The document is an as-built drawing for a surface facility for Pertamina EP. It was issued on July 26, 2019 for as-built purposes by contractor PT. Putra Ramli. The drawing was approved by Fikri Zubaidi and Kiki and checked by Robertus S Yudy as the construction assistant manager. It provides an NDT map for the surface facility and was drawn by Zaenal.
The document is an as-built drawing for a surface facility for Pertamina EP. It was issued on July 26, 2019 for as-built purposes by contractor PT. Putra Ramli. The drawing was approved by Fikri Zubaidi and Kiki and checked by Robertus S Yudy as the construction assistant manager. It provides an NDT map for the surface facility and was drawn by Zaenal.
The document is an as-built drawing for a surface facility for Pertamina EP. It was issued on July 26, 2019 for as-built purposes by contractor PT. Putra Ramli. The drawing was approved by Fikri Zubaidi and Kiki and checked by Robertus S Yudy as the construction assistant manager. It provides an NDT map for the surface facility and was drawn by Zaenal.
The document is an as-built drawing for a surface facility for Pertamina EP. It was issued on July 26, 2019 for as-built purposes by contractor PT. Putra Ramli. The drawing was approved by Fikri Zubaidi and Kiki and checked by Robertus S Yudy as the construction assistant manager. It provides an NDT map for the surface facility and was drawn by Zaenal.
NOTES : PERTAMINA EP CONSULTANT / CONTRACTOR / FABRICATOR DRAWING STATUS P E R T A M I N A EP
- NTS : NOT TO SCALE ASSET 5 SURFACE FACILITIES APPROVED SIGNED DATE AS - BUILT CONTRACTOR : PR PT. PUTRA RAMLI 1 26/07/2019 ISSUED FOR AS BUILT AR ZA GENERAL CONTRACTOR & SUPPLIER PUTRA RAMLI APPROVED SIGNED DATE DRAWN JUNI 26/07/2019 REMARK 0 07/06/2019 ISSUED FOR CONSTRUCTION AR ZA PROJECT : FIKRI ZUBAIDI/JOKO B 06/06/2019 ISSUED FOR APPROVAL AR ZA PMC PERSONIL CHECKED KIKI 26/07/2019 TITLE: PT. PROSYS BANGUN PERSADA A 05/06/2019 ISSUED FOR REVIEW AR ZA NDT MAP NOT TO SCALE ROBERTUS S YUDY PROJECT 26/07/2019 REV DATE DESCRIPTION DRW ENG CHK'D APPV CONSTRUCTION AST. MANAGER ZAENAL MANAGER REVISIONS SCALE : NTS DWG NO. : F/L-SSG-PR- LSE 1703-1 1 OF 2 REV. : 1