Summary of Subgrade After Excavation Material Test Result and Approval Record Sheet

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 13

Alemayehu Ketema General

Gondwana Engineering plc


Contractor

ETHIOPIAN ROADS AUTHORITY

EDO -SEROFTA-WERKA ROAD PROJECT (Km 0+000 ~ 73+245.92)


Summary of Subgrade after excavation Material Test Result and Approval Record Sheet

Representing Section: 50+350 - 50+500fw Visual Descrip.: Dark to brown clay soil

Sampling Station: 50+380,50+420,50+480 Sampling Date: 22-Jan-21

Source: Subgrade Submitted Date: 31-Jan-21

Depth (M) 0.6 Lab.# 580

No Test Performed Applicable Standard Acceptance Criteia Test Results Accepted

1 Sieve Analysis AASHTO T27 N/A A-2-7(1) Yes No

2 Liquid Limit AASHTO T89 < 60% 54 Yes No

3 Plasticity Index AASHTO T90 < 30% 15.1 Yes No

4 MDD (g/cm3 1.495

AASHTO T180 N/A N/A

4.1 OMC(%) 24.0

5 CBR Soaked 95% MDD > 3% 17.0 Yes No

AASHTO T193

5.1 Swell (%) < 3% 0.3 Yes No

Insitu moisture content Plus or Minus 2% from 49 Yes No


6 AASHTO T265
(NMC) OMC

For Contractor
Verified & Submitted by : Sign : Date:
31-Jan-21

Remarks (Consultant Material Engineer) :

Checked by Material .Eng.


RE Initial Date
A A A

( ( (
A A A

+ + +

B B B
) ) )
- - -
C C C
Alemayehu Ketema General
Gondwana Engineering plc
Contractor
Ethiopian Roads Auyhority

EDO -SEROFTA-WERKA ROAD PROJECT (Km 0+000 ~ 73+245.92)

MOISTURE DENSITY RELATIONSHIP OF SOIL (TEST METHOD: AASHTO T-180 METHOD D)

Representing Section 50+350 - 50+500fw Visual Descrip. Dark to brown clay soil

Sampling Station 50+380,50+420,50+480 Sampling Date 22-Jan-21


Material Type Subgrade Testing Date 24-Jan-21
Depth (m) 0.6 Lab # 580

TRIAL NUMBER 1 2 3 4
Water % 600 800 1000 1200
WEIGHT OF SOIL + MOLD (g) W1 8,600 8,860 8,980 8,960
DENSITY

WEIGHT OF MOLD (g) W2 4995 4995 4995 4995

VOLUME OF MOLD (Cm ) 3


V 2123 2123 2123 2123
WEIGHT OF WET SOIL (g) W3 = W1-W2 3,605 3,865 3,985 3,965
WET DENSITY OF SOIL ( g/Cm3 ) Wd = W3/V 1.70 1.82 1.88 1.87 NMC
CONTAINER NUMBER 13 8 43 36 31
WET SOIL + CONTAINER (g) a 309.9 354.4 365.5 387.3 343.8
MOISTURE

DRY SOIL + CONTAINER (g) b 266.7 296.3 295.9 306.8 321.7


WEIGHT OF CONTAINER (g) c 33.7 35.80 30.4 40.6 38.2
WEIGHT OF WATER (g) e = a-b 43.2 58.1 69.6 80.5 22.1
WEIGHT OF DRY SOIL (g) d =b-c 233.0 260.5 265.5 266.2 283.5
MOISTURE CONTENT (%) m= (e/d)*100 18.54 22.3 26.2 30.2 7.8

DRY DENSITY OF SOIL ( g/Cm3 ) Dd = Wd/(100+m)*100 1.43 1.49 1.49 1.43

MDD : 1.55 g/cc


MOISTURE DENSITY RELATIONS
1.50 OMC : 18.7 %

1.49 1.495

1.48

1.47
DRY DENSITY g/cc

24.0
1.46

1.45

1.44

1.43

1.42
18 19 20 21 22 23 24 25 26 27 28 29 30 31
MOISTURE CONTENT %

MDD : 1.495 g/cm3


OMC : 24.00 %

REMARK:

Contractor Consultant
Sr/Lab.Tech.:- Checked by:- Lab. Tech.:- P/Mat. Engineer:-
Date:- Date:- Date:- Date:-
A
A
(
A A
(
+A A
B (
) A
+
-
C( +
B
A )
-B
+ )
C
-
B C
)

C
Alemayehu Ketema
Gondwana Engineering plc
General Contractor
Ethiopian Roads Auyhority

EDO -SEROFTA-WERKA ROAD PROJECT (Km 0+000 ~ 73+245.92)

SOIL CONSISTENCY TEST RESULT (TEST METHOD:AASHTO T-89, & T-90)

Representing Section 50+350 - 50+500fw Visual Description Dark to brown clay soil

Sampling Station 50+380,50+420,50+480 Sampling Date 22-Jan-21


Material Type Subgrade Testing Date 24-Jan-21
Depth 0.6 Lab.# 580

Liquid Limit Plastic Limit

No. of Blows 31 24 17
Container Number A-3 C 2 B-2 A-5

Wt. of Container + Wet Soil (g) = (W1) 38.07 38.787 38.300 28.545 28.042

Wt. of Container + Dry Soil (g) = (W2) 33.032 33.468 33.15 27.230 26.767

Wt. of Container (g) = (W3) 23.46 23.642 23.80 23.824 23.441

Weight of Moisture (g) = (W1 - W2) = A 5.04 5.319 5.15 1.32 1.28

Weight of Dry Soil (g) = (W2 - W3) = B 9.58 9.83 9.35 3.41 3.33

Moisture Content (%) = (A / B )x 100 52.61 54.13 55.1 38.61 38.33


AV. PL 38.5

56.0

55.0
Moisture Content %

54.0
53.6

53.0

A A
25
( (
A A
52.0
10 +A +A 100
90 80 B70 60 50 40 30 20
B
) Number of Blows )
- -
C( C(
LIQUIDLIMIT LL 53.6 A AASHTO Classification:A A-2-7(1)
PLASTIC LIMIT PL 38.5 Wt of Before Washing (gm) 799.7
+ Wt Retained(gm) +
PLASTICITY INDEX (LL-PL)=PI 15.1 % Cum.%
Sieve sizes(mm)
B B
Retained(gm) Pass
) )
2 202.1 25.27 74.73
- -
0.425 216.7 27.10 47.63
Remark
C 0.075 100.9 12.62C 35.01
pan

Contractor Consultant
Sr/Lab.Tech.:- Checked by: Lab.Tech.:- P/Mat. Engineer:-
x

A 1
A A 0
( A 0
(A (
x
Date:- Date: A Date:- Date:- 1
A A 0
( A 0
(A (
A+ A
+B ( +
B) A B
)- )
-C + -
C C
B
)
-
C
Gondwana Alemayehu Ketema General
Engineering plc Contractor
Ethiopian Roads Authority

EDO-SEROFTA-WARKA ROAD PROJECT (Km 0+000 ~ 73+245.92)


CALIFORNIA BEARING RATIO WORK SHEET (TEST METHOD AASHTO T-193)

50+350 - 50+500fw Visual Descrip. Dark to brown clay soil


Representing Section
Sampling Station 50+380,50+420,50+480 Sampling Date 22-Jan-21
Material Type Subgrade Soaking Date 24-Jan-21
Lab # 580 Testing Date 28-Jan-21

DENSITY DETERMINATION

10 Blows 30 Blows 65 Blows


SOAKING CONDITION
BEFORE AFTER BEFORE AFTER BEFORE

MOLD NUMBER A-10 M-2 A-65

WEIGHT OF SOIL + MOLD ( g) W1 10620 10955 11440 11623 11100

WEIGHT OF MOLD ( g) W2 6280 6280 6820 6820 6240

VOLUME OF MOLD (Cm ) 3


V 2580 2580 2572 2572 2568

WEIGHT OF WET SOIL ( g) W 3 = W 1 - W2 4340 4675 4620 4803 4860

WET DENSITY OF SOIL ( g/cm3) Wd = (W3/V) 1.68 1.81 1.80 1.87 1.89

DRY DENSITY OF SOIL ( g/cm3) Dd = Wd/(100+m)*100 1.34 1.35 1.43 1.41 1.503

MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION AFTER AFTER AFTER
BEFORE BEFORE BEFORE
TOP 1 in. TOP 1 in. TOP 1 in.
CONTAINER NUMBER 36 39 35 36 44 34

WET SOIL + CONTAINER ( g) a 384.20 326.00 359.90 325.00 316.10 280.00

DRY SOIL + CONTAINER ( g) b 313.10 250.00 293.20 252.00 258.80 220.00

WEIGHT OF CONTAINER ( g) c 39.60 30.00 34.70 29.10 37.50 29.00

WEIGHT OF WATER ( g) d=a-b 71.1 76.0 66.7 73.0 57.30 60.0

WEIGHT OF DRY SOIL ( g) e=b-c 273.5 220 258.5 222.9 221.30 191
MOISTURE CONTENT ( %) m =( d/e)*100 26.00 34.55 25.80 32.75 25.89 31.41

AVG. MOIST. CONTENT ( %)

PENETRATION TEST DATA


PENETRATION 10 Blows 30 Blows 65 Blows
(mm) DIAL RDG COR. LOAD (kn) CBR % DIAL RDG COR. LOAD (k CBR % DIAL RDG COR LOAD (kn))
0 0 0.00 0 0 0 0.00
0.64 25.0 0.53 30.0 0.64 40.0 0.85
1.27 45.0 0.96 59.0 1.26 80.0 1.70
1.96 69.0 1.47 87.0 1.85 114.0 2.43
2.54 79.0 1.68 12.59 109.0 2.32 17.37 147.0 3.13
3.18 91.0 1.94 120.0 2.55 166.0 3.53
3.81 98.0 2.09 133.0 2.83 187.0 3.98
4.45 104.0 2.21 141.0 3.00 206.0 4.38
5.08 110.0 2.34 11.75 146.0 3.11 15.59 219.0 4.66
7.62 115.0 2.45 155.0 3.30 230.0 4.89
10.16
12.7

SWELL
MDD (gm/cc) 1.495
No. OF BLOWS 10 30 65
RDG (BEFORE SOAKING) 2.73 1.11 1.81 Ring Factor (N/div)= 21.28
95 % of MDD 1.420
RDG (AFTER) SOAKING) 3.20 1.40 1.99 `
PERCENT SWELL 0.40 0.25 0.15
C.B.R.at 95%of MDD 17.00
AVERAGE PERCENT SWELL : 0.27

REMARK:

Contractor Consultant
Sr/Lab. Tech.:- Checked by- Lab. Tech.:- P/Material Engineer:-
Date:- Date:- Date:- Date:-
A
A
(
A (
+ A
B +
) B
- )
C -
C
Alemayehu Ketema General
Contractor

A ROAD PROJECT (Km 0+000 ~ 73+245.92)


ATIO WORK SHEET (TEST METHOD AASHTO T-193)

Dark to brown clay soil

22-Jan-21
24-Jan-21
28-Jan-21

TY DETERMINATION

65 Blows

AFTER

A-65

11168

6240

2568

4928

1.92

1.46

URE DETERMINATION
65 Blows
AFTER

RATION TEST DATA


65 Blows
CBR %

23.43

23.38

1.495

1.420

17.00

Consultant
P/Material Engineer:-
Gondwana Alemayehu Ketema
Engineering plc General Contractor
A A
Ethiopian Roads Authority
( (
A EDO-SEROFTA-WARKA ROAD PROJECT (Km0+000-73+245.92) A
CALIFORNIA BEARING RATIO TEST (TEST METHOD AASHTO T-193) +
+ B+A
B )B
Representing Section
) 50+350 - 50+500fw Visual Descrip. -)Dark to brown clay soil
- C-
Sampling StationC 50+380,50+420,50+480 Sampling Date C( 22-Jan-21
A
Material Type Subgrade Soaking Date 24-Jan-21
+
Lab # 580 Testing Date 28-Jan-21
B
)
LOAD (KN) CBR(%) SWELL DRY DENSITY Vs SOCKED C.B.R.
BLOWS
2.54mm 5.08mm 2.54mm 5.08mm % No # OF BLOWS 10 - 30 65
10 1.68 2.34 12.6 11.7 0.40 Swell 0.40 C 0.25 0.15
30 2.32 3.11 17.4 15.6 0.25 DRY DENSITY 1.335 1.428 1.503
65 3.13 4.66 23.4 23.4 0.15 SOCKED C.B.R. 12.59 17.4 23.4

5.00

4.50

4.00
UNIT LOAD ON PISTON (KN)

3.50

3.00

2.50

2.00

1.50

1.00

0.50

0.00
0 0.64 1.28 1.92 2.56 3.2 3.84 4.48 5.12 5.76 6.4 7.04 7.68
PENETRATION (mm)

DENSITY - CBR CURVE DENSITY - SWELL CURVE


25.00 0.60

23.00

21.00
Soaked CBR (%)

0.40

19.00
Swell ( %)

17.0%
17.00
0.26%
0.20
15.00
1.420
1.420
13.00

11.00 0.00
1.32 Dry density
1.34 1.36 (g/cc)
1.38 1.40 1.42 1.44 1.46 1.48 1.50 1.52 1.32 1.34 1.36 (g/cc)
Dry density 1.38 1.40 1.42 1.44 1.46 1.48 1.50 1.52

MODIFIED PROCTOR : T 180


MDD (g/cc) : 1.495
OMC (%) : 24.00
95% of MDD(g/cc) 1.420
CBR at 95% of MDD 17.0
Swell at 95% of MDD 0.26
REMARKS:

Contractor Consultant
Sr/ Lab. Tech.:- Checked by:- Lab. Tech.:- P/Material Engineer:-

(
A
+
Date:- Date:- Date:- Date:-
A
A
(
A
(
+
A
B
+
)
B
-
)
C
-
C
Alemayehu Ketema
Gondwana Engineering plc
General Contractor

Ethiopian Roads Auyhority

EDO -SEROFTA-WERKA ROAD PROJECT (Km 0+000 ~ 73+245.92)

Determination of Natural Moisture Content of SOIL (TEST METHOD: AASHTO T-265 )

yellowish silty, clayed


Representing Section 50+350 - 50+500fw Visual Descrip. materials
Sampling Station 50+380,50+420,50+480 Sampling Date 22-Jan-21
Material Type Subgrade Testing Date 23-Jan-21
Depth (M) 0.6 Lab # 580

CONTAINER NUMBER 12 5
NATURAL MOISTURE CONTENT OF SOILS

WET SOIL + CONTAINER (g) a 325.0 373.3


BEFORE SUN LIGHT DRY

DRY SOIL + CONTAINER (g) b 231.5 264.7

WEIGHT OF CONTAINER (g) c 40.1 43.50

WEIGHT OF WATER (g) e = a-b 93.5 108.6

WEIGHT OF DRY SOIL (g) d =b-c 191.4 221.2

MOISTURE CONTENT (%) m= (e/d)*100 48.9 49.1

Average (%) 49.0

MDD; 1.4945 g/cm3


OMC(%) 24 %

REMARK:

Contractor Consultant
Sr/Lab.Tech.:- Checked by:- Lab. Tech.:- P/Mat. Engineer:-
Date:- Date:- Date:- Date:-
A
A
( A
A
(
+A A
(
B A
) +
- +
C( B
A )B
-)
+ C
-
C
B
)

You might also like