One Smart Cprofile - (2018 Sept)
One Smart Cprofile - (2018 Sept)
One Smart Cprofile - (2018 Sept)
SINGAPORE MALAYSIA
www.onesmart.com.sg
COMPANY LEADERSHIP
ADVISORS
Er. Prof. Yong Kwet Yew Ir. Dr. Ooi Teik Aun
• Professor of Civil Engineering • Accredited Checker, Arbitrator,
• Vice-President, National University of Expert Witness, Chartered Engineer (UK)
Singapore • Professional Engineer (Malaysia),
• Board and Exco Member, Land Transport APEC Engineer
Authority, Singapore • International Professional Engineer
• Chairman, International Panel of Advisers, • President of Southeast Asian
Land Transport Authority, Singapore Geotechnical Society
• Past Chairman, Association of • Immediate Past Chairman of
Geotechnical Societies in Southeast Asia Association of Geotechnical Societies in
• Fellow, Institution of Engineers, Singapore Southeast Asia
• Chairman of IEM Tunnelling and
Underground Space Technical Division
2002-2003 and 2006-2009
MANAGEMENT
Ir. Er. Dr. Ong Chee Wee, Victor Er. Ng Chew Chiat, David
Managing Director Executive Director
• B.Eng. (Hons) Civil, M.Sc. (Civil), • B.Eng. (Hons) Civil, M.Eng. (Geotech)
PhD (Geotech) • PE (Civil), PE (Geo), QECP (Singapore)
• PE (Civil), PE (Geo), QECP (Singapore) • ASEAN Chartered Prof. Eng.
• PE (Civil) (Malaysia) • SPRING Civil & Geotechnical Works
• ASEAN Chartered Prof. Eng. TC Member
• APEC Eng, Int. PE. • Deputy Chairman of IES Civil &
• ISSMGE TC207 Soil-Structure Interaction Structural (Geotechnical Division) TC
and Retaining Wall • BCA Multi-Agency Task Force on Pile
• ISSMGE TC212 Deep Foundation Load Test Guidelines
• SPRING Civil & Geotechnical Works • Co-Convenor for IES & SPRING WG on
TC Member Bidirectional Load Test Guidelines
02
www.onesmart.com.sg
COMPANY LEADERSHIP
03
www.onesmart.com.sg
AWARDS
Top 50 Engineering
FEATS @ IES-SG50
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
04
www.onesmart.com.sg
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
05
www.onesmart.com.sg
Project Mass Rapid Transit (MRT) Lembah Singapore Downtown Line 3 – Tai Seng Facility
Kelang Jajaran Sungai Buloh – Kajang, Building
Malaysia -Professional Engineer (Geotechnical) for LTA – Design,
Underground Works (Tunnels, Stations & Construction and Completion of Tai Seng Facility Building,
Associated Structures) Between Semantan responsible for the design and construction of the temporary
North Portal and Maluri South Portal (UG1) earth retaining structures and geotechnical aspects of the
-Contractor’s Independent Checking Engineer design and construction of the underground structure
(Accredited Checker) for Design of deep excavation
(for 3 MRT Stations), temporary earth retaining Singapore Downtown Line Stage 1 – Promenade
structures, tunnel-pile interaction MRT Station
-Qualified Person (Supervision) for the S$231 Million project
Singapore Downtown Line Stage 3 – consisting of station, shafts and bored tunnels
Bendemeer MRT Station
-Qualified Person (Supervision) for the S$215 Million Contract 8288 – Tanglin Halt Outlet Drain at North
project consisting of a station, shafts and bored Buona Vista
tunnels. Total of 4 Nos. of TBM were used to bore -Independent Checker for TERS-Mined Tunnel
through the tunnels with total length of 4.54 km -Impact assessment to adjacent Buona Vista MRT and
underground tunnel (CCL)
Singapore Downtown Line Stage 3 – 5
Stations and Associated Tunnels from Bedok Contract ER382 – New Road Between Macritchie
to Tampines Viaduct and Adam Flyover
-Qualified Person (Geotechnical) for the geotechnical -Qualified Person (Design) Geotechnical Services
design of the DTL3 5 stations and tunnels
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
06
www.onesmart.com.sg
Proposed Upgrading Works for Lorong Kuda Junction and Tunneling at Persiaran KLCC and Lorong Kuda,
Kuala Lumpur City Centre, Wilayah Kuala Lumpur for KLCC (Holdings) Sdn. Bhd.
-Independent Checking Engineer (ICE) as Requirement for Proposed Development lnterfacing with Mass Rapid Transit (MRT)
Structures
Project Mass Rapid Transit 2 (MRT Line 2): Sungai Buloh- Serdang - Putrajaya (SSP)
Underground Works Package: Design, Construction and Completion of Tunnels, Stations & Associated
Structures from Jalan lpoh North Escape Shaft to Desa Waterpark South Portal
-CICE/Accredited Checker for Ampang Park Station and KLCC East Station
Mumbai Metro Line 3 Design & Construction of Underground MRT Stations at Marol Naka, MIDC & SEEPZ
& Associated Tunnels, India
-Lead Design Checker
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
07
www.onesmart.com.sg
Soil Improvement Works for Total Lube Ground Improvement PVD at Setapak, Kuala Lumpur, Malaysia
Oil Blending Plant (LOBP) and Lube Park
Shared Facility Feed 2 (LPSF)
Soil Compaction at Jurong Westward Extension, Land Preparation Works for Airport Development
Singapore
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
08
www.onesmart.com.sg
Sky Arena Phase 2 - Proposed Residential Development of 580 Units of Condominium on (Parcel 2) Lot
17899, Jalan Ayer Jerneh, Mukim Setapak, Kuala Lumpur
-Geothechnical & Ground Improvement Consultancy Services
Ground Improvement for Construction and Management of Staging Ground and Infilling Works at Pulau
Tekong
-QP (Design) (Geo) for the Deep Compaction Works
Ground Improvement for Tuas Terminal Phase 1 Reclamation, Wharf Construction and Dredging
-QP (Design) (Civil) for the Deep Compaction Works
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
09
www.onesmart.com.sg
INFRASTRUCTURE WORKS
World’s Largest
Floating Solar-cell Test Bed
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
10
www.onesmart.com.sg
INFRASTRUCTURE WORKS
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
11
www.onesmart.com.sg
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
12
www.onesmart.com.sg
Proposed Mixed Development consist of Phase 1 - One Louis Vuitton @ ION Orchard at 2
Block of Service Apartment (35 - storey) 410 Units, Orchard Turn
Setapak, Kuala Lumpur, Malaysia. -Qualified Person for the Design and
Supervision for the Facade
Proposed Addition & Alteration Works to Tiffany & Co.
Retail Units at ION Orchard Development Proposed Public Housing
-Qualified Person for the Design and Supervision for the Facade Development Comprising 9 Blocks of
16-Storey Residential Building (Total:
Proposed Addition & Alteration Works to Dior Retail 928 Units)
Units at ION Orchard Development -Qualified Person for the Design and
-Qualified Person for the Design and Supervision for the Facade Submission to HDB and BCA for the Windows
Steel Structure for Facede Support at LV, Dior and Tiffany & Co. at ION Orchard, Singapore
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
13
www.onesmart.com.sg
Proposed Public Housing Development (HDB) Comprising 1 Block of 17-Storey Residential Building (Total
232 Units) with Surface Carpark at Jurong West Street 41 (JWN4C21)
-Qualified Person for the Design and Submission to HDB and BCA for the Windows
Proposed Public Housing Development Comprising of 1 Block of 6/19 Storey, 3 Blocks of 8/14/19-Storey,
1 Block of 14 / 19-Storey & 2 Blocks of 19-Storey Flats (Total: 837 Units) Edgedale Plains (PGEC36)
-Qualified Person for the Design and Submission to HDB and BCA for the Windows
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
14
www.onesmart.com.sg
Periodic (Visual) Structural Inspection of Ivory Heights at Blks 117, 118, 119,
120, 121, 122, 123 and 124 Jurong East Street 13
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
15
www.onesmart.com.sg
Contract T310 – Construction of Bayshore Station and Tunnels Design and Build of Public Housing
for Thompson-East Coast Line Project A at Bukit Batok N4C16
& N4C17 (Total: 1,793 Dwelling
Contract C913 – Design and Construction of Station and Units)
Tunnels at Hillview and Cashew for Downtown Line Stage 2
Construction and Management
Contract ER449A – Viaduct from TPE to PIE (Westbound) and of Staging Ground and Infilling
Upper Changi Road East Works (Phase 2)
PUB ECM Model Site at Punggol Sails- Punggol Water Treatment Plant with Sedimentation Sump
West C8 (PUB ECM Model Site at Punggol Sails- Punggol West C8)
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
16
www.onesmart.com.sg
SPECIAL STRUCTURES
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
17
www.onesmart.com.sg
3D Model for Underground MRT Structure Tunnel Pipe Interaction with Pile Construction
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
18
www.onesmart.com.sg
Impact of crane/lorry loading on MRT station ERSS system Impact analysis due to shafts excavation and pipe jacking
Tunnel Impact Assessment To Waive Debonding of Piles Mumbai Metro Line-3 launching Middle shaft with
2 ring beams and 3 rows of 4 m inclined rock bolts
3D Modelling on Proposed Deep Foundation System Slope Enhancement by Using Soil Nails
Disclaimer: The project and engineering experience listed above are collective experience in the capacity of the company and of the Qualified Person responsible for the jobs.
19
is composed of
diligent professional engineers and
CONSULTANCY SERVIC
doctorates who are dedicated in offering R ES
our clients the advantage of the state-of-the- OU
art design and presence. Our staff are motivated
by continuous training to enhance and develop
their knowledge and capability in providing the
best quality service. We are well established and SPECIALIST GEOTECHNICAL ENGINEERING DESIGN
connected to university academics, professional • Deep Excavation / Basement Excavation Design
and specialist services in various aspects • Earth Retaining & Stabilizing Structure (ERSS)
of civil, structural and geotechnical • Independent Checking Engineer for MRT Interface
engineering to provide one-stop • Geotechnical Building Work (GBW) Design
integrated services to value • Shallow & Deep Foundation Element Design
O -add to our clients. • Ground Anchor and Soil Nail Design
UR • Slope Analyses & Ground Improvement
RE • Tunneling & Pipe Jacking Design
SO
URCE
S CIVIL & STRUCTURAL ENGINEERING DESIGN
• High Rise Building Design
• Curtain Wall, Cladding, Skylight, Façade, Canopy and Railing
has been • Building / Factory / Additions & Alteration Design
established to provide consultancy & • Viaduct Structure and Underground Structure
engineering services in Civil, Structural • Qualified Erosion Control Professional (QECP)
• Design of Water, Drainage and Sewer
and Geotechnical Engineering.
• Periodic Structural Inspection
We are committed to provide economical • Road Opening Application (ROA)
and robust engineering designs and OUR MI
solutions to the industry. SS
IO
We acquired knowledge and capability
N
in the areas of structural, drainage, sewerage,
water services, earthworks, high rise buildings, will
foundation and geotechnical engineering. focus on the strength of the
company to provide one-stop
We ensure that our engineering solutions are conceptualized and specialist engineering
and executed by a team of dedicated professionals. consultancy services to its
clients and commit to develop
We strive to deliver our services within approved cost-budgets, its staff’s professional
schedule and quality standard. capabilities.
ABOUT
MALAYSIA SINGAPORE
ONE SMART Engineering Sdn Bhd ONE SMART Engineering Pte Ltd
F-5-06 & F-5-07, Block F, Neo Damansara, 21 Bukit Batok Crescent,
No.1 Jalan PJU 8/1, #06-75 & #06-76 WCEGA Tower,
Damansara Perdana, Singapore 658065
47820 Petaling Jaya Tel: +65-62656766
Tel: +603-7732 8970 Fax: +65-62817151
Fax: +603-7732 9870 Email: admin@onesmart.com.sg
Email: admin@onesmart.com.sg