Summary of Subgrade After Excavation Material Test Result and Approval Record Sheet
Summary of Subgrade After Excavation Material Test Result and Approval Record Sheet
Summary of Subgrade After Excavation Material Test Result and Approval Record Sheet
Representing Section: 50+350 - 50+500fw Visual Descrip.: Dark to brown clay soil
AASHTO T193
For Contractor
Verified & Submitted by : Sign : Date:
31-Jan-21
( ( (
A A A
+ + +
B B B
) ) )
- - -
C C C
Alemayehu Ketema General
Gondwana Engineering plc
Contractor
Ethiopian Roads Auyhority
Representing Section 50+350 - 50+500fw Visual Descrip. Dark to brown clay soil
TRIAL NUMBER 1 2 3 4
Water % 600 800 1000 1200
WEIGHT OF SOIL + MOLD (g) W1 8,600 8,860 8,980 8,960
DENSITY
1.49 1.495
1.48
1.47
DRY DENSITY g/cc
24.0
1.46
1.45
1.44
1.43
1.42
18 19 20 21 22 23 24 25 26 27 28 29 30 31
MOISTURE CONTENT %
REMARK:
Contractor Consultant
Sr/Lab.Tech.:- Checked by:- Lab. Tech.:- P/Mat. Engineer:-
Date:- Date:- Date:- Date:-
A
A
(
A A
(
+A A
B (
) A
+
-
C( +
B
A )
-B
+ )
C
-
B C
)
C
Alemayehu Ketema
Gondwana Engineering plc
General Contractor
Ethiopian Roads Auyhority
Representing Section 50+350 - 50+500fw Visual Description Dark to brown clay soil
No. of Blows 31 24 17
Container Number A-3 C 2 B-2 A-5
Wt. of Container + Wet Soil (g) = (W1) 38.07 38.787 38.300 28.545 28.042
Wt. of Container + Dry Soil (g) = (W2) 33.032 33.468 33.15 27.230 26.767
Weight of Moisture (g) = (W1 - W2) = A 5.04 5.319 5.15 1.32 1.28
Weight of Dry Soil (g) = (W2 - W3) = B 9.58 9.83 9.35 3.41 3.33
56.0
55.0
Moisture Content %
54.0
53.6
53.0
A A
25
( (
A A
52.0
10 +A +A 100
90 80 B70 60 50 40 30 20
B
) Number of Blows )
- -
C( C(
LIQUIDLIMIT LL 53.6 A AASHTO Classification:A A-2-7(1)
PLASTIC LIMIT PL 38.5 Wt of Before Washing (gm) 799.7
+ Wt Retained(gm) +
PLASTICITY INDEX (LL-PL)=PI 15.1 % Cum.%
Sieve sizes(mm)
B B
Retained(gm) Pass
) )
2 202.1 25.27 74.73
- -
0.425 216.7 27.10 47.63
Remark
C 0.075 100.9 12.62C 35.01
pan
Contractor Consultant
Sr/Lab.Tech.:- Checked by: Lab.Tech.:- P/Mat. Engineer:-
x
A 1
A A 0
( A 0
(A (
x
Date:- Date: A Date:- Date:- 1
A A 0
( A 0
(A (
A+ A
+B ( +
B) A B
)- )
-C + -
C C
B
)
-
C
Gondwana Alemayehu Ketema General
Engineering plc Contractor
Ethiopian Roads Authority
DENSITY DETERMINATION
WET DENSITY OF SOIL ( g/cm3) Wd = (W3/V) 1.68 1.81 1.80 1.87 1.89
DRY DENSITY OF SOIL ( g/cm3) Dd = Wd/(100+m)*100 1.34 1.35 1.43 1.41 1.503
MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION AFTER AFTER AFTER
BEFORE BEFORE BEFORE
TOP 1 in. TOP 1 in. TOP 1 in.
CONTAINER NUMBER 36 39 35 36 44 34
WEIGHT OF DRY SOIL ( g) e=b-c 273.5 220 258.5 222.9 221.30 191
MOISTURE CONTENT ( %) m =( d/e)*100 26.00 34.55 25.80 32.75 25.89 31.41
SWELL
MDD (gm/cc) 1.495
No. OF BLOWS 10 30 65
RDG (BEFORE SOAKING) 2.73 1.11 1.81 Ring Factor (N/div)= 21.28
95 % of MDD 1.420
RDG (AFTER) SOAKING) 3.20 1.40 1.99 `
PERCENT SWELL 0.40 0.25 0.15
C.B.R.at 95%of MDD 17.00
AVERAGE PERCENT SWELL : 0.27
REMARK:
Contractor Consultant
Sr/Lab. Tech.:- Checked by- Lab. Tech.:- P/Material Engineer:-
Date:- Date:- Date:- Date:-
A
A
(
A (
+ A
B +
) B
- )
C -
C
Alemayehu Ketema General
Contractor
22-Jan-21
24-Jan-21
28-Jan-21
TY DETERMINATION
65 Blows
AFTER
A-65
11168
6240
2568
4928
1.92
1.46
URE DETERMINATION
65 Blows
AFTER
23.43
23.38
1.495
1.420
17.00
Consultant
P/Material Engineer:-
Gondwana Alemayehu Ketema
Engineering plc General Contractor
A A
Ethiopian Roads Authority
( (
A EDO-SEROFTA-WARKA ROAD PROJECT (Km0+000-73+245.92) A
CALIFORNIA BEARING RATIO TEST (TEST METHOD AASHTO T-193) +
+ B+A
B )B
Representing Section
) 50+350 - 50+500fw Visual Descrip. -)Dark to brown clay soil
- C-
Sampling StationC 50+380,50+420,50+480 Sampling Date C( 22-Jan-21
A
Material Type Subgrade Soaking Date 24-Jan-21
+
Lab # 580 Testing Date 28-Jan-21
B
)
LOAD (KN) CBR(%) SWELL DRY DENSITY Vs SOCKED C.B.R.
BLOWS
2.54mm 5.08mm 2.54mm 5.08mm % No # OF BLOWS 10 - 30 65
10 1.68 2.34 12.6 11.7 0.40 Swell 0.40 C 0.25 0.15
30 2.32 3.11 17.4 15.6 0.25 DRY DENSITY 1.335 1.428 1.503
65 3.13 4.66 23.4 23.4 0.15 SOCKED C.B.R. 12.59 17.4 23.4
5.00
4.50
4.00
UNIT LOAD ON PISTON (KN)
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00
0 0.64 1.28 1.92 2.56 3.2 3.84 4.48 5.12 5.76 6.4 7.04 7.68
PENETRATION (mm)
23.00
21.00
Soaked CBR (%)
0.40
19.00
Swell ( %)
17.0%
17.00
0.26%
0.20
15.00
1.420
1.420
13.00
11.00 0.00
1.32 Dry density
1.34 1.36 (g/cc)
1.38 1.40 1.42 1.44 1.46 1.48 1.50 1.52 1.32 1.34 1.36 (g/cc)
Dry density 1.38 1.40 1.42 1.44 1.46 1.48 1.50 1.52
Contractor Consultant
Sr/ Lab. Tech.:- Checked by:- Lab. Tech.:- P/Material Engineer:-
(
A
+
Date:- Date:- Date:- Date:-
A
A
(
A
(
+
A
B
+
)
B
-
)
C
-
C
Alemayehu Ketema
Gondwana Engineering plc
General Contractor
CONTAINER NUMBER 12 5
NATURAL MOISTURE CONTENT OF SOILS
REMARK:
Contractor Consultant
Sr/Lab.Tech.:- Checked by:- Lab. Tech.:- P/Mat. Engineer:-
Date:- Date:- Date:- Date:-
A
A
( A
A
(
+A A
(
B A
) +
- +
C( B
A )B
-)
+ C
-
C
B
)