Pasikkad Action Plan
Pasikkad Action Plan
Pasikkad Action Plan
ACTIVITY DESIGN
This action plan shall serve as strategy to be undertaken by Bacoor PNP in coordination
with barangay officials in the crime prevention, control and enhance patrol operations in the total
fight against all kinds of criminality.
II. OBJECTIVES
III. SITUATION
Patrol is the act of moving about in an area for the purpose of observation, inspection
and collaboration, prevention of crime and provision of a secured environment.
At present, the Bacoor PNP has a total strength of 185 wherein 130 personnel were
conducting actual patrol duties, utilizing twenty-one (21) patrol vehicles and eight (8)
motorcycles in the conduct patrol operations. However, there is a need to enhance patrol
methods by augmenting barangay tanods in conducting routine patrol and quick response in
an incident or accident.
Majority of response recorded of this station are vehicular accident, followed by crimes
of robbery and theft. Traffic congestion plays a big factor that hampers the response of
responders.
The Bacoor PNP thru the Local Government of Bacoor will provide two (2) bicycles
under the POPS Plan to the 73 barangays to be utilized in barangay patrol
operations in their respective AOR.
The Bacoor PNP will conduct series of basic patrol seminars to the barangay
personnel to effectively implement patrol duties. PCP Commanders thru outpost
supervisors will act as barangay patrol supervisors.
PASSIKAD patrollers will conduct routine patrol in their respective AOR and
immediately report any incidents or accidents to their respective patrol
supervisors, they will also serve as first responders and arresting officer in the
scene.
V. FUNCTIONS AND RESPONSIBILITIES
The amount of shall be release for this purpose existing auditing and accounting rules and
regulations and budgeting policies to cover all the expenses of the individual related to his/her
activity which shall be charged to the POPS Plan Fund of this City to wit:
VII. RESPONSIBILITY
The Bacoor City Police Station shall be responsible for the implementation of the activity in
close coordination with LGU and other NGO’s.
The after activity report shall be submitted within the fifteen (15) days after the conduct of
the activity.
Proposed by:
Approved by: