DUCT, WHEN TRIGGERED BY SMOKE SHALL SWITCH ABU DHABI
FIRE ALARM PANEL SW KITCHEN HOOD
OFF ALL THE FANS SHOWN, CLOSING THE FRESH AIR Tel + 971 2 6311880- Fax + 971 26311775
P.O Box 75417 Abu Dhabi U.A.E
DAMPER AND THE EXTRACT AIR DAMPER. E-mail: bayaty@emirates.net.ae
9) WHEN THE UNIT IS SWITCHED OFF, ALL THE AHU FANS AND RAS AL KHAIMAH RESORT
FILTER
SW KITCHEN HOOD
MOTORIZED DAMPER SHOWN SHALL BE CLOSED AND THE
TWO WAY CONTROL VALVE SHALL BE CLOSED. AREA NO. PLOT
601 5015
MD
DPS TITLE
DPS
STARTER/
CONTROL STARTER STARTER BMS LAYOUT
PANEL
SEQUENCE OF OPERATION-5
BMS
FIRE ALARM PANEL
MECHANICAL P- 502
BMS-OV-508 00
I&M - INFRA RED AND MOTION SENSOR (FOR ENERGY SAVING) SUBMISSION DATE : SCALE :
SW - HOOD FAN OPERATION SWITCH 100% AND 33% EXTRACT AIR
KMD - TWO POSITION (OPEN / CLOSE) KITCHEN MOTORIZED DAMPER. JUNE 2018 N.T.S
RMD - TWO POSITION (OPEN / CLOSE) RETURN MOTORIZED DAMPER.
PROJECT ID : PLAN ID :
- -
QIBLA
3.50
2.25
STARTER
3.381
3.420
3.332
3.619
6 PRIMARY PUMPS
(5 DUTY + 1 STAND BY)
MV MV MV MV MV MV (MOTORIZED VALVE)
QIBLA DIRECTION TO BE VERIFIED BY SITE ENGINEER.
P1
LEGEND:-
LEVELS REFERENCE
PV.L PAVEMENT LEVEL S.L
SLAB LEVEL
LS.L LANDSCAPE LEVEL T.O.P TOP OF PARAPET
P2 ST.L STREET LEVEL T.O.C TOP OF COPING
F.F.L FLOOR FINISH LEVEL C.L CANOPY LEVEL
T.L. TOP LEVEL W.A.L WALKWAY LEVEL
VARIABLE
NOTES:-
STARTER VFD FREQUENCY
P3 1. This drawing is the copyright of AL-BAYATY
DRIVES ARCHITECTS (ABU DHABI) and must not be retained,
copied or used without the above consultant authority.
2. Do not scale from this drawing.
CHILLER - 5
CHILLER - 4
CHILLER - 3
CHILLER - 2
CHILLER - 1
P4 4. This drawing should be read in conjunction with the
specifications. Other relevant Architectural, Structural,
Mechanical & Electrical drawings & all relevant sections
of the specifications.
REV.
DESCRIPTION DATE CHECKED APPROVED
P5 NO.
SECONDARY PUMPS
P6
FS FS FS FS FS FS
0 FINAL DESIGN 07.06.18
T T T T T T
CLIENT
S3
RAK
OPERATOR
ΔP
MAIN CONSULTANT
LOCAL CONSULTANT
2) THE SECONDARY CHW PUMPS SHALL BE SELECTED THROUGH CONTROL FEED WATER ANANTARA MINA AL ARAB
A SELECTOR SWITCH IN THE MCC OR THROUGH BMS.. PUMPS RAS AL KHAIMAH RESORT
5) WHEN THE LEAD CHILLER IS FULLY LOADED AND UPON A DESCIPLINE. REF. NO.
CALL FOR FURTHER COOLING, THE SECOND CHILLER SHALL MECHANICAL P- 502
BE SIGNALLED TO RUN.
BMS DRAWING NO : REVISION NO:
6) THE PRESSURE SENSOR INSTALLED IN THE CHILLED
WATER PIPEWORK SHALL SIGNAL THE CHW SECONDARY PUMPS BMS-OV-509 00
TO VARY SPEED THROUGH THE VARIABLE FREQUENCY DRIVE.
SUBMISSION DATE : SCALE :
7) CHILLER TRIPPING, ON A REDUCTION IN LOAD, SHALL FOLLOW
THE REVERSE SEQUENCE. JUNE 2018 N.T.S
8) CHILLER AND PRIMARY PUMP SEQUENCING SHALL BE PROJECT ID : PLAN ID :
ACCOMPLISHED BY THE PSC (PROGRAMMABLE SUPERVISORY
CONTROLLER). - -
BAG FILTER
PANEL FILTER
QIBLA
3.50
2.25
3.381
3.420
3.332
3.619
FRESH AIR
+ T
_
MD
LEGEND:-
PICBV LEVELS REFERENCE
STARTER
PV.L PAVEMENT LEVEL S.L
SLAB LEVEL
LS.L LANDSCAPE LEVEL T.O.P TOP OF PARAPET
CONTROL ST.L
PANEL WITH STREET LEVEL T.O.C TOP OF COPING
DDC CONTROLLER F.F.L FLOOR FINISH LEVEL C.L CANOPY LEVEL
FIRE ALARM PANEL T.L. TOP LEVEL W.A.L WALKWAY LEVEL
BMS
NOTES:-
REV.
DESCRIPTION DATE CHECKED APPROVED
SEQUENCE OF OPERATION NO.
MD
UV 2) THE PRESSURE SENSOR INSTALLED AT THE AHU SUPPLY
LIGHT DUCT (9/10 THE DISTANCE BETWEEN AHU AND THE
FIRST BRANCH SHALL MODULATE THE AHU SUPPLY FAN
SPEED (VFD).
SUPPLY AIR 3) THE CO₂ SENSORS ON THE RETURN DUCT SHALL
EXTRACT LOUVER MD - SEND ALARM WHEN THE CO2 LEVEL RISES ABOVE
950 PPM
H T
SPACE
LOCAL CONSULTANT
BAYATY ARCHITECTS
ABU DHABI
H T Tel + 971 2 6311880- Fax + 971 26311775
P.O Box 75417 Abu Dhabi U.A.E
E-mail: bayaty@emirates.net.ae
U
TITLE
STARTER/
CONTROL
PANEL BMS LAYOUT
BMS SEQUENCE OF OPERATION-7
FIRE ALARM PANEL CT
ECOLOGY UNIT
FCU
REMOVAL
FAN
ODOR
MECHANICAL P- 502
SW KITCHEN HOOD
MD
- -
FILTER
FAN KITCHEN
ODOR
SW KITCHEN HOOD
DPS
DPS
STARTER/
STARTER
CONTROL STARTER
PANEL
BMS
FIRE ALARM PANEL
NORTH
QIBLA
3.50
2.25
CO
3.381
3.420
3.332
3.619
PEAF
OUTDOOR
CO
QIBLA DIRECTION TO BE VERIFIED BY SITE ENGINEER.
LEGEND:-
LEVELS REFERENCE
PV.L PAVEMENT LEVEL S.L
SLAB LEVEL
LS.L LANDSCAPE LEVEL T.O.P TOP OF PARAPET
ST.L STREET LEVEL T.O.C TOP OF COPING
F.F.L FLOOR FINISH LEVEL C.L CANOPY LEVEL
T.L. TOP LEVEL W.A.L WALKWAY LEVEL
CO
NOTES:-
REV.
DESCRIPTION DATE CHECKED APPROVED
NO.
CO
CO
PEAF
OUTDOOR
CLIENT
CO
RAK
PEAF
OUTDOOR OPERATOR
CO
MAIN CONSULTANT
CO
LOCAL CONSULTANT
PEAF
OUTDOOR
CO BAYATY ARCHITECTS
ABU DHABI
Tel + 971 2 6311880- Fax + 971 26311775
P.O Box 75417 Abu Dhabi U.A.E
E-mail: bayaty@emirates.net.ae
PROJECT
CO
ANANTARA MINA AL ARAB
RAS AL KHAIMAH RESORT
BMS LAYOUT
SEQUENCE OF OPERATION-8
CO CO sensor
DESCIPLINE. REF. NO.
SEQUENCE OF OPERATION
MECHANICAL P- 502
1. UNDER NORMAL CONDITIONS THE BMAF FANS AND THE PEAF FANS
SHALL BE OPERATED TO PROVIDE 2 AIR CHANGE PER HR WHEN THE CO
PEAF PARKING EXTRACT AIR FAN DRAWING NO : REVISION NO:
CONCENTRATION RISE ABOVE 100mg/M3 IN THE BASEMENT THE PEAF
VFD VARIABLE FREQUENCY DRIVE FANS SHALL OPERATED TO PROVIDE 6 AIR CHANGE PER HR, AND IN
CASE THE CO CONCENTRATION RISES THEN THE FANS SHALL BE BMS-OV-511 00
OPERATED AT FULL SPEED (9 AIR CHANGE / HR), WHEN THE CO
CONCENTRATION DROPS BELOW 95mg/M3 THE FANS SHALL BE BACK TO SUBMISSION DATE : SCALE :
PROVIDE 3 AIR CHANGE PER HR.
2. IN A FIRE SITUATION PEAF FANS SHALL BE RUN AT FULL SPEED TO JUNE 2018 N.T.S
PROVIDE 9 AIR CHANGE PER HR THROUGH A SIGNAL FROM THE FIRE
ALARM PANEL, PROJECT ID : PLAN ID :
3. ALL CONTROLS AND RUN THE PEAF FANS SHALL BE POSSIBLE TO
OVERRIDE THROUGH THE FIREMAN CONTROL PANEL, AS WELL AS IT - -
SHALL BE POSSIBLE TO MANUALLY SWITCH OFF THE FAN THROUGH THE
FIREMAN CONTROL PANEL
4. THE FAN ,SENSORS AND CONTROL SHALL BE CONNECTED TO THE FOR MUNICIPALITY APPROVAL
EMERGENCY GENERATOR
QIBLA
3.50
2.25
3.381
3.420
3.332
3.619
STAIRWELL/ LIFTWELL
PRESSURIZATION FAN WITH VFD CORRIDOR EXTRACT FAN
STARTER/CONTROL PANEL QIBLA DIRECTION TO BE VERIFIED BY SITE ENGINEER.
MD
FIRE MAN'S SMOKE CONTROL PANEL LEGEND:-
FIRE ALARM SYSTEM
SD BMS LEVELS REFERENCE
PV.L PAVEMENT LEVEL
ROOF S.L
SLAB LEVEL
LS.L LANDSCAPE LEVEL T.O.P TOP OF PARAPET
SEQUENCE OF OPERATION SEQUENCE OF OPERATION M.D ST.L STREET LEVEL T.O.C TOP OF COPING
CORRIDOR
F.F.L FLOOR FINISH LEVEL
SMOKE EXTRACT C.L CANOPY LEVEL
1) UNDER NORMAL CONDITIONS THE PRESSURIZATION FAN SHALL NOT 1. UNDER NORMAL CONDITIONS THE CORRIDOR EXTRACT FAN SHALL NOT
FAN T.L. TOP LEVEL W.A.L
RUN AND THE DAMPERS ON THE AIR INTAKE AND BYBASS (RELIEF) DUCTS RUN AND THE MOTORIZED DAMPERS ON THE AIR OUTLETS DUCT, THE WALKWAY LEVEL
......
SMOKE DETECTOR NOTE : FANS SHALL CONECTRD TO DIESEL GENERATOR
SD GROUND FLOOR
P PRESSURE SENSOR
0 FINAL DESIGN 07.06.18
MBD MOTORIZED BYPASS DAMPER MSD - MOTORIZED SMOKE DAMPER
CLIENT
MD - MOTORIZED DAMPER
RAK
OPERATOR
MAIN CONSULTANT
MECHANICAL P- 502
4. THE FAN AND CONTROL SHALL BE CONNECTED TO THE EMERGENCY
GENERATOR DRAWING NO : REVISION NO:
MSD
BMS-OV-512 00
PROJECT ID : PLAN ID :
......
NOTE : FANS SHALL CONECTRD TO DIESEL GENERATOR
- -
GROUND FLOOR
MD - MOTORIZED DAMPER
CORRIDOR PRESSURIZATION
NORTH
QIBLA
3.50
2.25
3.381
3.420
3.332
3.619
QIBLA DIRECTION TO BE VERIFIED BY SITE ENGINEER.
LEGEND:-
LEVELS REFERENCE
PV.L PAVEMENT LEVEL S.L
SLAB LEVEL
LS.L LANDSCAPE LEVEL T.O.P TOP OF PARAPET
ST.L STREET LEVEL T.O.C TOP OF COPING
F.F.L FLOOR FINISH LEVEL C.L CANOPY LEVEL
T.L. TOP LEVEL W.A.L WALKWAY LEVEL
NOTES:-
and Monitor
REV.
DESCRIPTION DATE CHECKED APPROVED
NO.
Fresh Air DDC Control
Handling Unit (FAHU) and Monitor DDC Control FANSV EXCLUDING
and Monitor VILLAS
Flow Heater Heater Flow Flow Flow Meter and Monitor BOOSTER
Meters Meters Meters Meters Meters Integrator
LOCAL CONSULTANT
CCTV & Access Lighting Control Fire Fighting Systems Chiller Management S. Fire Alarm Global BAYATY ARCHITECTS
ABU DHABI
Software Interface Interface Monitoring Only Monitoring Only Software Interface Controller Tel + 971 2 6311880- Fax + 971 26311775
P.O Box 75417 Abu Dhabi U.A.E
E-mail: bayaty@emirates.net.ae
PROJECT
TITLE
BMS LAYOUT
SCHEMATIC DIAGRAM
BMS Station
Main Server
DESCIPLINE. REF. NO.
MECHANICAL P- 502
BMS-OV-513 00
PROJECT ID : PLAN ID :
- -