CMS ClinkerBrochure
CMS ClinkerBrochure
CMS ClinkerBrochure
CMS Clinker Sdn Bhd is located on a 24.8 hectare site at Mambong, 28 km southeast of Kuching city, Sarawak. The plant consists of a raw mill for grinding, coal grinding facilities and kiln burning. Neighbouring the plant is CMS Clinkers own quarrying concessions of key raw materials limestone, shale and sandstone - covering 78 hectares. Incorporated in 1992, the Company began as Sarawak Clinker under the Sarawak Economic Development Corporation (SEDC). Its plant was commissioned in 1996 with a production capacity of 2,000 metric tones (MT) per day. This capacity was upgraded in 2004 to 2,400 MT per day. In November 2007, the Company which had since seen ownership by Indonesian and Filipino entities, was acquired by CMS Cement Sdn Bhd, a subsidiary of Malaysian public-listed conglomerate Cahya Mata Sarawak Berhad (CMS). January 2008 marked a new beginning for the Company when it changed its name to CMS Clinker. Its current production capacity is 2,500 MT per day or up to 800,000 MT per annum. CMS Clinker is the sole manufacturer of clinker in East Malaysia.
Our Facilities
Limestone, Shale & Sandstone concessions in the vicinity of the Plant Limestone crusher plant Combined storage hall Boom stacker Reclaimer Raw Mill Coal Mill Kiln Grate cooler Silos (2 X 2500 MT and 1 X 15,000 MT capacity) A cost effective underground water cooling system, complete with a 33 kV PDS sub-station & fire hydrants Philips XRF Spectrometer & PARR Bomb Calorimeter to monitor raw materials, fuel & product quality
CLINKER main
is the raw material in the manufacture of
Product Specs
SiO2 Fe2O3 AI2O3 CaO MgO SO3 LOI Na2O K2O = = = = = = = = = min 21.50 % max 4.00 % max 6.00 % min 65.00 % max 3.00 % max 0.90 % max 1.00 % max 0.40 % max 0.70 % CI IR Free Lime Total Alkali LSF C3S C2S C3A C4AF = = = = = = = = =
cement
max 0.10 % max 0.50 % max 2.00 % max 0.90% min 0.90 % min 48.00 % max 10.00 % max 12.00 % max 13.00 %
Vision
To be the leader in the clinker industry in Sarawak and a significant player beyond.
To strive for product and through continuous improvement in customer satisfaction while creating value for our stakeholders and caring for the community around us.
Mission
How We Work
We aim to realize our Vision by ensuring that our clinker manufacturing process attains the following: Quality Products & Services Conservation of the Environment Incorporation of best practices in Occupational Health & Safety (OHS) Compliance with environmental, OHS and other legislations & regulations Compliance with the requirements of QMS, EMS and OHSMS, and continuously improving their effectiveness We firmly believe these can be achieved through: Producing consistent quality clinker Identifying, satisfying & exceeding our customers needs Minimizing material waste & wastage Reducing dust & noise emissions Eliminating / mitigating causes of accidents & occupational disease Nurturing & instilling safety awareness amongst our employees
The clinker produced is suitable for the manufacture of cement in compliance with Malaysian Standard MS 522 and other equivalant standards.
CMS CLINKER
Contact Us
service excellence
CMS CLINKER
CMS CLINKER SDN BHD (Co. No. 49256-V) Lot 571 Jalan Mambong, Off Jalan Puncak Borneo 93250, Kuching, Sarawak, Malaysia T: +60 82 610 229 F: +60 82 610 227 E: clinker@cmsb.com.my
www.cmsb.com.my/clinker
FROM LST QUARRY RECLAIMER INTERMEDIATE SILO STACKER HAMMER CRUSHER APRON FEEDER
Step 1: Quarrying
Limestone, shale and sandstone form the main raw materials to manufacture clinker. For CMS Clinker, all three materials are quarried within its plant at Mambong, ensuring a continuous supply of quality raw materials.
PREHEATER
C-1 FINES SEPARATOR CYCLONE SEPARATOR CYCLONE SEPARATOR FINES SEPARATOR HOMO SILO AERATED WEIGHT BIN C-2 C-3
KILN TAILING SEPARATOR TAILING SEPARATOR FEED BIN STATIC SEPARATOR FEED BIN SCREW PUMP EGB CYCLONE COLLECTOR CLINKER COOLER BULK TRUCK
Step 6: Cooling & Storing Step 2: Crushing & Storage of Raw Materials
Different crushers are used for the three raw materials to obtain aggregates of less than 25 mm in size - limestone is crushed by a hammer crusher, shale is put through a roller crusher and sandstone is crushed by an impact crusher. The resulting crushed materials are then stored in silos and storage halls.
From the kiln, the hot clinker is cooled to a temperature of 1200C at the grate cooler which uses seven cooling fans. The clinker is further crushed to smaller balls of less than 25 mm diameter in size using a hammer crusher before being transferred using the bucket conveyor system to the clinker silo.
SCREW PUMP
E. P. RAW GRINDING MILL RAW GRINDING MILL CYCLONE FILTER RAW HAMMER MILL COAL PULVERIZED BIN CLASSIFIER CYCLONE
GCT
Step 7: Delivery
CMS Clinker has the capacity to deliver 2,500 MT per day of clinker.
SCREW CONVEYOR COAL MILL