LBE-for Equipment
LBE-for Equipment
LBE-for Equipment
684
684
03/Feb/'14
TDI
VIOLATION
MECHL
PAINTING
Arthur
Fernandez
DuringfieldsurveillanceinsideCON4903,ithadbeennoticedthatthereiscorrosion@soiltoairinterface
insidelowestlevelwhererainwatersettles.Itisstartingtodamagethecoatingandeminenttopenetrateon
shellbottombasemetal,ifnotrectified.ThisviolatesRT61CS,item2.4.1andneedstoberectifiedASAP.
TCC
CONSTRUCTIO
N
03/Feb/'14
A.Khaliq
30/Dec/'14
DSAinformedtoTCCthatsoilmustbereplacedimmediately
andrepairthecoatingifanydamage.
TCC
CONSTRUCTIO
N
05/Apr/'14
Josillito
Lluisma
30/Aug/'14
ContractorTCCwereinformedregardingthisvoilationand
advisetocoverincompliancetocompanystandardrequirment
within72hrs.
TCC
CONSTRUCTIO
N
21/May/'14
Josillito
Lluisma
30/Sep/'14
TCCCONTRACTORWERENOTIFIEDTHISVIOLATIONFOR
PROPERHANDLING,STORAGE&PRESERVATIONOF
MATERIALS.
TCC
CONSTRUCTIO
N
18/Jun/'14
M.
Rayeesuddin
30/Sep/'14
ThesubjectnonconfirmityhasbeeninformedtoTCCQC
supervisor.Cleaning&Visualexaminationshallbeperformed
beforegalvanizing/painting.
TCC
CONSTRUCTIO
N
15/Aug/'14
Josillito
Lluisma
30/Sep/'14
SAMEISSUEPERLBE962.COMPANYNCRISSUED320080614
01PERTRANSMITTALNO:320TCJDJQC071DATED10.08.14
TCC
CONSTRUCTIO
N
21/Aug/'14
Josillito
Lluisma
15/Sep/'14
ContractorTCCprovideadequatetemporarysupport&
uncoupleequipmentsuction/dischargenozzlewithpiping.
SubjectAirCoolerFansNotCoveredwithPlasticorCanvas
772
772
05/Apr/'14
PMDI
VIOLATION
MECHL
EQUIPT
Nelson
DuringSurveillanceforMaterialandEquipmentProtectionandPreservationPlan,itwasobservedthatthe
installedAirFancoolerswerenotcoveredwithplasticorcanvaswhichisrequiredperpara.2.17.6ofRT61CS
whichstate"CarbonSteelTUbeswithextrudedfinsshouldhavetheexposedendssprayedwithoileverythree
monthsandthetubebundleshouldbecoverdwithplasticorcanvas".
Subject:StackingofHotdipGalvanisedstructuralpipeandStructuralsteelmembers
854
854
22/May/'14
TDI
VIOLATION
MECHL
STRUCTL
Peer
Mohammed
DuringsurveillanceatTDIareaitwasnoticedthatthehotdipgalvanizedstructuralpipesupportsandother
structuralsteelmemberswerenotstored/handledproperly,thisconditionwasnoticedeverywhereinTDIarea.
Thisisaviolationtocompanyspecifications.Contractorisadvisedtotakeimmediatecorrectiveactionon
STORAGEandHANDLINGtoavoidanyreccurence.
Subject:WeldingSlag,spatter,sharpburrsandmissedcoatingobservedinGalvaniseditems.
TCCPaintShopCoatedSpoolsstoragearea.
889
889
09/Jun/'14
TDI
VIOLATION
MECHL
PAINTING
Peer
Mohammed
Duringsurveillance/RFIatTCCcoatedspoolsstackingareitwasnoticedthatthegalvanizesteelsupport
membersandmiscellaneousitemsshowsthesignageofmissedcoatinginsomeitemsandalsowelding
slag/spattersandsharpconcernsarenotproperlygoundpriortogalvanizing.this.Conttractorisadvisedto
verifyandimplementnecessaycorrectiveaction.
Reference:RT2S512001PARA.3.5.5/ASTMA123PARA.6.2/ScheduleQattachmentIVPara.6
EQUIPMENTFieldInstallationofCentrifugalBlower
PerRFI#SIPTCCME2946&2947forCentrifugalBlower340B7951A&BatPMDIArea,Ithasbeenobserved
thatContractorTCCcarriedoutinstallation,dissemblingandreassemblingofcentrifugalBlowerwithoutthe
presenceofvendorrepresentative.
983
983
14/Aug/'14
PMDI
VIOLATION
MECHL
EQUIPMENT
Mumtaz
ThisviuolatesScheduleQAttachmentIVsectionpara1.1.SIITPK40201Rev5toreviseandincorporate
requirementsperA554KPRGCMGENDON005Rev1Attachment3forVendorSupportasaminimum
requirementrequiredduringerection.
320P3120and320P3110OnCentrifugalPumpsSuctionanddischargeNozzlepipingconnectedwithoutFinal
alignmenthasbeencompleted,Witnessed,andapprovedbyOwner
DuringSurveillanceinspectionondated20Aug2014wasobservedin320P3120and320P3110Centrifugal
Pump,Pipindalreadyconnectedtothepumps,pipingworksandfinalfieldweldingwerenotcompleted.Which
areViolatesto
1RT5S532102pare2.2.Pipingshallnotbeattacheduntilrotatingequipmentfinalalignmenthasbeen
completed,witnessedandapprovedbyOwner.
992
992
20/Aug/'14
TDI
VIOLATION
MECHL
EQUIPT
JAYANTI
2API686Para4.1.2Unsupportedpipingshallnotbeinstalledonthemachinery.Pipinghangersandsupports
shallbeinstalledasSpecifiedbydesigntominimizepipingappliedstrainonthemachinery.Thecasualaddition
ordeletionofpipingsupportsduringfieldconstructioncanresultinpipingstressesnotanticipatedbythe
pipingdesignerandisprohibited.
3API686para4.4finalfieldweldinghavecompletedStraycurrentsfromweldingorelectricalheatingstress
releivingcancausedamagetoseals,bearingsandothermachinerycomponents.StrayelectricalCurrentscan
bealsomagnetizemachinerycomponentsthatcanlatergeneratedamagingcurrents.ContractorSupervisor
andQCwereinformed.
Subject:TCCHVACInspector(320and340)
1002
1002
27/Aug/'14
TDI
VIOLATION
MECHL
HVAC
ContractorTCCfortheinstallationofHVACsystemforcontainmentdomesinUnit320and340hasyetnot
assignedapprovedHVACInspectortocoverinspectionrelatedactivities.
TCC
CONSTRUCTIO
N
27/Aug/'14
Josillito
Lluisma
SubcontractorTCCwerenotified&willprovideHVACinspector
tocoverbothTDI&PMDIcompliancetoScheduleQ.
PDYBARLY
LBEfor3204911A/B(CentrifugalBlower)TDIAreaEl.+15100
CHEMIIISOCYANATES,TDI/PMDI,DuringfieldinspectionforRFI#SIPTCCME3116
&RFI#SIPTCCME3117noticesomeoftheanchorboltsinstalledandgroutedintherespectivepocketsare
outofcenterfromthepocketholesaswellassomeboltsareinstalledinoffsetpositionornotstraightasper
GADrawing(MJ6T16B49113205069001)andRT2G307009.ThisisaviolationtoGAdrawing
requirementsaswellastoDOWstandard(RT2G307009).Anotherobservationnoticedwastheincomplete
chippingofthetopsurfaceoftheconcretefoundationattheedgeportion.Contractorisexpectedtotake
correctiveactiontoimplementandcomplywiththeconstructionrequirementsasperdesign.Inform
contractorandsubcontractorinspectorsoftheinstallationdiscrepancies.(PDYBARLY/BASHWORTH)
TCC
CONSTRUCTIO
N
22/Sep/'14
Masoom
Ghole
DSAwillrectifytheissue.
PDYBARLY
LBEforREJECTEDRFI#SIPTCCPA1441CHEMII
ISOCYANATES,TDIArea320,Duringinspectionnoticethattheitemtobeinspectedwasastructural
modificationforextendingthelengthofthestructuralsupportbeamforpiping.Asperreferencetothe
attachedconstructiondrawingitwasstillrev.o,butdidnotshowacloudforthechangestobemadeandonly
anextensionofthebeamwasshownfortheextension.Itwasnotclearforthepurposeorextensionaswellas
fortopweldsurfaceintheflangewasgoingtobeflushgrindpriortopainting.Contractorwasinformedto
provideandattachproperdocumentsandchangetheRFIdescriptiontoindicatestructuralmodificationand
makeclearoftheweldingrequirementseithertoflushgrindpriortopaintingthetopflangesurfaceweld.(PD
YBARLY/BASHWORTH)
TCC
CONSTRUCTIO
N
28.09.14
Josillito
Lluisma
DSAEngineeeringwillproviderevisedrawingwiththe
correspondingdetailchangesweremade.
Jessie
Candillario
ComplianceperScheduleQAttchmentVISection1Para1.1
1062
1063
1062
1063
22.10.14
22.10.14
TDI
TDI/PMDI
PAN
PAN
MECHL
MECHL
EQUIPT
PAINTING
Subject:Strucutral/Restingtypesupportpaintclarificationrequired
1094
1094
07/Oct/'14
TDI
PAN
MECHL
STRUCTL
Peer
Mohammed
DuringRFI/surveillanceitwasnoticedmanyofthestructural/restingtypesupportswaspaintedand
contractorfailedtoprovidedocumentshowingpaintsystemforthosesupports,Contractorisadvisedto
provideclarificationonpaintforthoseitems.Formorethan1monthnoanyactionfromsubcon/contractor
onthisissue.
TCC
CONSTRUCTIO
N
08/Oct/'14
Josillito
Lluisma
SubcontractorTCCwereadvisetoclarificationforthoseresting
typesupportbeingpainted&tobepresentedtocompany.
TCC
CONSTRUCTIO
N
13.10.14
Josillito
Lluisma
TCCtoprovideallnecessarydocumentsrequired.
TCC
CONSTRUCTIO
N
22.10.14
Josillito
Lluisma
DSAQCwillcoordinatethisissuewithelectricalQCfor
structuraltocomplete/raiseRFIforbolttighteningasperITP.
TCC
CONSTRUCTIO
N
24.10.14
Josillito
Lluisma
ThisissuewerebroughttotheattentionofcivilQCDept.&
discussionweremade@Mr.BrianOFFICE(UL)toresolvethis
issue.DSAwillprovidethereqd.documents.
TCC
CONSTRUCTIO
N
29.10.14
Josillito
Lluisma
TCC/DSAWILLCOMPLY
Subject:GARNETMaterialReceivingInspection
1103
1103
12.10.14
TDI
VIOLATION
MECHL
PAINTING
Peer
Mohammed
DuringMaterialReceivingInspectionofAbrassivematerialatTCCLaydownpaintyarditwasnoticedthatthe
freesilicacontentvaluenotmentionedinthetestcertificateandalsothevaluesofchloridecontentismore
thanacceptablelimit.Contractorisadvisedtoclarifyonthisandtakenecessarycorrectiveaction.RFI#SIPTCC
MRPA1702.
SUBJECT:Erectionofcabletrayandsupport
1117
1119
1117
1119
21.10.14
23.10.14
TDI
PMDI
VIOLATION
VIOLATION
MECHL
MECHL
EQUIPT
EQUIPT
ARCHE
Mumtaz
1130
1130
28.10.14
PMDI
VIOLATION
MECHL
EQUIPT
Mumtaz
1131
1131
28.10.14
PMDI
VIOLATION
MECHL
EQUIPT
Mumtaz
Refernce:ITPSIITPD00101Rev.9Discription:DuringSurveillanceInspectionwas
conductedonequipment(320D4005)ANTIOXIDANTDRUM,Itwasnoticedthatcabletrayandtheirsupport
waserectedwithoutpriorinspectionofplatformweretheScheduleQisnotcomplied.
DuringInspectionperRFI#SIPTCCME3480,3523,3524,3525,3526&3527for340P7843ACHILLED
WATERRECIRCULATIONPUMP,DVS34002&03FireFighteningDelugeValveSkid&PU7166CoolingWaterat
PMDIarea,thefollowingdiscrepancieswasobserved:ContractorsubmittheRFIforPreInstallation
inspectionwithoutfoundationreleasefromCIVILforP7843A&PU
7166.ContractorsubmittheRFIforInstallation,
Levelling,alignmentinspectionandSkidhasbeeninstalledwithoutfoundationreleasefromCIVILforDVS340
02&03.ContractorsubmittheRFI
forInstalledAnchor/SettingboltsfinaltighteninginspectionwithoutMRIofboltsforDVS34002&
03.This
violatesSCHED.QPara.1.6,3.7states:Contractormustperforminspectionandtestsinaccordancewiththe
approvedITP.
Subject:VendorRepresentativeDuringsurveillanceinspectionatPMDI
Area,ithasbeenobservedthatthecontractorhasinstalledtheequipment340ARU75001&75002
AbsorptionRefrigerationUnitatsitewithoutthepresenceofvendor
representative.
Compliancepercontractno.6600027485ScheduleBAttachmentIX,ContractorshallensurethatVendor
representativesarepresentforinstallation&erection.
Subject:EQUIPMENTINTERNALCOMPONENTSInstallationDuring
inspectionperRFI#SIPTCCME3544FORTRAYS&INTERNALCOMPONENTSInstallationofT7181,BRINE
STRIPPERatPMDIArea,ithasbeenobservedthatthecontractorhasinstalledtheTRAYS&COMPONENTS
InsideT7181withoutpreinstallationinspection.ThisviolatesScheduleQpARA3.7&3.6WHICH
STATES