PANEL LC01 - INCOMER

FEEDER PROTECTION RELAY


GE 750

SIGMA POWER SERVICES PTY LTD


www.sigmapowerservices.com.au
info@sigmapowerservices.com.au
T: +61 89 2777 228 | M: +61 428 666 274
PROTECTION RELAY Page 1 of 5

TEST REPORT

Customer Rio-Tinto Job No. SPS-851062

Location Marandoo Work Order 110577685

Substation Primary Crushing Substation Date 09/04/2024

Switchboard 6.6kV Load Centre Panel LC01- INCOMER

1. DETAILS

GENERAL CHARACTERISTICS
Relay Manufacturer General Electric Rated Aux. Voltage -

Relay Type GE750 CT Ratio 500:1A

Serial No. B2721749 VT Ratio 60:1

Model No. 750-P1-G1-S1-LO-A20-R-T Ground CT Ratio 200:1

Setting Group 1 Software Version 011

2. PROTECTION SETTINGS

CURRENT PROTECTION SETTINGS


I> I>TMS I>CURVE I>> I>>Delay I>>> I>>> Delay
Element
Setting Setting Setting Setting Setting Setting Setting
Phase 1 0.3 IEC Curve C 12 0 - -
Overcurrent 4.60 0.5 DT - - - -
Neutral OC - - - - - - -
Sensitive
0.1 0.5 IEC Curve A - - - -
Overcurrent
VOLTAGE & FREQUENCY PROTECTION SETTINGS
Element Pickup Tripping Curve Time Delay Output Relay
Undervoltage 27 0.75 DT 2 Output 5
Overvoltage 59 - - - -
Underfrequency - - - -
CIRCUIT BREAKER FAILUE PROTECTION SETTINGS
Breaker Status/ Binary
Element Pickup Time Delay Output Relay
Input
CBF 0.1 - 0 Sec Output 3

Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad


PROTECTION RELAY Page 2 of 5

TEST REPORT

3. METERING

PHASE CURRENT METERING


Injected Current (A) Expected Current (A) Displayed Prim. Current on Relay (A) Remarks
R W B G R W B G R W B G
0.25 0.5 1 - 50 50 50 - 50 50 50 - Pass

SENSITIVE GROUND CURRENT METERING


Injected Current N (A) Expected Current N (A) Displayed Prim. Current on Relay (A) Remarks
0.1 20 19.8 Pass

VOLTAGE METERING
Injected Voltage (V) Expected Voltage (kV) Displayed Prim. Voltage on Relay (kV) Remarks

R-N W-N B-N R W B R W B

63.5 63.5 63.5 6.6 6.6 6.6 6.58 6.58 6.58 Pass

4. PROTECTION TEST RESULTS


PHASE OVERCURRENT PICK UP TEST
CALCULATED PICK UP (A) MEASURED PICK UP (A) TOLERANCE
ELEMENT
L1, L2, L3 L1 L2 L3

1 1.04 1.05 1.04


I>
Pick Up: Based on Input Current (I2 is
4.60 4.611 4.610 4.610
3x input error)
I>> 12 12.10 12.20 12.10

I>>> - - - -

PHASE OVERCURRENT TIMING TEST


CURRENT INJECTED (A) MEASURED TRIP TIMES (s) Calculated TOLERANCE
ELEMENT Trip Times
L1, L2, L3 L1-L2 L2-L3 L3-L1 (s)
Timing: ±3% of trip
2 8.037 8.044 8.037 8.000
time or 40ms
(@1.03xPU)
PTOC1 I> 3 3.016 3.045 3.045 3.000

4 1.632 1.628 1.628 1.600

6.9 45.90 ms 45.98 ms 45.99 ms 50 ms

PTOC2 I> 9.2 60.90 ms 60.98 ms 60.10 ms 50 ms


Timing: ±3% of trip
13.8 23.20 ms 23.98 ms 23.29 ms 50 ms time or 40ms
(@1.03xPU)
I>> 14 0.073 0.071 0.065 0 sec

I>>> - - - - -

Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad


PROTECTION RELAY Page 3 of 5

TEST REPORT

SENSITIVE GROUND OVERCURRENT PICK UP TEST


ELEMENT CALCULATED PICK UP (A) MEASURED PICK UP (A) TOLERANCE

IN> 0.350 0.360 Pick Up: Based on Input Current (I2


IN>> - - is 3x input error)

SENSITIVE GROUND OVERCURRENT TIMING TEST


Calculated TOLERANCE
ELEMENT CURRENT INJECTED (A) MEASURED TRIP TIMES (s) Trip Times
Timing: ±3% of trip
(s)
time or 40ms
IN> 1 1.475 1.485 (@1.03xPU)
Timing: ±3% of trip
IN>> - - - time or 40ms
(@1.03xPU)

GROUND OVERCURRENT PICK UP TEST


ELEMENT CALCULATED PICK UP (A) MEASURED PICK UP (A) TOLERANCE

IG> - - Pick Up: Based on Input Current (I2


IG>> 0.1 0.11 is 3x input error)

GROUND OVERCURRENT TIMING TEST


Calculated TOLERANCE
ELEMENT CURRENT INJECTED (A) MEASURED TRIP TIMES (s) Trip Times
Timing: ±3% of trip
(s)
time or 40ms
2x = - - (@1.03xPU)
IG> 4x = - -
6x = - -
Timing: ±3% of trip
IG>> 0.225 0.102 0.10 time or 40ms
(@1.03xPU)

VOLTAGE / FREQUENCY PROTECTIONS


ELEMENTS PICKUP (V , F) TRIP TIME (s) TRIP OUTPUT Tolerance

Undervoltage 27 31.72 2 5
Pick Up: Per Voltage Input
Timing: ±100ms
Expected Result 31.00 3 5

Overvoltage 59 - - -
Pick Up: Per Voltage Input
Timing: ±100ms
Expected Result - - -

Underfrequency - - -
Pick Up: Per Voltage Input
Timing: ±30ms
Expected Result - - -

Overfrequency - - -
Pick Up: Per Voltage Input
Timing: ±30ms
Expected Result - - -

Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad


PROTECTION RELAY Page 4 of 5

TEST REPORT

5. FINAL CHECKS

FINAL CHECKS
Relay Settings Compared to as found settings ☒ CT Links Closed ☒
Relay Settings read back ☒ CT Shorts removed ☒
All test equipment removed ☒ VT Supply restored ☒
As tested stickers applied to relay ☒ All Trip links closed ☒
Reset all flags/latches ☒ All Wiring and Contacts in good condition ☒

6. COMMENTS

Observations & Comments


1 All the test results are satisfactory, and the protection relay is in serviceable condition.

7. TEST EQUIPMENT
Test Equipment Used
Equipment Description Serial Number Calibration Due-Date
Omicron CMC356 Relay Test Set HN022W / 102411375 11/12/2024

8. VISUAL INSPECTION

Visual Photos

Front View of Relay Panel Name

Tested by: Yuvaraj Parasuraman Reviewed By: Dawood Sajjad

You might also like