Construction Technology &Temporary Works (CON4510) Page 1 of 4
AY2016/17 Semester 2 Exam [EG114111] FT
© Vocational Training Council
(b) Structural steel is a common construction material but still has (10 marks)
drawbacks on implementation. Identify SIX (6) advantages and
FOUR (4) disadvantages for the use of structural steel elements.
(c) With the aid of an annotated sketch, prepare a typical structural (10 marks)
steel frame construction with concrete floor and show the steel
beam and column connection.
Q.2 (a) Sound insulation is required for specific building function. Discuss
the following sound energy absorption mechanism:
(i) Porous absorption; (3 marks)
(ii) Panel absorption; and (3 marks)
(iii) Cavity absorption. (4 marks)
(b) With the aid of an annotated sketch, design a high sound insulation (15 marks)
concrete floor construction.
(b) Slab opening is usually required for installing new staircase, lift, (13 marks)
damp water and passage of services ducting. Explain in detail a
procedure for formation of an opening in an existing concrete slab.
(c) Explain SIX (6) factors that influence the choice of appropriate (6 marks)
contractual arrangement for an alteration and additional work
project.
____________________________________________________________________________________________
Construction Technology &Temporary Works (CON4510) Page 2 of 4
AY2016/17 Semester 2 Exam [EG114111] FT
© Vocational Training Council
Q.4 (a) As a subcontractor, you are required to make a presentation to the (16 marks)
client’s Project Manager about the quality of your formwork
system. Briefly explain the formface quality you provided and the
drawbacks of using other sub-standard materials.
(b) Explore various methods of taking care of the formwork system in (9 marks)
order to increase its service life.
Q.5 (a) A 5m high and 12m long wall with uniform cross section of 1.0m (20 marks)
at bottom and 0.6m at top is going to be cast with concrete in one
go from the top.
(b) Plot a diagram of concrete pressure against wall form height in (5 marks)
order to determine the maximum pressure.
- End of Paper –
____________________________________________________________________________________________
Construction Technology &Temporary Works (CON4510) Page 3 of 4
AY2016/17 Semester 2 Exam [EG114111] FT
© Vocational Training Council
Q.5 (a)
Q.5 (b)
____________________________________________________________________________________________
Construction Technology &Temporary Works (CON4510) Page 4 of 4
AY2016/17 Semester 2 Exam [EG114111] FT