Drafty summary of BOQ House


Amount
1. EXCAVATION & EARTH WORK( qaaxida dhulka)
2. CONCRETE WORK( sibidhka iyo niista)
3. MASONRY WORK(dhismaha dhagaxa)
Ega sheet wall ( jiingada gidaarka)
4. ROOFING(jiingada sare)
5. CARPENTRY AND JOINERY(qoryaha)
6. METAL WORKS( albaabada iyo daaqadaha)
8. FINISHING( dhaystirka)
9. PAINTING(rinjiga)
10. ELECTRICAL INSTALLATION WORKS( laydh xidhka)
Sub-structure( waxda hoose ee dhismaha) 302,462.30
Sup-structure(waxda hoose ee dhismaha) 569,186.50
Total A+B 871,648.80
Vat 15% 130,747.319
GRAND TOTAL 1,002,396.115
BILL QAUNTITY OF HOUSES
Item no Description Unit

A-SUB STRUCTURE( waaxda hoose ee dhiska)

1. EXCAVATION & EARTH WORK( qaaxida dhulka)


Clear and remove top soil to an average depth of 200mm(xaaqida carada
sare ilaa 200mm)
1.01 M2
Excavation for trench in ordinary soil to a depth not exceeding 850mm
1.03 from reduced ground level( jeexida dhulka oo kuxidhan designka) M3
1.04 Fill around masonary wall with imported selected material (caro buuxin) M3
Fill under hard core with imported selected material from quarry waste
well rolled and compacted in layers not exceeding 200 mm thick( sagxad
buuxin dhagaxaan lajajbiyey)
1.05 M3
250mm thick basaltic stone hardcore well rolled, consolidated and
blinded with crushed stone( dhagax way oo seeska jiingada lagu
habeeyey)
1.06 M2
Load and cart away surplus excavated material to an appropriate
1.07 tip(qarada qashinka oo lasootuuro) M3
TOTAL CARRIED TO SUMMARY ...................................................

2. CONCRETE WORK( sibidhka iyo niista)


50 mm lean concrete quality C-5, with minimum cement content of 150
2.01 kg /m3, of concrete;

a) floor on lean concrete M2


b) stone masonary M2

Reinforced concrete quality C-25,360 kg of cement/m3 filled in to form


work and vibrated around rod reinforcement.(Formwork and
reinforcement measured separately)
2.02

b) In 100mm thick Ground floor slab. M2


TOTAL CARRIED TO SUMMARY ...................................................

3. MASONRY WORK( dhagaxa waa waawayn)

400mm thick hard trachytic roughly dressed stone masonry foundation


3.01 wall below ground level bedded in cement mortar mix ratio (1:3). M3

TOTAL CARRIED TO SUMMARY ...................................................


B-SUPER STRUCTURE( waaxda hoose ee dhiska)
Ega sheet wall ( jiingada gidaarka) pcs
CARPENTRY AND JOINERY wall(qoryaha gidaarada) ml
TOTAL CARRIED TO SUMMARY ...................................................
4. ROOFING( jiingada)
decra roof (ETHIOPIAN TYPE) cover to 5x7cm zigba purloins at c/c 90cm
and eucalyptus trusses members. Construction shall be according to
drawing. Unit price shall include roof ridge cover and two coats of wood
preservative paint to all zigba purlin and truss members.
4.01 M2
Supplay and fix down pipe in PVC Φ10cm diamterte with fixing brackets
4.02 in 3x40mm flat iron at 100cm c/c Ml
4.03 Ceiling on sides and upper( bilifoonka) ml
price shall include three coat of approved oil print and bolts and nuts
4.04 requires as per desing
TOTAL CARRIED TO SUMMARY ...................................................

5. CARPENTRY AND JOINERY( qoryaha iyo baxarasaafka)

Supply and fix 8 mm thick chip wood ceiling on and including 40 x 50


mm structural wood battens placed c/c 600 mm both ways suspended to
euclaptus truss lower member. Price includes 40x40mm decorated hard
wood corner list and all other necessary accessories
5.01 M2
To Fabricate mount wooden truss according to the structural drawing.
Price shall include two coats of anti-termite treatment and all other
necessary accessories. The connection joints shall be approved by the
responsible engineer.
5.02

5.2.1 Eucalyptus wood Lower,Upper members. Dia.120mm. Ml


5.2.2 Eucalyptus woodvertical & diagonal members. Dia.100mm. Ml
Sawn structural local wood roof purlins 50x70mm placed at c/c 900mm. Ml

TOTAL CARRIED TO SUMMARY ...................................................

6. METAL WORKS( dhisma albaabada iyo daqadaha))


+
6.01
Window
a) Type W1 = size: 100x1800mm Pcs
b) Type W2 = size: 100x160mm (ventile for toilet) Pcs

6.02 Door
a) Type D1 = size: 90x270mm Pcs
b) Type D2 = size: 100x270mm main entrance Pcs
C) Type D3= size: 100x270mm internal doors Pcs
D) Type D4= size: 100x2700mm (Door window type) Pcs
TOTAL CARRIED TO SUMMARY ...................................................
7.01
7.PLASTERING AND POINTING
Apply three coats of plastering in cement mortar (1:3). Price shall
include pre-cleaning and preparation of the surface.

a) To all internal wall surface pointing M2


b) To all External wall Surface pointing M2

TOTAL CARRIED TO SUMMARY ...................................................

8.01 8. FINISHING ( dhamaystirka dhismaha)


8.02 ALL finishing work shuold be refered in BOQ , rather than design
CEMENT SCREED to floor ,staircase and landing bedded on and including
30mm thick cement sand (1:3) mortar.

8.03 - To floor cement scered M2


8.04 - QAURTZ M2
8.05 Dressed stone at the front of the main building M2
100mm high non slipery Ceramic skirting stuck to wall with approved
8.06 type of adhesive. M2
Marble floor and stair finishing cut to appropriate size, weathered and
8.07 mounted on and including 30mm thick cement mortar (1:3) bedding. M2
10mm thick imported type approved quality non slipery ceramic tile
flooring for toilet stuck down with approved type adhesive on cement
sand screed floor finish and joints grouted in appropriate color setting
coat mortar. Color and pattern of tile shall be approved by the Engineers.
8.08 M2
apply gypsum plastering to interal walls,price shall include prepartion of
8.09 surface M2
500x500x50mm thick coloured terrazzo floor tile around the building
open jointed on and including 400mm selected material compacted fill
and 100mm thick red ash or equivalent bedding material.
8.1 M2
TOTAL CARRIED TO SUMMARY ...................................................

9.01 9. PAINTING( rinjiga)


Apply two coats of approved quality plastic paint.Price shall include pre-
cleaning and preparation of surfaces.

a) To all internal wall surface. M2


b) To all External Wall Surface M2
c) To CHIPwood ceilling M2
TOTAL CARRIED TO SUMMARY ...................................................
10.1 10.GLAZING
4mm thick clear glass glazed with beads and approved quality M2
puty .price shall include all accessories

TOTAL CARRIED TO SUMMARY ...................................................

12.1 12. ELECTRICAL INSTALLATION WORKS( laydh galinta)


12.2 single way single switch, NO
12.3 two way switch, NO
double way double switch, NO
12.4 SOCKET OUTLET POINTS
10-16A/1P socket outlet points fed through PVC insulated conductors
of 3x2.5 mm² inside PVC conduits of 16mm diameter including junction
boxes with covers,and insulating screw cap connectors all for flush
mounting .
12.5 NO
20A/1P socket outlet points fed through PVC insulated conductors of
3x4 mm² inside PVC conduits of 32mm diameter including junction boxes
with covers,and insulating screw cap connectors all for flush mounting .
NO
12.6
Only conduits of 19mm diameter including junction boxes with covers
12.7 etc. as per ETC NO
Roof condicuit of 3x2.5mm²bare copper tabe including fixing brackets
12.8 and all accessories. NO
1x35mm² bare copper down conducter insed PVC condit of 2.5mm²
. diameter bonded to roof tabe inculding fixing accessaries. NO
12.9
celling light NO
Living room light and fixtures no
TOTAL CARRIED TO SUMMARY ...................................................
TOTAL A(SUB- STRUCTURE)
TOTAL B(SUPER - STRUCTURE)
TOTAL A+B
Vatb15%
Grand TOTAL
ES
QTY Rate Amount

500.00 233.00 116,500.00

-
33.52 123.00 4,122.47

78.95 12.00 947.34

157.89 12.00 1,894.68

(33.52) 12.00 (402.19)


123,062.30
-
-
-
-
500.00 350.00 175,000.00 ###
-
-
-

-
-
- -
175,000.00

20.00 220.00 4,400.00

4,400.00

200.00 180.00 36,000.00


150.00 130.00 19,500.00
55,500.00
-

219.84 512.00 112,558.08

42.00 312.00 13,104.00


20.00 700.00 14,000.00

-
- 139,662.08
-
-
-
-

219.84 523.00 114,976.32


-
-
150.00 213.50 32,025.00
23.00 -
85.13 230.00 19,580.59

- 166,581.91
-
-
-
-
-
4.00 5,000.00 20,000.00
2.00 5,000.00 10,000.00

-
-
-
2.00 1,500.00 3,000.00
1.00 1,500.00 1,500.00
1.00 1,500.00
1.00 1,500.00 1,500.00
- 36,000.00
-
-

-
-
12.00 -
12.00 -
-
-
- 72,000.00
-
-
-

-
-
321.96 100.00 32,196.00
73.92 220.00 16,262.40
9.00 223.00 25,339.47
30.00 - -

137.10 -

480.00 -

- - -

321.96 -
- 73,797.87
-
-

-
-
- 100.00 -
- 100.00 -
219.84 123.00 27,040.32
230.00 27,040.32
100.00
24.48 100.00 2,448.00
-
-
- 56,528.64
-

18.00 23.00 414.00


3.00 34.00 102.00
2.00 45.00 90.00

7.00 225.00 1,575.00

3.00 223.00 669.00


67.00

3.00 167.00 501.00

3.00 99.00 297.00


5.00 90.00 450.00

16.00 63.00 1,008.00


1.00 10.00 10.00
5,116.00
302,462.30
569,186.50
871,648.80
130,747.32
1,002,396.12