Description Civil & Interior Works General Notes :All refurbishments door with 3 nos of hinges with handle as per approval from client & Open door closer of Ozone make. All glazed partition with 100mm x 100mm plywood boxing / solid wooden with laminate finish with melamine polish glass beading . Reception & Reception Meeting Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Partition & Panelling Ceiling Grid Ceiling Screeding
Unit
Qty
Rate
Amount
REMARKS
A 1.1
1.2
Screeding CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions.
1.3
1.4
Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Ceiling
Sqm
39.00
150
5,850
Sqm
22.05
775
17,089
1 of 51
Sr.No
Description Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres. 12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling.
Unit
Qty
Rate
Amount
REMARKS
1.4A 1.5
Same as Above but in Cove light / Band up to 150 mm Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile.
Rmt Sqm
18.00 16.20
250 950
4,500 15,390
1.6
Reception Table
Nos
1.00
70,000
70,000
2 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
RECEPTION TABLE :-Providing and Fixing Reception table as per approved design in the drawing .finish with 6mm thick Glacia white colour Corian with combination of veneer with melamine polish on external side , 25 mm thick table top block board finish in corian under structure to be finished in approved veneer with 19mm thick block board. All edges to be PVC finish as per the finish approved. All hardware's Hettich equivalent. Cost to include the 1 nos of pedestal as instructed in the drawing.Cost to include all under structure and super structure finish for all electrical,data ,services points and all the items to complete the same. (Basic Rate for Corian Rs. 650 per Sqft & veneer Rs. 70 Per Sqft .) 1.7 Reception Back Drop - Modifying Providing & fixing Reception panelling refurbishment with 4mm thk mdf skinning to receive graphics inclusing base coat of paint . Repoilising of Existing Partition & Panelling Removing & Appling 2 coats of melamine polish on existing Veneer / Wooden surface Same as above but for moulding grooves & steps up to 12mm to 150mm . Partition -Gypsum FULL HEIGHT PARTITION: Providing and fixing frame of Full height 75mm thick partition with GI Framework @ 600 mm c/c both ways (Fire retardant and anti-termite treated) up to 2700 mm finish with 12 mm ply wood till 100 above false ceiling & above , till true ceiling finished with both side one layer of 12.5mm thk Gypsum board on either side with glass wool insulation 50 mm thick glass wool insulation of48 kg/ cum. density neatly packed in tissue bags of various sizes and shapes, bags shall be fully stitched all round with25 mm double leaf fold, sealing the glass wool fibre fully. The bags to be stuffed in the cavities of Gyp. partitions from floor up to RCC slab above, cross stitched from one side with GI frame work of partition by 24 g GI wire to keep bags in position. UP Twig/Rocklloyd make grade specified fixing to floor & RCC roof with screw i/c provisions for grooves and Fibber tape to be used for jointing and space/ cutouts for electrical sockets/switches and conduits etc. as per detail drawings and specification and as directed by Architect and duly fixed to floor/wall/RCC roof with fasteners. Member placement to be worked out as per grooves. complete as per drawing. Note : - All vertical & Horizontal edges will be covered 12mm MDF with paint finish . To receive modular partition section & making pen tray cut outs as directed by architects . Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Note: Do not include base partition & framing for quote. 2.1 Fabric Panelling Sqm 17.55 2,800 Sqm 12.00 980
11,760 -
1.8
Sqm
175.00
575
100,625 -
1.8A 1.9
Rmt Sqm
125.00 14.43
185 1,500
23,125 21,645
2.0
49,140
3 of 51
Sr.No
Description FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing.Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr)
Unit
Qty
Rate
Amount
REMARKS
2.2
Column Cladding Modifying GYPSUM CLADDING :- Providing and fixing of 12.5mm thick(Single layer) Gyp-board cladding (Confirming to IS-2095-1982 and 2543-1982)over existing partition/ with GI Frame work on screws fixed with dry wall screw of 25mm at 300mm centre square and tapered edges of the boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape and two coats of primer suitable for Gypboard to receive graphics .
Sqm
17.33
400
6,930
2.3
2.4
Door Refurbishment Refurbishment of existing doors as per detailed drawings with Door bedding & modification with door fame including repolishing of existing veneer in 2 coats of melamine polish both side all necessary fittings. ( Hardware includes Hinges , Handle , open door closer ) Veneer Panelling VENEER PANNELING:-Providing and fixing 4mm thick. veneer panelling of approved sample in one group, fixed on existing 12mm thick . commercial ply backing inclusive of match wood lapping, groove should be provide within the veneer as directed Inclusive of matt melamine polished to the veneer & all the edges as directed. Basic Rate of Veneer is INR 70/- per Sqft.
Nos
3.00
12,500
37,500
Sqm
4.50
3,250
14,625
2.5
2.6
MDF Cladding for Graphics / Paint MDF PANNELING:-Providing and fixing 12mm thick. MDF fixing on existing Partition / Frame work with groove & necessary fixing. Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) Breakout Area Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Ceiling Grid Ceiling Screeding
Sqm
36.80
775
28,520 -
Sqm
27.00
1,150
31,050
B 1.1
4 of 51
Description
Unit Sqm
Qty 36.00
Rate 425
Amount 15,300
REMARKS
CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions. 1.3 Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Wooden finish Flooring LAMINATED WOODEN FLOORING Basic Rate 180 INR /SQ.FT-Providing and laying laminated wooden flooring in the form of planks of size 12 / 10mm thick, laid on IPS base with 2mm form backing including edge profile/ beading wherever required all complete as per Architects Instructions (Basic Rate Rs. 180 Per Sqft ) Planter Box CORIAN LEDGE(PLANTERS) : -Providing and fixing of 6mm thick glacia white corian finish to be made in hardwood framing. The 25 mm commercial board to be fixed with 1mm thick laminate finished under structure as approved design. The rate to include the pebbles of the width of 1200 mm wide as directed by Architect.-laminate finish only 1.6 Designer Ceiling Providing and fixing Gypsum False in Designer Shape like Round / Oval ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres. Sqm 35.00 1,050 Sqm 35.65 150
5,348
1.4
Sqm
35.00
2,650
92,750
1.5
Rmt
4.00
5,500
22,000
36,750
5 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling.
C 1.1
IT Service Area Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Partition & Panelling Ceiling & Grid Ceiling Screeding Sqm Sqm Sqm Sqm 58.00 74.00 33.00 122.10 225 180 225 2,300 13,050 13,320 7,425 280,830
1.1
Fire Rated Partition FIRE RATED FULL HEIGHT PARTITION: Providing and fixing frame of Full height 100mm thick partition with GI 50 x 35 Framework @ 600 mm c/c both ways (Fire retardant and anti-termite treated) up to true ceiling finish with 12 mm bison board on both side single layer & 1 layer of fire rated gypsum board both side including glass wool insulation 50 mm thick glass wool insulation of48 kg/ cum. density neatly packed in tissue bags of various sizes and shapes, bags shall be fully stitched all round with25 mm double leaf fold, sealing the glass wool fibre fully.
The bags to be stuffed in the cavities of Gyp. partitions from floor up to RCC slab above, cross stitched from one side with GI frame work of partition by 24 g GI wire to keep bags in position. UP Twig/Rocklloyd make grade specified fixing to floor & RCC roof with screw i/c provisions for grooves and Fibber tape to be used for jointing and space/ cutouts for electrical sockets/switches and conduits etc. as per detail drawings and specification and as directed by Architect and duly fixed to floor/wall/RCC roof with fasteners. Member placement to be worked out as per grooves. complete as per drawing. 1.2 Slotted Angle Sqm 13.23 17,500 231,525
6 of 51
Sr.No
Description SLOTTED ANGLE RACKS: Providing and fixing storage in 20 gauge MS slotted angle of 35mmx35mm finished with approved shade powder coating with 600mm wide 19mm thick PRE LAM BOARD with laminated finish both side with 2mm thick PVC edge binding. Rates are inclusive of all necessary powder coated nut-bolt fittings, edge guard bush for slotted angles etc. Complete with all respect as per detail drawing and Architect Instructions. Filing Storage FILING STORAGE :- Providing & fixing Full height Storage cabinets 450 mm deep made out of 19mm commercial board 1 mm thick laminate and balancing laminate all inside adjustable laminated shelves. Rate should be inclusive of necessary Hardware- , Lock sets, self-closing hinges, spring loaded shutter latch inside, all cabinet hardware as approved & as /Architects approval. Hardware Hettich equivalent .
Unit
Qty
Rate
Amount
REMARKS
1.3
Sqm
5.60
7,200
40,320
1.4
Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile.
Sqm
80.00
950
76,000
1.5
Wooden Door Providing and fixing Single leaf Flush Door 38mm ,both side approved Laminate finish & melamine polish finish on edge with vision panel ( 1000mm x 150mm) of 6mm thk glass fixed on wooden beading , shutter fixed on Wooden frame 105mm x 50mm with door jamb fitting as per detail drawing . The doors will have best quality 4 Nos 4" long SS hinges, SS finished double legged foot operated door stays, Polyvinyl door stopper fixed to skirting, SS finish 25mm die 600mm high handle (OZONE), lock, with OZONE make Open Door closer shall be include in the cost of door. Complete as per detail drawing . Door Size - 900 x 2400
Nos
1.00
15,500
15,500
False Flooring Removing & Refixing Same as above but fixing with new tiles Meeting & Collaborative Area Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling
Sqm Sqm
15.60 10.00
850 2,950
13,260 29,500
7 of 51
Sr.No
Description DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Partition & Panelling Ceiling Grid Ceiling Screeding
Unit
Qty
Rate
Amount
REMARKS
1.2
Screeding CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions.
1.3
1.4
1.5
Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Door Refurbishment Refurbishment of existing doors as per detailed drawings with Door bedding & modification with door fame including repolishing of existing veneer in 2 coats of melamine polish both side all necessary fittings. A.V Cabinet - Refurbishment AV CABINET : Refurbishment of Audio Visual cabinet of with New laminate schemes & paint as per architects instructions with finger groove shutter. NOTE: all hardware of ozone or equivalent. The rate to include the cost to complete the entire item.
Sqm
11.00
150
1,650
Nos
3.00
12,500
37,500
Sqm
6.80
4,000
27,200
1.6
Ceiling
Sqm
19.00
775
14,725
8 of 51
Sr.No
Description Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres. 12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling.
Unit
Qty
Rate
Amount
REMARKS
1.7
Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile.
Sqm
15.00
950
14,250
1.8
1.9
Cabinet - Refurbishment Cabinet : Refurbishment of cabinet of with new laminate schemes as per architects instructions with finger groove shutter. NOTE: all hardware of ozone or equivalent. The rate to include the cost to complete the entire item. Fabric Panelling
Sqm
RO
4,500
Sqm
14.00
2,800
39,200
9 of 51
Sr.No
Description FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing.Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr)
Unit
Qty
Rate
Amount
REMARKS
2.0
2.1
2.2
2.3 2.4
2.5
2.6
E 1.1
Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects . Note: Do not include base partition & framing for quote. MDF Cladding MDF PANNELING:-Providing and fixing 12mm thick. MDF fixing on existing Partition / Frame work with groove including necessary fixing. Repoilising of Existing Partition & Panelling Appling 2 coats of melamine polish on existing Veneer surface Same as above but for moulding grooves & steps up to 12mm to 150mm . Modifications of Glass Partitions Modifications of Glass Partitions from partly glazed to full glazed partition with four side wooden band finish with laminate to match existing colour scheme . WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) Nirvana Near AHU Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Ceiling & Grid Ceiling Grid Ceiling Screeding Screeding
Sqm
7.00
3,500
24,500
Sqm
32.50
775
25,188 -
Sqm
75.00
575
43,125 -
Rmt Sqm
30.00 31.00
185 3,000
5,550 93,000 -
Sqm
32.56
1,750
56,980
Sqm
16.56
1,150
19,044
Sqm -
1.2
10 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions. 1.3 Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Ceiling Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres. 12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling. 1.5 Modular Ceiling 0.5 NRC Sqm 4.50 950 Sqm 5.00 150
750
1.4
Sqm
3.00
775
2,325
4,275
11 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile. 1.6 Door Refurbishment Refurbishment of existing doors as per detailed drawings with Door bedding & modification with door fame including repolishing of existing veneer in 2 coats of melamine polish both side all necessary fittings. Fabric Panelling FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing.Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr) 1.8 MDF Cladding for Graphics / Paint MDF PANNELING:-Providing and fixing 12mm thick. MDF fixing on existing Partition / Frame work with groove including necessary fixing. Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects Note: Do not include base partition & framing for quote. Full Height Storages FULL HEIGHT STORAGE :- Providing & fixing Full height Storage cabinets 450 mm deep made out of 19mm commercial board 1 mm thick laminate and balancing laminate all inside adjustable laminated shelves. Rate should be inclusive of necessary Hardware- , Lock sets, self-closing hinges, spring loaded shutter latch inside, all cabinet hardware as approved & as /Architects approval. Hardware Hettich equivalent 2.1 Full Height / Ele DB Refurbishment Sqm 6.00 3,000 Sqm 8.00 775 Nos 1.00 12,500
12,500
1.7
Sqm
4.48
2,800
12,544
6,200 -
1.9
Sqm
1.50
3,500
5,250
2.0
Sqm
8.55
7,200
61,560
18,000
12 of 51
Sr.No
Description ELECTRICAL D.B. STORAGE:- Refurbishment of DB shutters finished in 1mm thick. laminate Provide 150x300 duco painted louvered grills on each shutter, requisite cut-outs for ventilation above and servicing trap door below. Rate should be inclusive of necessary Hardware- handle, Lock sets, selfclosing hinges, spring loaded shutter latch inside complete as per design and drawing Architects approved . WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) 2P Quiet Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Ceiling Grid Ceiling Screeding Screeding CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions.
Unit
Qty
Rate
Amount
REMARKS
2.2
Sqm
6.21
1,750
10,868
2.3
Sqm
2.07
1,150
2,381
F 1.1
Sqm
1.2
1.3
1.4
Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Partition -Gypsum
Sqm
3.00
150
450
Sqm
7.20
1,500
10,800
13 of 51
Sr.No
Description FULL HEIGHT PARTITION: Providing and fixing frame of Full height 75mm thick partition with GI Framework @ 600 mm c/c both ways (Fire retardant and anti-termite treated) up to 2700 mm finish with 12 mm ply wood & above , till true ceiling finished with both side one layer of 12.5mm thk Gypsum board on either side with glass wool insulation 50 mm thick glass wool insulation of48 kg/ cum. density neatly packed in tissue bags of various sizes and shapes, bags shall be fully stitched all round with25 mm double leaf fold, sealing the glass wool fibre fully. The bags to be stuffed in the cavities of Gyp. partitions from floor up to RCC slab above, cross stitched from one side with GI frame work of partition by 24 g GI wire to keep bags in position. UP Twig/Rocklloyd make grade specified fixing to floor & RCC roof with screw i/c provisions for grooves and Fibber tape to be used for jointing and space/ cutouts for electrical sockets/switches and conduits etc. as per detail drawings and specification and as directed by Architect and duly fixed to floor/wall/RCC roof with fasteners. Member placement to be worked out as per grooves. complete as per drawing. Note : - All vertical & Horizontal edges will be covered 12mm MDF with paint finish . To receive modular partition section & making pen tray cut outs as directed by architects . Wooden Door Providing and fixing Single leaf Flush Door ,both side approved Laminate finish & melamine polish finish on edge with vision panel of 6mm thk glass fixed on wooden beading , shutter fixed on Wooden frame 105mm x 50mm with door jamb fitting as per detail drawing . The doors will have best quality 4 Nos 4" long SS hinges, SS finished double legged foot operated door stays, Polyvinyl door stopper fixed to skirting, SS finish 25mm die 600mm high handle (OZONE), lock, with OZONE make Concealed Door closer shall be include in the cost of door. Complete as per detail drawing .
Unit
Qty
Rate
Amount
REMARKS
1.5
1.6
Ceiling Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres.
Sqm
RO
775
14 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling. 1.7 Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile. 1.8 Glazed Partition Providing & fixing glass partition of 10mm toughened glass with wooden frame work in 12 mm ply wood boxing finish with laminate 100 X 100 mm high boxing as per existing site condition 1.9 DB Shutter ELECTRICAL D.B. STORAGE:- Refurbishment of DB shutters finished in 1mm thick. laminate Provide 150x300 duco painted louvered grills on each shutter, requisite cut-outs for ventilation above and servicing trap door below. Rate should be inclusive of necessary Hardware- handle, Lock sets, selfclosing hinges, spring loaded shutter latch inside complete as per design and drawing Architects approved . Laminate Ledge Providing & fixing laminate finish ledge made out of 25mm thick plywood with necessary fitting . WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film Sqm 5.00 3,000 Sqm 7.68 4,650 Sqm 4.50 950
4,275
35,712
15,000
2.0
Rmt
2.50
1,900
4,750 -
2.1
Sqm
6.83
1,750
11,954
2.2
Sqm
2.76
1,150
3,174
15 of 51
Sr.No
Description FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) 10P Meeting Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Ceiling Grid Ceiling Screeding Screeding CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions.
Unit
Qty
Rate
Amount
REMARKS
G 1.1
1.2
1.3
1.4
1.5
Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Door Refurbishment Refurbishment of existing doors as per detailed drawings with Door bedding & modification with door fame including repolishing of existing veneer in 2 coats of melamine polish both side all necessary fittings. Fabric Panelling FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing.Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr)
Sqm
15.00
150
2,250
Nos
1.00
12,500
12,500
Sqm
8.00
2,800
22,400
1.6
Glass Panelling
Sqm
3.00
3,500
10,500
16 of 51
Sr.No
Description GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects. Note: Do not include base partition & framing for quote. Storage Refurbishment Refurbishment of existing Storage cabinets 450 mm deep finish with new 1 mm thick laminate . Rate should be inclusive of necessary Hardware- , Lock sets, self-closing hinges, spring loaded shutter latch inside, all cabinet hardware as approved & as /Architects approval. Hardware - Hettich equivalent
Unit
Qty
Rate
Amount
REMARKS
1.7
Sqm
3.00
4,150
12,450
1.8
Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile.
Sqm
7.00
950
6,650
1.9
Ceiling Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres.
Sqm
14.00
775
10,850
#REF!
17 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling. 2.0 MDF Cladding for Graphics / Paint MDF PANNELING:-Providing and fixing 12mm thick. MDF fixing on existing Partition / Frame work with groove including necessary fixing. WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) 2P Quiet Room Near Conf.Room & Conf. Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Partition Gypsum Ceiling Grid Ceiling Screeding Screeding CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions. 1.3 Water Proofing Works Below Screeding Sqm 33.00 150 Sqm Sqm Sqm Sqm Sqm 16.00 10.00 10.00 33.00 33.00 225 180 180 225 400 Sqm 15.00 2,250
33,750 -
2.1
Sqm
12.11
2,000
24,219
H 1.1
1.2
4,950
18 of 51
Sr.No
Description WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Solid Partition -Gypsum FULL HEIGHT PARTITION: Providing and fixing frame of Full height 75mm thick partition with GI Framework @ 600 mm c/c both ways (Fire retardant and anti-termite treated) up to 2700 mm finish with 12 mm ply wood & above , till true ceiling finished with both side one layer of 12.5mm thk Gypsum board on either side with glass wool insulation 50 mm thick glass wool insulation of48 kg/ cum. density neatly packed in tissue bags of various sizes and shapes, bags shall be fully stitched all round with25 mm double leaf fold, sealing the glass wool fibre fully. The bags to be stuffed in the cavities of Gyp. partitions from floor up to RCC slab above, cross stitched from one side with GI frame work of partition by 24 g GI wire to keep bags in position. UP Twig/Rocklloyd make grade specified fixing to floor & RCC roof with screw i/c provisions for grooves and Fibber tape to be used for jointing and space/ cutouts for electrical sockets/switches and conduits etc. as per detail drawings and specification and as directed by Architect and duly fixed to floor/wall/RCC roof with fasteners. Member placement to be worked out as per grooves. complete as per drawing. Note : - All vertical & Horizontal edges will be covered 12mm MDF with paint finish . To receive modular partition section & making pen tray cut outs as directed by architects . Glazed Partition in wooden Providing & Fixing glazed partition to full glazed partition with four side wooden band finish with laminate to match existing colour scheme . Door Refurbishment Refurbishment of existing doors as per detailed drawings with Door bedding & modification with door fame including repolishing of existing veneer in 2 coats of melamine polish both side all necessary fittings. Wooden Door Providing and fixing Single leaf Flush Door ,both side approved Laminate finish & melamine polish finish on edge with vision panel of 6mm thk glass fixed on wooden beading , shutter fixed on Wooden frame 105mm x 50mm with door jamb fitting as per detail drawing . The doors will have best quality 4 Nos 4" long SS hinges, SS finished double legged foot operated door stays, Polyvinyl door stopper fixed to skirting, SS finish 25mm die 600mm high handle (OZONE), lock, with OZONE make Open Door closer shall be include in the cost of door. Complete as per detail drawing .
Unit
Qty
Rate
Amount
REMARKS
1.4
Sqm
22.08
1,500
33,120
1.5
1.6
1.6A
Nos
1.00
15,500
15,500
19 of 51
Description Refurbishment of Conference Table Repolishing of existing table with new wire management system as per architects requirement . MDF Cladding for Graphics / Paint MDF PANNELING:-Providing and fixing 12mm thick. MDF fixing on existing Partition / Frame work with groove S.S profile with necessary fixing.
REMARKS
1.9
Fabric Panelling FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing.Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr)
Sqm
16.00
2,800
44,800
2.0
2.1
2.2
2.3 2.4
Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects. Note: Do not include base partition & framing for quote. Laminate Ledge Providing & fixing laminated ledge of 25mm thick with necessary fitting . Repoilising of Existing Partition & Panelling Appling 2 coats of melamine polish on existing Veneer surface Same as above but for moulding grooves & steps up to 12mm to 150mm . Ceiling Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres.
Sqm
12.00
3,500
42,000
Rmt
3.00
1,900
5,700 -
Sqm
125.00
575
71,875 -
Rmt Sqm
125.00 35.00
185 775
23,125 27,125
20 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling. 2.5 Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile. WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) 7 P & 3 P Meeting Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Partition Gypsum Ceiling Grid Ceiling Screeding Screeding Sqm Sqm Sqm Sqm Sqm 3.00 3.00 4.00 8.00 18.00 225 180 180 225 400 Sqm 5.00 950
4,750
2.6
Sqm
20.80
1,750
36,406
2.5
Sqm
1.79
1,150
2,063
I 1.1
Sqm
1.2
21 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions. 1.3 Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Partition -Gypsum P1 FULL HEIGHT PARTITION: Providing and fixing frame of Full height 75mm thick partition with GI Framework @ 600 mm c/c both ways (Fire retardant and anti-termite treated) up to 2700 mm finish with 12 mm ply wood & above , till true ceiling finished with both side one layer of 12.5mm thk Gypsum board on either side with glass wool insulation 50 mm thick glass wool insulation of48 kg/ cum. density neatly packed in tissue bags of various sizes and shapes, bags shall be fully stitched all round with25 mm double leaf fold, sealing the glass wool fibre fully. The bags to be stuffed in the cavities of Gyp. partitions from floor up to RCC slab above, cross stitched from one side with GI frame work of partition by 24 g GI wire to keep bags in position. UP Twig/Rocklloyd make grade specified fixing to floor & RCC roof with screw i/c provisions for grooves and Fibber tape to be used for jointing and space/ cutouts for electrical sockets/switches and conduits etc. as per detail drawings and specification and as directed by Architect and duly fixed to floor/wall/RCC roof with fasteners. Member placement to be worked out as per grooves. complete as per drawing. Note : - All vertical & Horizontal edges will be covered 12mm MDF with paint finish . To receive modular partition section & making pen tray cut outs as directed by architects . Glazed Partition Providing & fixing glass partition of 10mm toughened glass with wooden frame work finish with melamine polish Fabric Panelling Sqm 18.00 150
2,700
1.4
Sqm
28.80
1,500
43,200
1.5
1.6
22 of 51
Sr.No
Description FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing.Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr)
Unit
Qty
Rate
Amount
REMARKS
1.7
1.8
1.9
2.0
2.1
MDF Cladding for Graphics / Paint MDF PANNELING:-Providing and fixing 12mm thick. MDF fixing on existing Partition / Frame work with groove including necessary fixing. Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects. Note: Do not include base partition & framing for quote. Laminate Ledge Providing & fixing laminated ledge of 25mm thick with necessary fitting . Door Refurbishment Refurbishment of existing doors as per detailed drawings with repolishing of existing veneer in 3 coats of melamine polish both side all necessary fittings. Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile.
Sqm
20.00
775
15,500 -
Sqm
6.00
3,500
21,000
Rmt
3.00
1,900
5,700 -
No's
2.00
12,500
25,000 -
Sqm
15.00
950
14,250
2.2
Ceiling
Sqm
10.00
775
7,750
23 of 51
Sr.No
Description Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres. 12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling. WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) 4 P Meeting Room & Nirvana Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions.
Unit
Qty
Rate
Amount
REMARKS
2.3
Sqm
19.56
1,750
34,233
2.4
Sqm
2.07
1,150
2,381
J 1.1
1.2
Screeding Screeding
Sqm Sqm
10.00 10.00
225 425
2,250 4,250
24 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions. 1.3 Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Partition -Gypsum P1 FULL HEIGHT PARTITION: Providing and fixing frame of Full height 75mm thick partition with GI Framework @ 600 mm c/c both ways (Fire retardant and anti-termite treated) up to 2700 mm finish with 12 mm ply wood & above , till true ceiling finished with both side one layer of 12.5mm thk Gypsum board on either side with glass wool insulation 50 mm thick glass wool insulation of48 kg/ cum. density neatly packed in tissue bags of various sizes and shapes, bags shall be fully stitched all round with25 mm double leaf fold, sealing the glass wool fibre fully. The bags to be stuffed in the cavities of Gyp. partitions from floor up to RCC slab above, cross stitched from one side with GI frame work of partition by 24 g GI wire to keep bags in position. UP Twig/Rocklloyd make grade specified fixing to floor & RCC roof with screw i/c provisions for grooves and Fibber tape to be used for jointing and space/ cutouts for electrical sockets/switches and conduits etc. as per detail drawings and specification and as directed by Architect and duly fixed to floor/wall/RCC roof with fasteners. Member placement to be worked out as per grooves. complete as per drawing. Note : - All vertical & Horizontal edges will be covered 12mm MDF with paint finish . To receive modular partition section & making pen tray cut outs as directed by architects . Glazed Glass Partition Providing & fixing glass partition of 10mm toughened glass with wooden frame work finish with melamine polish Ceiling Sqm 10.00 150
1,500
1.4
Sqm
53.12
1,500
79,680
1.5
1.6
25 of 51
Sr.No
Description Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres.
Unit
Qty
Rate
Amount
REMARKS
1.7
Fabric Panelling FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing. Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr)
Sqm
12.88
2,800
36,064
1.8
MDF Cladding for Graphics / Paint MDF PANNELING:-Providing and fixing 12mm thick. MDF fixing on existing Partition / Frame work with groove S.S profile with necessary fixing.
Sqm
23.04
775
17,856 -
1.9
Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Note: Do not include base partition & framing for quote.
Sqm
6.00
3,500
21,000
2.0
Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile.
Sqm
8.00
950
7,600
26 of 51
Sr.No
Description WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) M.D Cabin & 6 Pax Meeting Room & M.D Staff Area Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Gypsum Ceiling Grid Ceiling Screeding Screeding CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions.
Unit
Qty
Rate
Amount
REMARKS
2.1
Sqm
20.18
1,750
35,319
2.2
Sqm
3.73
1,150
4,285
K 1.1
Sqm
1.2
1.3
1.5
1.6
Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Glass Partition MODULAR PARTITION :- 10mm thk toughened glass partition with 105 / 102mm x 25 / 18mm Anodized Aluminium Frames-Providing & Fixing of Aluminium single Glazed partition Jeb/Alloy Equivalent using 105 / 102mm x 25 / 18mm thk sections with required accessories and 1 layer of 10mm toughened glass for partition. The rate to include the cost in complete Ceiling
Sqm
65.00
150
9,750
Sqm
21.76
6,500
141,440
Sqm
15.00
775
11,625
27 of 51
Sr.No
Description Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres. 12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling.
Unit
Qty
Rate
Amount
REMARKS
1.7
Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile.
Sqm
27.00
950
25,650
1.8
Fabric Panelling
Sqm
9.24
2,800
25,872
28 of 51
Sr.No
Description FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing. Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr)
Unit
Qty
Rate
Amount
REMARKS
1.9
Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Note: Do not include base partition & framing for quote.
Sqm
9.24
3,500
32,340
2.0
Designer Ceiling Providing and fixing Gypsum False in Designer Shape Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres.
Sqm
30.00
1,050
31,500
12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling. 2.1 Motorised Door Providing & fixing motorised doors of 12 mm toughened glass with Dorma fitting with sensor with release switch on both side Storages Modifications Nos 1.00 145,000
145,000 -
2.2
Sqm
7.92
7,500
59,400
29 of 51
Sr.No
Description Storage : Refurbishment of storage cabinet of with New laminate/ Back Painted Glass schemes as per architects instructions with finger groove shutter. NOTE: all hardware of ozone or equivalent. The rate to include the cost to complete the entire item. Roller Blind:-Roller Tube Control with Oglives:Roller Tube shall be of extruded Aluminium alloy 38-mm O.D with a minimum wall thickness of 1.0mm duly anodized for long life.Clutch:Clutch shall have a carbon steel spring wrapped by means of a high strength fibreglass reinforced polyester assembly to transmit motion from driving to driven members of clutch mechanism. Clutch shall operate bidirectionally with the use of an endless S.S. beaded chain. Clutch mechanism shall be crash proof, prevent slippage and shall raise and lower smoothly to any desired height. Clutch shall never need any adjustment.Idler:Idler shall be of high strength fibreglass reinforced polyster,consisting of an outside sleeve and centre shaft. Sleeve shall provide bearing surface for roller tube and rotate freely on centre shaft, providing smooth, quiet and long wearing operation. Basic Cost of Blinds -85 Rs/Per sqft including loading unloading and taxes Brackets-Insert Type-Fit with Roller Tube: Brackets shall be of made up of steel and powder coated to give lasting finish. Brackets shall ensure overhead, side or face mounting with clutch assembly on either end of the roller. Round Bottom Rail: Bottom of the blind shall be provided with aluminium tube with oglive ,powder coated in a colour matching to the fabric. The fabric shall be enclosed in the suitably created pocket along with the tube. The tube shall be closed from sides with end caps to ensure a neat look. Metal Operating Ball Chain: The Control Unit will be engraved to accommodate a Stainless Steel Ball Chain with a Ball Pitch of no lesser than 6.5mm to ensure an enduring operation along with an aesthetic value. Roller Blind's Fabric: Composition: 42% Glass fibre +58 % Vinyl on Fibreglass, Openness Factor:3%,Weight:535 G/ SQM, Thickness: .55mm,Fire Classification:M1 ,FR, B-1,care Instructions: Washable, Indoor Property: Tested for Harmful Substances WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) 2 Quite Room & 1 Nirvana Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling
Unit
Qty
Rate
Amount
REMARKS
2.3
Sqm
113.40
1,250
141,750
2.4
Sqm
23.29
1,750
40,753
2.5
Sqm
10.63
1,150
12,220
L 1.1
30 of 51
Sr.No
Description DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Gypsum Ceiling Grid Ceiling Screeding Screeding CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions.
Unit
Qty
Rate
Amount
REMARKS
1.2
1.3
1.4
Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Ceiling Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres.
Sqm
20.00
150
3,000
Sqm
15.00
775
11,625
31 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling. 1.5 Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile. 1.6 Fabric Panelling FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing.Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr) 1.7 Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects. Note: Do not include base partition & framing for quote. Glazed Partition Providing & fixing glass partition of 10mm toughened glass with wooden frame work finish with melamine polish Door Refurbishment Refurbishment of existing doors as per detailed drawings with repolishing of existing veneer in 3 coats of melamine polish both side all necessary fittings. Wooden Door Sqm 6.00 3,500 Sqm 8.00 2,800 Sqm 15.00 950
14,250
22,400
21,000
1.8
Sqm
22.00
4,650
102,300 -
1.9
Nos
1.00
12,500
12,500 -
2.0
Nos
1.00
15,500
15,500
32 of 51
Sr.No
Description Providing and fixing Single leaf Flush Door ,both side approved Laminate finish & melamine polish finish on edge with vision panel of 6mm thk glass fixed on wooden beading , shutter fixed on Wooden frame 105mm x 50mm with door jamb fitting as per detail drawing . The doors will have best quality 4 Nos 4" long SS hinges, SS finished double legged foot operated door stays, Polyvinyl door stopper fixed to skirting, SS finish 25mm die 600mm high handle (OZONE), lock, with OZONE make Concealed Door closer shall be include in the cost of door. Complete as per detail drawing .
Unit
Qty
Rate
Amount
REMARKS
2.1
Partition -Gypsum P1 FULL HEIGHT PARTITION: Providing and fixing frame of Full height 75mm thick partition with GI Framework @ 600 mm c/c both ways (Fire retardant and anti-termite treated) up to 2700 mm finish with 12 mm ply wood & above , till true ceiling finished with both side one layer of 12.5mm thk Gypsum board on either side with glass wool insulation 50 mm thick glass wool insulation of48 kg/ cum. density neatly packed in tissue bags of various sizes and shapes, bags shall be fully stitched all round with25 mm double leaf fold, sealing the glass wool fibre fully. The bags to be stuffed in the cavities of Gyp. partitions from floor up to RCC slab above, cross stitched from one side with GI frame work of partition by 24 g GI wire to keep bags in position. UP Twig/Rocklloyd make grade specified fixing to floor & RCC roof with screw i/c provisions for grooves and Fibber tape to be used for jointing and space/ cutouts for electrical sockets/switches and conduits etc. as per detail drawings and specification and as directed by Architect and duly fixed to floor/wall/RCC roof with fasteners. Member placement to be worked out as per grooves. complete as per drawing. Note : - All vertical & Horizontal edges will be covered 12mm MDF with paint finish . To receive modular partition section & making pen tray cut outs as directed by architects . Laminate Ledge Providing & fixing laminate finish ledge made out of 25mm thick plywood with necessary fitting . Repro Storage Unite Providing and fixing Repro Counter in 19mm thick Ply finished in 1.5 mm thick approved shade laminate on all external surfaces & 1mm laminate Internally, Including 25mm thick Ply Top with post formed edge, intermediate shelves in 19mm thick Double Side Laminated Ply, 100mm wide band above Top in 19mm thick Ply finished in same laminate and all the exposed edges to be finished with edge banding. Rate to include of necessary nos of locks, auto closing hinges for shutters, Slide channels for drawers, approved handles, magnetic ball-catch, Tower Bolt etc complete as directed WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film
Sqm
17.00
1,500
25,500
2.2
2.3
2.4
Sqm
21.89
1,750
38,308
2.5
Sqm
9.73
1,150
11,188
33 of 51
Sr.No
Description FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) Repro & Tea Coffee Machine Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Gypsum Ceiling Grid Ceiling Screeding Reprographic Counter Providing and fixing Repro Counter in 19mm thick Ply finished in 1.5 mm thick approved shade laminate on all external surfaces & 1mm laminate Internally, Including 25mm thick Ply Top with post formed edge, intermediate shelves in 19mm thick Double Side Laminated Ply, 100mm wide band above Top in 19mm thick Ply finished in same laminate and all the exposed edges to be finished with edge banding. Rate to include of necessary nos of locks, auto closing hinges for shutters, Slide channels for drawers, approved handles, magnetic ball-catch, Tower Bolt etc complete as directed
Unit
Qty
Rate
Amount
REMARKS
M 1.1
1.2
1.3
Over Head Storage OVER HEAD STORAGE(600MM DEEP)LAMINATE FINISH:-Providing & fixing over head Storage cabinets 600 mm deep made out of 19mm commercial board 1 mm thick laminate and balancing laminate all inside adjustable laminated shelves. Rate should be inclusive of necessary Hardware- , Lock sets, self-closing hinges, spring loaded shutter latch inside, all cabinet hardware as approved & as /Architects approval. Hardware Hettich equivalent
Sqm
5.75
7,250
41,688
1.4
Fabric Panelling FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing. Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr)
Sqm
5.00
2,800
14,000
1.5
Partition -Gypsum
Sqm
RO
1,500
34 of 51
Sr.No
Description FULL HEIGHT PARTITION: Providing and fixing frame of Full height 75mm thick partition with GI Framework @ 600 mm c/c both ways (Fire retardant and anti-termite treated) up to 2700 mm finish with 12 mm ply wood & above , till true ceiling finished with both side one layer of 12.5mm thk Gypsum board on either side with glass wool insulation 50 mm thick glass wool insulation of48 kg/ cum. density neatly packed in tissue bags of various sizes and shapes, bags shall be fully stitched all round with25 mm double leaf fold, sealing the glass wool fibre fully. The bags to be stuffed in the cavities of Gyp. partitions from floor up to RCC slab above, cross stitched from one side with GI frame work of partition by 24 g GI wire to keep bags in position. UP Twig/Rocklloyd make grade specified fixing to floor & RCC roof with screw i/c provisions for grooves and Fibber tape to be used for jointing and space/ cutouts for electrical sockets/switches and conduits etc. as per detail drawings and specification and as directed by Architect and duly fixed to floor/wall/RCC roof with fasteners. Member placement to be worked out as per grooves. complete as per drawing. Note : - All vertical & Horizontal edges will be covered 12mm MDF with paint finish . To receive modular partition section & making pen tray cut outs as directed by architects . Ceiling Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres. 12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling.
Unit
Qty
Rate
Amount
REMARKS
1.6
35 of 51
Sr.No N 1.1
Description 2 Quite Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Gypsum Ceiling Grid Ceiling Screeding Ceiling Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres. 12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling.
Unit
Qty
Rate
Amount -
REMARKS
Sqm
1.2
1.4
Sqm
3.24
950
3,078
36 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile. 1.5 Fabric Panelling FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing. Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr) 1.6 Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Note: Do not include base partition & framing for quote. 1.7 Solid Partition Providing & fixing Low height partition with 50mm x 50mm wooden / Aluminium frame work with both side 12mm ply wood skinning , finished with laminate including all necessary cut out & grooves with edge will be exposed edge will be teak wood finish in melamine polish . Glazed Partition Providing & fixing glass partition of 10mm toughened glass with wooden frame work finish with melamine polish WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) 4P Meeting Room & 6P Meeting Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling Sqm 1.80 3,750 Sqm 4.00 3,500 Sqm 3.00 2,800
8,400
14,000
6,750
1.8
Sqm
8.00
4,650
37,200 -
1.9
Sqm
7.45
1,750
13,041
2.0
Sqm
3.45
1,150
3,968
O 1.1
Sqm
37 of 51
Sr.No
Description DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Gypsum Ceiling Grid Ceiling Screeding Screeding CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions.
Unit
Qty
Rate
Amount
REMARKS
1.2
1.3
1.4
Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Ceiling Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres.
Sqm
10.00
150
1,500
Sqm
15.00
775
11,625
38 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling. 1.5 Fabric Panelling FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing. Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr) 1.6 Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Note: Do not include base partition & framing for quote. 1.7 Door Refurbishment Refurbishment of existing doors as per detailed drawings with Door bedding & modification with door fame including repolishing of existing veneer in 2 coats of melamine polish both side all necessary fittings. Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile. Nos 2.00 12,500 Sqm 6.00 3,500 Sqm 8.00 2,800
22,400
21,000
25,000
1.8
12.00
950
11,400
39 of 51
Sr.No
Description WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) 2P Quite Room , 3P Quite Room & 10P Meeting Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Gypsum Ceiling Grid Ceiling Screeding Screeding CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions.
Unit
Qty
Rate
Amount
REMARKS
1.9
Sqm
18.94
1,750
33,146
2.0
Sqm
6.90
1,150
7,935
P 1.1
Sqm
1.2
1.3
1.4
Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Ceiling
Sqm
25.00
150
3,750
Sqm
30.00
775
23,250
40 of 51
Sr.No
Description Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres. 12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling.
Unit
Qty
Rate
Amount
REMARKS
1.5
Modular Ceiling 0.5 NRC GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile.
Sqm
20.00
950
19,000
1.6
Fabric Panelling
Sqm
19.68
2,800
55,104
41 of 51
Sr.No
Description FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing. Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr)
Unit
Qty
Rate
Amount
REMARKS
1.7
Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Note: Do not include base partition & framing for quote.
Sqm
6.00
3,500
21,000
1.8
1.9
2.0
Q 1.1
Door Refurbishment Refurbishment of existing doors as per detailed drawings with repolishing of existing veneer in 3 coats of melamine polish both side all necessary fittings. WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) 2nd Floor Caf & 6 P Meeting Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing Ceiling / Partition / Floor / Panelling / Grid Ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Gypsum Ceiling Partation Screeding Screeding
Nos
4.00
12,500
50,000 -
Sqm
34.47
2,000
68,931
Sqm
14.49
1,150
16,664
Sqm
1.2
42 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions. 1.3 Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Solid Partition -gypsum P1 FULL HEIGHT PARTITION: Providing and fixing frame of Full height 75mm thick partition with GI Framework @ 600 mm c/c both ways (Fire retardant and anti-termite treated) up to 2700 mm finish with 12 mm ply wood & above , till true ceiling finished with both side one layer of 12.5mm thk Gypsum board on either side with glass wool insulation 50 mm thick glass wool insulation of48 kg/ cum. density neatly packed in tissue bags of various sizes and shapes, bags shall be fully stitched all round with25 mm double leaf fold, sealing the glass wool fibre fully. The bags to be stuffed in the cavities of Gyp. partitions from floor up to RCC slab above, cross stitched from one side with GI frame work of partition by 24 g GI wire to keep bags in position. UP Twig/Rocklloyd make grade specified fixing to floor & RCC roof with screw i/c provisions for grooves and Fibber tape to be used for jointing and space/ cutouts for electrical sockets/switches and conduits etc. as per detail drawings and specification and as directed by Architect and duly fixed to floor/wall/RCC roof with fasteners. Member placement to be worked out as per grooves. complete as per drawing. Note : - All vertical & Horizontal edges will be covered 12mm MDF with paint finish . To receive modular partition section & making pen tray cut outs as directed by architects . Glazed Partition Providing & fixing glass partition of 10mm toughened glass with wooden frame work finish with melamine polish Doors Sqm 125.00 150
18,750
1.4
Sqm
107.52
1,500
161,280
1.5
1.6
43 of 51
Sr.No
Description (900X2400):Providing and fixing Single leaf Flush Door ,both side approved Laminate finish & melamine polish finish on edge with vision panel of 6mm thk glass fixed on wooden beading , shutter fixed on teak wood frame work of "105mm x 50mm with door jamb fitting as per manufacture specification. The doors will have best quality 4 Nos 4" long SS hinges, SS finished double legged foot operated door stays, Polyvinyl door stopper fixed to skirting, SS finish 32mm die 1800mm high handle (HETTICH/OZONE) , lock, with Dorma make Concealed Door closer shall be include in the cost of door. Complete as per detail drawing .
Unit
Qty
Rate
Amount
REMARKS
1.7 1.7A
1.8
1.9 2.0
Doctor Room Door Same as above but in without vision panel Refurbishment of existing door Refurbishment of existing doors as per detailed drawings with repolishing of existing veneer in 3 coats of melamine polish both side all necessary fittings. Doctor Table Providing & fixing counter up to 500mm deep with single line drawer finished with laminate. Massage chair Working Bench BENCH SEATING (LAMINATE FINISH WITH LEATHER SEATS):Providing and fixing bench seating of width 450 mm with corner round , with laminate finish & approved leather seats. Primary structure to be in 19 mm thick block board with necessary framework and approved hardware's .External structure to be in laminate finish. Under structure under the cushion to be in laminate. Cushion to be 85 mm thick high density foam finished in leather with approved stitching. The rate to include all the cost to complete the entire item.
Nos Nos
1.00 1.00
14,500 12,500
14,500 12,500 -
Nos
1.00
12,000
12,000 -
Nos Rmt
1.00 5.00
8,500 8,500
8,500 42,500
2.1
Fabric Panelling FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing. Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr)
Sqm
10.00
2,800
28,000
2.2
Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Note: Do not include base partition & framing for quote.
Sqm
3.00
3,500
10,500
2.3
Planter Box Providing and fixing of 6mm thick laminated finish to be made in hardwood framing. The 25 mm commercial board to be fixed with 1mm thick laminate finished under structure as approved design. The rate to include the pebbles of the width of 1200 mm wide as directed by Architect
Sqm
2.00
4,750
9,500
44 of 51
Description
Unit Sqm
Qty 129.60
Rate 1,150
Amount 149,040
REMARKS
Providing and fixing Gypsum False in Designer Shape Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres.
12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling. 2.5 Caf Flooring LAMINATED WOODEN FLOORING - Providing and laying laminated wooden flooring in the form of planks of size 12 / 10mm thick, laid on IPS base with 2mm form backing including edge profile/ beading wherever required all complete as per Architects Instructions (Basic Rate 180 INR /SQ.FT) 2.6 Library Storage Providing & fixing library storage unite with laminate finish Semi Glazed Entrance Partition near caf entrance door Providing & fixing glass partition of 10mm toughened glass with wooden frame work finish with melamine polish Modular Ceiling 0.5 NRC Sqm 9.60 7,500 Sqm 125.00 2,950
368,750
72,000 -
2.8
Sqm
1.00
5,100
5,100 -
2.9
Sqm
25.00
950
23,750
45 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile. WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) 22 Pax Meeting Room & 2 P Quite Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Gypsum Ceiling Partation Screeding Screeding CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions. 1.3 Water Proofing Works Below Screeding Sqm 55.00 150 Sqm Sqm Sqm Sqm 75.00 45.00 55.00 55.00 180 225 225 425
3.0
Sqm
40.37
1,750
70,639
3.1
Sqm
3.04
1,150
3,491
R 1.1
Sqm
1.2
8,250
46 of 51
Sr.No
Description WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Sliding Folding Partition SLIDING FOLDING PARTITION (MALROX MAKE) :-Supply, fabrication and installing exclusive extruded aluminium top track for holding the partition panels; with necessary rectangular / flat sandwich plates as required, with special extruded aluminium profiles on both ends; with stiffeners (horizontal) so as to form a rigid non-deflecting framework duly fitted with extending rubber gaskets (seal) at the top & at the bottom level; filling the framework with fibre glass. Each framework will be fitted with a SHEET OF TECH-SOUND 50 and finally laid on with DECOBOARD (12mm) Panels and supplied in a LAMINATE FINISHED CONDITION.
Unit
Qty
Rate
Amount
REMARKS
1.4
Sqm
20.00
27,000
540,000
1.5
Fabric Panelling FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing. Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr)
Sqm
10.00
2,800
28,000
1.6
Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects Including the cost of 15mm x 15mm x 3mm SS Channel & 18mm Revel. Note: Do not include base partition & framing for quote.
Sqm
2.00
3,500
7,000
1.7
1.8
1.9
Glazed Partition Providing & fixing glass partition of 10mm toughened glass with wooden frame work finish with melamine polish Door Refurbishment Refurbishment of existing doors as per detailed drawings with repolishing of existing veneer in 3 coats of melamine polish both side all necessary fittings. Console Unit Providing & fixing console unite of 450mm deep finish with laminate including all necessary hardware
Sqm
17.40
4,650
80,910 -
Nos
3.00
12,500
37,500 -
Rmt
5.40
7,500
40,500 -
47 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
2.0
Roller Blind:-Roller Tube Control with Oglives:Roller Tube shall be of extruded Aluminium alloy 38-mm O.D with a minimum wall thickness of 1.0mm duly anodized for long life.Clutch:Clutch shall have a carbon steel spring wrapped by means of a high strength fibreglass reinforced polyester assembly to transmit motion from driving to driven members of clutch mechanism. Clutch shall operate bidirectionally with the use of an endless S.S. beaded chain. Clutch mechanism shall be crash proof, prevent slippage and shall raise and lower smoothly to any desired height. Clutch shall never need any adjustment.Idler:Idler shall be of high strength fibreglass reinforced polyster,consisting of an outside sleeve and centre shaft. Sleeve shall provide bearing surface for roller tube and rotate freely on centre shaft, providing smooth, quiet and long wearing operation. Brackets-Insert Type-Fit with Roller Tube: Brackets shall be of made up of steel and powder coated to give lasting finish. Brackets shall ensure overhead, side or face mounting with clutch assembly on either end of the roller. Round Bottom Rail: Bottom of the blind shall be provided with aluminium tube with oglive ,powder coated in a colour matching to the fabric. The fabric shall be enclosed in the suitably created pocket along with the tube. The tube shall be closed from sides with end caps to ensure a neat look. Metal Operating Ball Chain: The Control Unit will be engraved to accommodate a Stainless Steel Ball Chain with a Ball Pitch of no lesser than 6.5mm to ensure an enduring operation along with an aesthetic value. Roller Blind's Fabric: Composition: 100% balck out
Sqm
27.00
1,250
33,750
S 1.1
4P,3P & 6P Meeting Room Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Gypsum Ceiling Partation Screeding Screeding
Sqm
1.2
48 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions. 1.3 Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Ceiling Providing and fixing Gypsum False Ceiling of India Gypsum / La gyp make which includes G.I. Perimeter Channels of size 0.55 mm thick ( having One Flange of 20 mm. and another flange of 30 mm and a web of 27 mm ) along with perimeter of ceiling, screw fixed to brick wall / partition with the help of Nylon sleeves and screws at 610mm centres. Then suspending G.I. intermediate channels of size 45mm (0.9mm thick with 2 flanges of 15 mm each) from the soffit at 1220 mm centres with ceiling angle of width 25 mm X 10 mm X 0.55 mm thick fixed to soffit with G.I. cleat and steel expansion fasteners. Ceiling section of 0.55mm thick having knurled web of 51.5 mm and 2 flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with the help of connecting clips and in direction perpendicular to the intermediate channel at 450 mm centres. 12.5mm tapered edge Gypboard (conforming to IS 2095-1982) is then screw fixed to ceiling section with 25mm dry wall Philips screws at 230mm centres. Screw fixing is done mechanically with drilling machine with suitable attachment. Finally tapered edges of the Gyp boards are to be jointed and finished so as to have a flush look which includes filling and finishing with jointing compound, paper tape etc complete as per the ASSESSMENT practices of India Gypsum. Rate to be included all kinds of profiles and cut outs required for light fixtures, Speakers, Smoke detector, trap doors and AC grill in the ceiling. The rate shall be inclusive of Vertical Patties provided for fixing the gypsum ceiling & also wherever height difference is there in ceiling. 1.5 Modular Ceiling 0.5 NRC Sqm 20.00 950 Sqm 55.00 150
8,250
1.4
Sqm
15.00
775
11,625
19,000
49 of 51
Sr.No
Description
Unit
Qty
Rate
Amount
REMARKS
GRID TILE CEILING: Providing & Fixing of Armstrong Mineral Fibber Acoustical Suspended Ceiling System with regular edge tiles should have Humidity Resistance (RH) of 99%, NRC as mention below, Light Reflectance >85%, Thermal Conductivity k = 0.052- 0.057 w/m K, Colour White, Fire Performance Class 0/Class1 (BS 476 Part 6&7) in module size of 600 X 600 X 16 mm with Bio Block coating on the face of the tile, suitable for Green Building application, with Recycled content of 63%.The grid should be of Armstrong make with silhouette with black groove - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees . The T Sections have a Galvanizing of 120 grams per M2 & passed through 500 hrs of Salt test.The Tile & Grid system used together should carry a 15 year warrantee. Including Shadow line profile. 1.6 Fabric Panelling FABRIC PANELING: Providing and fixing fabric panelling fixed with fabric wrapped over UPVC Wall tracts Gripper Pro stretch system with 12mm thick MDF board with 3mm cushion backing fixed to the hard wood framing / 12mm ply wood including all hardware, fire retardant paint etc complete as per design and drawing. Rate inclusive of gripper (Basic Rate of fabric to be taken as RS. 450 Sq.mtr) 1.7 Glass Panelling GLASS PANELLING :- Providing and fixing 6mm thick Saint Gobin Planilaque white glass fixed with 3M double sided foam tapes on 9 plywood backing with laminated strips as per instruction of architects . Note: Do not include base partition & framing for quote. Door Refurbishment Refurbishment of existing doors as per detailed drawings with repolishing of existing veneer in 3 coats of melamine polish both side all necessary fittings. WALL PAPER :-Providing and fixing wall paper (Vinyl wall covering) of approved make, on POP/ Gypboard surfaces with suitable adhesive as per manufacturers specification.(Basic Rate of the material to be taken as Rs. 150 / Sqft) Frost Film FROSTED FILM (CRYSTAL QUALITY):- Providing and fixing 3M / Avery / Birla scotchcal over glass surface as approval of the Architect. (Height up to 1200 , Only film surface area shall be measured and paid) Staff Area Demolitions Ceiling / Partition / Floor / Panelling / Grid Ceiling DEMOLITION OF EXISTING CEILING: Demolition of Existing ceiling including all framework and sheet and disposal of unserviceable material as directed to municipal dumping ground. Rate should include safety precaution/measures taken to other Lighting /AC/ or any other related fixtures while carrying out the activites.Complete with all respect as per Architect Instructions. Gypsum Ceiling Partation Sqm Sqm 75.00 75.00 180 225 Sqm 7.00 3,500 Sqm 17.00 2,800
47,600
24,500
1.8
Nos
4.00
12,500
50,000 -
1.9
Sqm
29.81
2,000
59,616
1.10
Sqm
13.25
1,150
15,235
Sqm
1.1
13,500 16,875
50 of 51
Sr.No
Description Screeding Screeding & Raceway Filling due to orientation changes CEMENT CONCRETE SCREEDING:-Providing and laying cement concrete for flooring to a maximum 75mm TO 100mm thick using cement concrete 1:2:4 (1cement :2Coarse sand :4graded stone aggregate 20mm and down gauge) for flooring bands and other similar locations, tamped, spaded, toweled and top finished neat, smooth with floating coat of cement as directed laid in alternate panels of area not more than 2 sqm and laid to water levels or proper slopes as directed with necessary shuttering, hacking the existing surface, curing etc. specifications. Rate are inclusive of Junction box frame work & installation. Complete with all respect as per detail drawing & Architect Instructions.
REMARKS
1.2
1.3
1.4
1.5
Water Proofing Works Below Screeding WATERPROOFING WORKS :- Providing and applying water proofing coats slurry into existing slab . Providing, supplying, mixing and applying cement coats with water proofing compound of sunanda / Roff make flexible water-proofing slurry to a thickness of 1mm over the bottom , including preparation of surface, finishing, curing etc. all complete at different levels as specified by the Architect as per manufacturer's specifications and as directed. Paintings :- Walls & Ceiling PLASTIC EMULTION PAINT:- Providing and applying on Gypsum Ceiling including surface preparation, primer coats, levelling Patti and minimum 3 coats of brush and roller finish. Storage STORAGE(600MM DEEP)LAMINATE FINISH:Providing & fixing over head Storage cabinets 600 mm deep made out of 19mm commercial board 1 mm thick laminate and balancing laminate all inside adjustable laminated shelves. Rate should be inclusive of necessary Hardware- , Lock sets, selfclosing hinges, spring loaded shutter latch inside, all cabinet hardware as approved & as /Architects approval. Hardware - Hettich equivalent
Sqm
200.00
150
30,000
Sqm
5,000.00
200
1,000,000 -
Sqm
110.00
7,500
825,000
1.6
Quiet Room Ledge Providing & fixing laminate finish ledge made out of 25mm thick plywood with necessary fitting . 50mm Axiom Profile for Meeting Room Ceiling 65mm single side gypsum Partition for Barricading workspace. Removing of existing Carpet Dismantling of existing Furniture Like , Meeting Table , Cabinet , Loose furniture Temporary door Truck Load for rabit shifting TOTAL AMOUNT OF CIVIL & JOINERY
Rmt
RO
4,250 -
550 550 52
10.00 40.00
3,500 3,500