Testing and Adjusting


320D and 323D Excavators Hydraulic System
Media Number -RENR7295-16 Publication Date -01/12/2013 Date Updated -04/12/2013

i04629995

Relief Valve (Main) - Test and Adjust - Heavy Lift


SMCS - 5069-025; 5069-081

S/N - A6F1-UP

S/N - A9F1-UP

S/N - BYM1-UP

S/N - CWG1-UP

S/N - CXY1-UP

S/N - CYD1-UP

S/N - DHK1-UP

S/N - DKW1-UP

S/N - FAL1-UP

S/N - GTF1-UP

S/N - JLG1-UP

S/N - JZA1-UP

S/N - KGF1-UP

S/N - KLM1-UP

S/N - KZF1-UP

S/N - LFL1-UP

S/N - MCH1-UP

S/N - MZD1-UP

S/N - NDE1-UP

S/N - NES1-UP

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearc... 04/02/2024
323D & 323D L Excavator SDC00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP4377 -... Página 2 de 7

S/N - NZF1-UP

S/N - PBE1-UP

S/N - PBM1-UP

S/N - PHX1-UP

S/N - RAC1-UP

S/N - SDC1-UP

S/N - SED1-UP

S/N - SPN1-UP

S/N - TDH1-UP

S/N - WGC1-UP

S/N - WNE1-UP

S/N - YSD1-UP

S/N - ZMF1-UP

Specification
Table 1
"Relief Valve (Main) - Test and Adjust (Heavy Lift)"
Date Machine Serial Number
Engine Speed
Machine Settings Speed Dial "10"
AEC switch OFF
Item Specification Actual
Standard 35000 + 500 - 1000 kPa (5076 + 73 - 145 psi)
Main Relief
Heavy Lift
36000 + 500 - 1000 kPa (5221 + 73 - 145 psi)

Required Tools

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearc... 04/02/2024
323D & 323D L Excavator SDC00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP4377 -... Página 3 de 7

Illustration 1 g02571852

Tooling (A) 198-4240 Digital Pressure Indicator Gp

Table 2
Tool Item Qty Part Number Description
A 198-4240 Digital Pressure Indicator Gp
A1 1 198-4234 Indicator
Pressure Sensor
A2 1 198-4239
41,368 kPa (6,000 psi)
A3 1 198-4236 Extension Cable

Machine Preparation
1. Position the machine on level ground and stop the engine.

2. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "Hydraulic System Pressure -
Release".

Illustration 2 g01217778

Pump compartment

(1) Pressure tap (delivery pressure for drive pump)

(2) Pressure tap (delivery pressure for idler pump)

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearc... 04/02/2024
323D & 323D L Excavator SDC00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP4377 -... Página 4 de 7

(3) Pressure tap (power shift pressure)

3. Attach a 41,368 kPa (6,000 psi) pressure sensor to pressure tap (1) .

Test Procedure
1. Start the engine.

2. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF. Refer to
Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for engine rpm settings.

Illustration 3 g01201390

Switch panel

(9) Heavy lift switch

3. Set heavy lift switch (9) to the ON setting. Make sure that the indicator light is on.

4. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

5. Raise the boom until the boom cylinder rods are at full extension.

6. Check the pressure setting of the heavy lift at pressure tap (1) .

7. Return the joystick for the boom to the NEUTRAL position.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearc... 04/02/2024
323D & 323D L Excavator SDC00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP4377 -... Página 5 de 7

Illustration 4 g01186845

(4) Main relief valve

(5) Locknut for the heavy lift

(6) Adjustment screw for the heavy lift

(7) Locknut for the main relief valve

(8) Adjustment screw for the main relief valve

Note: When the main relief setting is adjusted, the heavy lift setting is not affected. When adjustment screw
(8) is turned counterclockwise in order to decrease the main relief setting the pressure difference between the
main relief setting and heavy lift setting will increase. When adjustment screw (8) is turned clockwise in
order to increase the main relief setting the pressure difference between the main relief setting and heavy lift
setting will decrease.

Note: When the heavy lift setting is increased, the main relief setting is also increased. When the heavy lift
setting is decreased, the main relief setting is also decreased.

8. The relief valve pressure setting for heavy lift should be 36000 + 500 - 1000 kPa (5221 + 73 - 145 psi). If
the relief valve pressure setting for heavy lift is not within the specification, adjust the relief valve pressure
setting for heavy lift.

a. Loosen locknut (5) in order to adjust the relief valve for the heavy lift. Adjust the pressure by turning
adjustment screw for the heavy lift (6) until the pressure gauge reading at pressure tap (1) is 36000 +
500 - 1000 kPa (5221 + 73 - 145 psi).

Note: Turning adjustment screw (6) clockwise increases the pressure. Turning adjustment screw (6)
counterclockwise decreases the pressure.

Note: Always make final pressure adjustments on pressure rise.

b. Tighten locknut (5) to a torque of 70 ± 10 N·m (50 ± 7 lb ft).

Note: Confirm the heavy lift pressure by raising the boom until the boom cylinder rods are at full
extension.

9. Set heavy lift switch (9) to the OFF setting. The indicator light should not be illuminated.

10. Open the bucket until the bucket cylinder rod is at full retraction.

11. Check the main relief valve pressure setting at pressure tap (1) .

12. Return the joystick for the bucket to the NEUTRAL position.

13. The main relief valve pressure setting should be 35000 + 500 - 1000 kPa (5076 + 73 - 145 psi). If the main
relief valve pressure setting is not within the specification, adjust the main relief valve pressure setting.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearc... 04/02/2024
323D & 323D L Excavator SDC00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP4377 -... Página 6 de 7
Note: During adjustment of screw (8) , do not allow screw (6) to move.

14. In order to adjust the main relief valve, loosen locknut (7) and turn adjustment screw (8) until the pressure
gauge reading at pressure tap (1) is 35000 + 500 - 1000 kPa (5076 + 73 - 145 psi).

Note: Turning adjustment screw (8) clockwise increases the pressure. Turning adjustment screw (8)
counterclockwise decreases the pressure.

Note: Always make final pressure adjustments on pressure rise.

15. Tighten locknut (7) to a torque of 50 ± 10 N·m (37 ± 7 lb ft).

Note: If the pilot line for heavy lift prevents proper adjustment of the relief valve settings, the line can be removed
in order to make the adjustments. The machine will need to be off and the hydraulic system pressure will need to
be released in order to remove the pilot line for heavy lift. Make adjustments to the relief valves and reconnect the
pilot line before starting the machine and checking the pressure settings.

Temporary Setting of the Main Relief Valve


Note: In order to adjust line relief valve pressure settings, the main relief valve must be temporarily adjusted to a
higher setting since the line relief valve pressure settings are higher than the main relief valve pressure setting.

Illustration 5 g01201390

Switch Panel

(9) Heavy lift switch

1. Set the heavy lift switch (9) to the ON setting. Make sure that the indicator light is ON.

2. The main relief valve pressure setting should be 36000 + 500 - 1000 kPa (5221 + 73 - 145 psi) when the
heavy lift mode is on. If the main relief valve is not within the specification, adjust the main relief valve
pressure setting to the correct pressure specification before performing Step 3. Refer to Testing and
Adjusting, "Relief Valve (Main) - Test and Adjust (Heavy Lift)".

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearc... 04/02/2024
323D & 323D L Excavator SDC00001-UP (MACHINE) POWERED BY 3066 Engine(SEBP4377 -... Página 7 de 7

Illustration 6 g01200818

(4) Main relief valve

(5) Locknut for the heavy lift

(6) Adjustment screw for the heavy lift

(7) Locknut for the main relief valve

(8) Adjustment screw for the main relief valve

3. Loosen locknut (5) .

4. Turn screw (6) clockwise by one half turn. Tighten locknut (5) while screw (6) is secured.

5. Perform the desired steps for Testing and Adjusting the line relief valves.

6. Reset main relief valve pressure setting to the normal operating condition. Refer to Testing and Adjusting,
"Relief Valve (Main) - Test and Adjust (Heavy Lift)".

Copyright 1993 - 2024 Caterpillar Inc. Sun Feb 4 10:09:23 UTC-0400 2024
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearc... 04/02/2024

You might also like