This document provides instructions for modeling a prestressed concrete bridge in midas Civil. It describes how to define materials, sections, time-dependent properties, create the geometry including tapering sections and assigning groups, apply boundary conditions including supports and links, and define loading cases and apply self-weight, surfacing, form traveler and wet concrete loads. The overview is provided in 11 steps with accompanying screenshots to illustrate each step of the process.

Uploaded by

Arnel Kirk
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views

B2B Tutorial

This document provides instructions for modeling a prestressed concrete bridge in midas Civil. It describes how to define materials, sections, time-dependent properties, create the geometry including tapering sections and assigning groups, apply boundary conditions including supports and links, and define loading cases and apply self-weight, surfacing, form traveler and wet concrete loads. The overview is provided in 11 steps with accompanying screenshots to illustrate each step of the process.

Uploaded by

Arnel Kirk
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 71

midas Civil Tutorial 2

Prestressed Concrete Bridge

Bridging Your Innovations to Realities

midas Civil

Contents

1. Project Information
2. Definition of materials
3. Definition of Sections
4. Definition of Time dependent Materials
5. Creating the geometry

6. Boundary Conditions
7. Loads
8. Moving Load

9. Construction Stage Analysis


10. Results

midas Civil

1. Project Information

Perspective view
63m

16m

midas Civil

2. Definition of materials
In midas Civil materials can be added at any point in time as well as through different commands. However the most
commonly used is : Properties -> Material Properties -> Material (tab)

midas Civil

2. Definition of materials
Here, by pressing ADD a new dialog box pops up. Fill this in as shown below:

midas Civil

2. Definition of materials

After pressing apply this material will appear in the list for materials and you can add in the next one for the steel tendons
as shown below:

Material ID

Name

Type

C50/60

Concrete

Y_1670S7(15.2mm)

Steel

midas Civil

3. Definition of Sections
Now that the materials are defined, the sections will be defined in the next step. This can be done in the Section
tab by pressing Add and selecting the PSC tab. Here fill in the dialog box as shown below:

midas Civil

3. Definition of Sections

Similarly for the shallow section:

midas Civil

3. Definition of Sections

For the pier section go to the DB/User tab, fill in the data as shown below and press OK:
Works Tree
3

midas Civil

4. Definition of Time dependent Materials

10

Time dependent material effects can be defined from the Time Dependent Material tab:

1) First defining creep and shrinkage:

50,000

By clicking on show results, you can check the creep coefficient and
shrinkage strain graphs as shown below:

midas Civil

4. Definition of Time dependent Materials

11

midas Civil

4. Definition of Time dependent Materials

The variation of compressive strength will be defined as shown below :

12

midas Civil

4. Definition of Time dependent Materials

Now, in order to connect these properties to our material, a Material link will be generated as
shown below:

13

midas Civil

4. Definition of Time dependent Materials

Goto Analysis > Construction Stage to check on Initial Tangent Displacement for Erected Structures

14

midas Civil

5. Creating the geometry

15

First create a node, this you can do from: Node/Element ->Create Nodes

Fill in the pop up dialog box as shown below:

In order to create the deck, this node will be extruded into line elements.
Using the select single tool, select the node by drawing a box around it.

midas Civil

5. Creating the geometry

16

Next in order to obtain the line elements, the extrude feature shall be used from
Node/Element -> Extrude:
To obtain an appropriate mesh for the 63m deck this will be
broken down into 3m long elements. In order to obtain this, fill
in the dialog box as shown below:

By pressing apply the following can be seen


Zoom fit can be done by pressing
:

icon

midas Civil

5. Creating the geometry


Now, to create the pier at mid point, select the middle element and divide this in two. You can select the middle element by ID
from the Element Selection box. This can be done from : Node/Element -> Divide

Then simply fill in the dialog box as shown below (it has these options by default so you only need to press apply)

The Span has 21 elements and you can choose element number 11 to divide.

17

midas Civil

5. Creating the geometry

As a result this will change to:

This node will be copied down by 6.5m (which is the depth of the diaphragm). First select the node using the
select single option then go to: Node/Element -> Translate (within the node tab NOT elements)

18

midas Civil

5. Creating the geometry

And fill in the dialog box as shown below:

Once the node is created in order to obtain the pier, this will be extruded by 16m using element lengths of 2 m.

19

midas Civil

5. Creating the geometry

20

Select the node, go to: Node/Element -> Extrude Elements and fill in the dialog box as shown below:

Change section type to 3: Pier

midas Civil

5. Creating the geometry - Tapering of sections

In order to taper this bridge 2 tapered sections will be created. This can be done from
Properties -> Section Properties -> Add -> Tapered Tab

For the left side of the


taper import the 'span'
section for 'Size-i'

21

midas Civil

5. Creating the geometry - Tapering of sections

22

Scroll down and import 'diaphragm' for 'Size-j'


then finally change the offset to Centre-Top by clicking on Change Offset... as shown below

Similarly create taper right, however in this case 'Size-i' will be the Diaphragm section and 'Size-j' the
Span section.

midas Civil

5. Creating the geometry - Tapering of sections

Once you have these two sections, turn on the element number and select elements 1 to 10 by
putting this into the select elements window as shown below:

For these selected elements just simply drag and drop Left taper from the works tree. This will
taper your elements one by one.

23

midas Civil

5. Creating the geometry - Tapering of sections

24

However to create a continuous tapering, select the elements 1 to 10, for which a tapered group will
be created. Go to Properties -> Tapered Group

In the pop up dialog box just simply add in a name and press add as shown below:
Once this is done the tapering will be finished

midas Civil

5. Creating the geometry - Tapering of sections

Now repeat the same procedure on the right hand side for elements 12 to 21 and naming the group
Right taper. Once tapering is done on both sides this is what the bridge will look like:

As we do not need the element numbers anymore, this can be deactivated

25

midas Civil

5. Creating the geometry - Groups

26

There are various groups in midas Civil these include: Structural, Boundary, Load and Tendon Groups

To ease our work or for the purpose of construction stage analysis we need to create groups
These groups can be found under the groups tab in the Tree menu.

Right click on Structure Group and click on New...

midas Civil
27

5. Creating the geometry - Groups


Add in Deck with specifying 1 to 4 suffixes:

Similarly the Boundary and


Load groups can be created
so to obtain the following
groups:

Then add in Pier as the last group without specifying any suffixes:

midas Civil

5. Creating the geometry - Groups

Assigning elements to structure groups


Select elements 7to15 22, in other words the diaphragm and 4 segments on each side:

For these elements simply drag and drop Deck 1, you will see these elements being assigned to this
group :

28

midas Civil

5. Creating the geometry - Groups

Similarly the next two segments on each side will be added to Deck2 :

The same procedure is repeated for the other four segments, they are added in 2 by 2 into Deck3
and Deck4.

29

midas Civil

5. Creating the geometry - Groups

Finally the pier elements are added to the Pier structural group (to select these elements you can
simply double click on the Pier section from the works tree and all the elements which have the Pier
section assigned to them, will be selected)

Once the pier is added to the structure group, you have completed Structure Group:
At this point you should have a model equivalent to:
1 - Groups Created

30

midas Civil

6. Boundary conditions

To provide stability for our structure and to represent the actual conditions in which this is, we need
to provide boundary conditions.
Supports
For the definition of Side Support select the two end nodes of the deck. To make this selection
easier, turn off the hidden view:

31

midas Civil

6. Boundary conditions

32

Select the two end nodes and go to: Boundary -> Define Supports and fill in the dialog box as shown

Press apply and the following can be seen:

midas Civil

6. Boundary conditions

33

Similarly the Pier Support is defined. For this select the node at the bottom of the pier and fill in the
boundary dialog box as shown below:

Press apply and the following can be seen:

midas Civil

6. Boundary conditions

34

Links
To provide connectivity between the deck and the pier in the rigid zone a link needs to be created
between the node at the top of the pier and mid point. For this go to Boundary -> Elastic Link, change
the link type to Rigid
Scroll down and click on '2 Nodes'. Now select
the two nodes (top of pier and mid point of deck)

midas Civil

7. Loading

In midas Civil, loading works the following way:


1) Load cases are defined
2) Loads are assigned to these load cases

Definition of load cases


Go to Load -> Static Load Cases, here you can define all your load cases by defining their name,
type and then pressing add:

35

midas Civil

7. Loading

36

In the same manner the following load cases are added in:
Make sure all load types are Construction Stage Load

At this point you should have a model


equivalent to:
2 Boundaries and Load Cases

midas Civil

7. Loading

37

Self Weight
Go to Load -> Self Weight and fill in the pop up dialog box:

By pressing add, the self weight will


appear in the window as shown below:

midas Civil

7. Loading

38

Surfacing
For defining the surfacing load select the main deck and apply a Beam Element Load. For this go to:
Load -> Element Beam Load as shown below:
1.
2.
3.
4.

Select all the elements for Deck


Load case/group name : Surfacing
Enter a value of -5 in the Global Z direction
Press apply

midas Civil

7. Loading

To clear the screen press initial view on the right side of the screen

Form traveller and wet concrete load


These two can be defined the same way by using nodal loads. Starting with
the wet concrete loading, go to Load -> Nodal Loads

39

midas Civil

7. Loading

40

First select the node and then in the dialog box select the load case, load group name and fill in as
shown below:

By pressing 'apply' the Force and the Moment will


be applied to the node. Using this procedure all
wet concrete and form traveller loads can be
applied. However these loads can be input into
excel and applied to the model from there.

midas Civil

7. Loading

Here you can see the above loading after the dialog box was closed:

The values for this can be displayed by right clicking on the load and press display:

This can also be checked in a tabular format as well

41

midas Civil

7. Loading

42

Using this table, the loads, moments and groups can be defined for each node as shown in the Excel
table below:
First, delete the loading you have
defined for node 7, and then by
copying this table from Excel into the
Nodal loads table the following can
be seen:

midas Civil

7. Loading

Looking in the works tree, the Form traveller loads and Wet concrete loads are all defined:

At this point you should have a model equivalent to: 3 - Loads - No Prestress Loads Added

43

midas Civil

7. Loading

44

Tendons and prestress


When it comes to tendons, first the tendon property must be defined which can be done from:

Here press Add in the


pop up dialog box

In the next dialog box, click on the 3 dots to define the tendon area and a small dialog
box appears where you can specify the strand diameter and the number of strands:

midas Civil

7. Loading

Fill in the rest of the dialog box as shown below:

45

midas Civil

7. Loading

46

Creation of tendons
To create the tendons go to: Load -> Temp/Prestress -> Tendon Profile

The following dialog box appears, fill this in as


shown. Also select the elements to which you want
to assign the tendons or put this in the Assigned
Elements field :

By pressing OK, the tendon will be generated:

midas Civil

7. Loading

47

We will be creating 3 more tendons. Please create the tendons using the dialog box as shown:
Make sure element 12to22 are assigned for tendon 3 and 4. Also, Make sure the Profile insertion point is changed
to 22. Similarly tendon 4 will start from element 22 as well.

midas Civil

7. Loading

48

midas Civil

7. Loading

Once all four tendons are added in:

Now all four will be copied down by 0.5m. For this, the copy
option will be used within the tendon profile dialog box, first
select all the tendon you want to copy (in this case all four of
them) and then press Copy/Move. Here fill in the dialog box
as shown right:

49

midas Civil

7. Loading

Once you press OK, all four tendons are copied down by 0.5m, the dialog box and the tendons
appear as shown below:

50

midas Civil

7. Loading

51

Apply prestress:
Go to Load -> Temp./Prestress -> Tendon prestress

Change the units from the bottom right part of the screen. In this case it's beneficial changing into N
and mm rather than using kN and m.

midas Civil

7. Loading

52

Once the units are changed in the dialog box change the Load case and the load group names fill in
the dialog box as shown below:
The prestress added in will appear in the model
and also will be added into the window above the
Add button

At this point you should have a model equivalent to:


4 Loads Including Prestress Loads

midas Civil

8. Moving Load

Adding in Moving Loads in midas Civil is a 3 step procedure:

1) Define lanes
2) Add vehicles
3) Connect the lanes to the vehicles through moving load cases
First specify the code to be used from Load -> Moving Loads-> Moving Load Code

53

midas Civil

8. Moving Load

Definition of lanes
Go to: Load -> Moving Load -> Traffic Line Lanes -> Add

Change the units back to m at the bottom right part of the screen. In midas Civil the
definition of lanes happens with an eccentricity from a reference line

54

midas Civil

8. Moving Load

Following this, fill in the dialog box as shown:

For the Selection by keep the option as 2 points, then click on the two ends of your bridge, this way the software will define the
reference line from which your lane will be positioned at a distance defined in the eccentricity field.

55

midas Civil

8. Moving Load

Press Apply and you will see your lane being defined:

When defining the next lane delete the information the software used to create the previous lane.
For this simply click on No, and hit Delete

56

midas Civil

8. Moving Load

Similarly create lanes 2,3 and 4. The eccentricities for these are -1.5, 1.5 and 4.5m respectively.
Once this is done, the lanes look as shown below:

57

midas Civil

8. Moving Load

Vehicle definition
To define these go to Load -> Moving Load -> Vehicle -> Add Standard
Here the adjustment factors can be changed for LM1 .

58

midas Civil

8. Moving Load

59

By pressing apply the vehicle type can be changed, and LM3 can be defined:

Looking at the works tree the following


should be defined:

Press ok and the second vehicle will be defined.

midas Civil

8. Moving Load

Moving Load cases


Go to Load -> Moving Load -> Moving Load Case
Here fill in the dialog box as shown below:

60

midas Civil

8. Moving Load

61

Add in another moving load case as shown below:

By pressing OK The works tree will


change as shown below:

At this point you should


have a model equivalent to:
5 Moving Loads

midas Civil

9. Construction Stage Analysis

62

As mentioned previously the groups will be used for the definition of the Construction Stages (CS)
To start defining these go to: Load -> Construction stage -> Define C.S. -> Add

In the dialog box that appears the duration will be defined as well as different Element, Boundary and
Load groups will be activated. Fill in the dialog box as shown below.

28 days

100%

midas Civil

9. Construction Stage Analysis

With this the first construction stage is done.


The following construction stages are described below in the table:
Stage

Duration

CS2

10

CS3

10

CS4

10

CS5

10000

Element
Deck2
Age 7
Deck3
Age 7
Deck4
Age 7

Boundary

Side Supports

Load
Activate:Wet Concrete2, Form Traveler2
Deactivate: Wet Concrete1,Form Traveler1
Activate:Wet Concrete3, Form Traveler3
Deactivate: Wet Concrete2,Form Traveler2
Activate:Wet Concrete4, Form Traveler4
Deactivate: Wet Concrete3,Form Traveler3
Activate: Surfacing
Deactivate: Wet concrete4, Form Traveler4

63

midas Civil

9. Construction Stage Analysis

64

The construction stages can be check through the CS dropdown box in the modelling space:

Once this is done, perform the analysis. When done the software will indicate the analysis was
completed successfully in the message window:
At this point you should
have a model equivalent to:
6 Final Model

midas Civil

10. Results

65

All results can be checked in each construction stage for various load cases. Starting with the
reactions, go to Results -> Reactions -> Reaction Forces/Moments

Change to the CS which you would like to check and select the load case you want to check the
results for. For these the values and the legend can be displayed :

By pressing Apply the results can be checked

midas Civil

10. Results

66

Similarly Displacements can be checked from: Results -> Deformations -> Displacement Contour

Bending Moments can


be checked from:
Results -> Forces ->
Beam Diagrams

Correction
to be made

midas Civil

10. Results

Stress results can be checked from Results -> Stresses -> Beam Stresses (PSC)

67

midas Civil

10. Results

68

Tendon Stress Losses (Results -> Results Tables -> Tendon -> Tendon Loss)
Here tendon stress losses can be checked in a tabular format:

Correction
to be made

midas Civil

10. Results

69

This can also be checked in a graphical format from the Tendon Loss Graph:

Correction
to be made

midas Civil

10. Results

70

Using the moving load tracer the software will generate the worst live load distribution for a particular
position in the structure and a given effect. This can be checked only in the Post Construction stage.
These moving load results can be checked using the Moving Load Tracer from : Results -> Moving
Load -> Moving Load Tracer -> Beam Forces Moments

midas Civil

10. Results

By clicking on Key Element the window turns green and you can simply click on the element of
interest. By pressing Apply the influence lines and load distribution can be obtained

71

You might also like