Design of Open Drain

Reference Calculation Output

Determine design flows for the drain

i = lT K
(d+ q ) h

ARI, T Storm Derrived Parameters


Location Duration,
(Years) λ K θ ƞ
d (min)

Hulu Lepar 20 30 56 0.21 0.169 0.651

i = lT K = 136.955 mm/h
(d+ q ) h

Q = C.I.A
360

C = 0.90 I = 136.95 mm/h A = 10.30 ha

Q20 = 3.53 m3/s

Calculate size of lined drain section

Manning's n for concrete lining = 0.015

Assuming:
Drain longitudinal slope = 0.5 %
Width, B = 1.50 m
Side Slope, Z = 0

Q = vxA

where: v = 1/n x S o 1/2 x R 2/3 ;


A = (B + ZD)D = 1D
P = B + 2D(1 + Z 2 ) 1/2 = 1.0 + 2D

D A P R v Q
(m) (m 2 ) (m) (m) m/s (m 3 /s)
0.70 1.05 2.90 0.36 2.39 2.51
0.80 1.20 3.10 0.39 2.50 3.00
0.90 1.35 3.30 0.41 2.60 3.51
0.92 1.38 3.34 0.41 2.62 3.61 > Q20

Allowing a minimum freeboard based on required depth of = 1.40 m

Minimum required freeboard for open drain, 30% of required depth

= 0.48 m
Design of Open Drain
Reference Calculation Output

Provided dimension of lined drain (Refer to precast concrete manufacturers):

Width, B = 1.5 m
Depth, D = 1.05 m
Velocity, v = 2.72 m/s
Discharge, Q = 4.28 m3/s

D A P R v Q
(m) (m 2 ) (m) (m) m/s (m 3 /s)
1.05 1.58 3.60 0.44 2.72 4.28

The drain dimensions are 1.5 m wide x 1.05 m deep, which is within the recommended
limits.

Check flow velocity for open drain = 2.72 m/s < 4.00 m/s OK

Velocity of more than 2 m/s, safety railings will be provided along the drain.

Service opening shall be provided along open drain with maximum interval
spacing at every 100m

0.75m 1.05m