Proforma For Maintaining Record of Conducting Departmental Auction
Proforma For Maintaining Record of Conducting Departmental Auction
Proforma For Maintaining Record of Conducting Departmental Auction
Sub Division :
Name & Address of the Bidder
weight or
quantity
Auction
02.12.2013
1 no.
Reserve price
Amount of Bid
Sl. No.
Date of
Auction
Reserve price
Amount of Bid
CESD 1/ III
Amount deposited by bidder
Remarks
Remarks
Revised measurements
Demolishing brick work manually/ by mechanical means including stacking of serviceable mate
unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar
Glass house-E-bldg
Above lintel- long walls
short walls
av. Ht= 1/2 x (0.35 + 1.45) = 0.90 m
2
2
1
1
18.80
6.45
0.25
0.25
2
2
1
1
6.62
3.50
0.25
0.25
short walls
Contractor
Junior Engineer
Assistant Engineer
10
10(a)
10(b)
4
1
4
2
2
2
3
2
2
1
1
1
1
1
1.00
2.00
16.10
16.55
6.65
0.25
0.25
0.12
0.12
0.12
4.15
0.60
1.20
9.10
4.15
0.12
0.15
0.12
0.25
0.25
1
1
1
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, arc
complete and stacking within 50 metres lead :
Of area 3 sq. metres and below
Of area beyond 3 sq. metres
Glass house-E-bldg
windows (2.70 x 1.50 m)
-Do- (2.70 x 1.10 m)
-Do- (2.15 x 1.50 m)
Composite section (2.15 x 1.50 m)
steel door- F bldg (2.15 x 2.10 m)
1
11
1
2
1
1
1
1
1
1
1
1
Total
11
Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height
material within50 metres lead:
Of sectional area below 40 square centimetres.
Glass house-E-bldg
1
1
3
3
Partition frames
-Do-Do-Do-
14
1
1
1
2
2.70
4.50
6.00
1.00
1.50
1.50
2.00
0.90
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 me
Asbestos sheet
-Do-
Contractor
Junior Engineer
1
1
2
1
3.55
2.50
19.20
3.70
Assistant Engineer
Contractor
Junior Engineer
Assistant Engineer
15
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serv
disposal of unserviceable materials within 50 metres lead.
Glass house-E-bldg
partitions
-Do-Do-
3
1
1
1
1
1
6.45
2.70
4.50
0.55
1.10
1.10
Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including dispo
surplus material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-ch
Glazing area
Glass house-E-bldg
windows (2.70 x 1.50 m)
-Do- (2.70 x 1.10 m)
-Do- (2.15 x 1.50 m)
Composite section (2.15 x 1.50 m)
11
1
4
1
1
1
2.70
2.70
2.15
1.50
1.10
1.50
2.15
1.50
Contractor
Junior Engineer
Assistant Engineer
say
sqm
0.50
0.90
4.7
2.9
2.70
3.15
8.94
5.51
Contractor
Junior Engineer
Assistant Engineer
1.20
2.10
0.50
0.50
0.50
-1.20
-1.05
3.86
1.99
0.80
3.30
0.70
2.50
0.40
0.40
3.29
0.57
0.72
1.82
0.42
33.27
34.00
say
cum
1
11
1
2
1
1
17
Nos
4.05
6.75
36.00
5.40
52.20
53.00
say
sqm
136.32
9.25
145.57
Contractor
Junior Engineer
Assistant Engineer
say
146.00
sqm
Contractor
Junior Engineer
Assistant Engineer
10.64
2.97
4.95
18.56
19.00
say
sqm
44.55
2.97
12.90
3.23
63.65
-6.37
57.28
58.00
say
sqm
Contractor
Junior Engineer