INSPECTION REPORT
REPORT NO.: SGS-TANK-TGX-002
DATE INSPECTION: 27/6/2014
PROCEDURE NO.: NDT HI-TECH/TP-PAUT/001/12
WELD TYPE: BUTT WELD
PROJECT DETAILS
MATERIAL SCANNING SURFACE As
PROJECT : TANK INSPECTION S/S O.D
Welded
SPEC.: SURFACE: CONDITION:
CLIENT : SGS
ACC. WELDING Wallpaper Paste /
ASME SEC V111 DIV 1 GTAW / SMAW C OUPLANT :
CRITERIA : PROCESS: Water
MAKE / BRAND: EQUIP. MODEL / S.NO.: CALIBRATION DUE DATE: SCANNER: SOFTWARE: JOB NO CABLE TYPE / LENGTH: DAMPING / REJECT:
Olympus / Omniscan Manual with
OMNI 201295 11 MARCH 2015 MXU 2.0R20 SGS TANK-001 Probe Cable 5L64-A12, 2.5m Off
MX Encoded
SEARCH UNIT & CALIBRATION DETAILS
SCAN REF LEVEL SCANNING FREQ. APERTURE
CHANNEL SKEW PROBE ID WEDGE REF.ANGLE CAL.REF TARGET TCG % MAKE
OFFSET (DB) (DB) (MHZ) ELEMENTS
Gr.1 Sectorial 90 5L64 A12 SA12-N55S 55-70 Notch 0 80 46 dB +6dB 5 32-64 R/D Tech
10% t
Gr.2 Linear 90 5L64 A12 SA12-N55S 70 Notch 0 80 44dB +6dB 5 32-64 R/D Tech
ASME Sec V Block, PROBE Elev:
CALIBRATION BLOCK: No.of Elem: 64 Pitch : 0.6 mm
10mm
DETAILS:
EVALUATION & RECORD OF INDICATIONS
START DEPT
S/N JOINT ID IND. HEIGHT THICKNESS
LOCATIO LENGTH (MM) H RESULT REMARKS
O NO. (MM) (MM)
N (MM) (MM)
NOTES
1.The Total scan area is 1000 mm and separated into two sections part1- 500 mm & part2- 500 mm
2. The PAUT inspection carried out on both side of the weld skew 90 & skew 270
Sign : Sign :
Name : Name :
Date : 27/06/2014 Date :