Solar panel power generation system use photovoltaic effect principle, it is the power system that
directly convert solar radiation into electrical energy generating system. Off-Grid Solar
System convert solar energy into electricity to supply the load through battery energy storage,
connected to the off-grid inverter
1 Insulated shoes with low voltage insulated gloves should be worn and insulated tools should be used;
2 Eye-catching, clear and easy to understand electrical safety logo should be pay attention to in
construction site;
3 Outdoor construction work shall not be taken in rain, snow, windy weather conditions ;
4 when installed power systems at the construction site, overhead cable insulation should be isolated;
5 Using hand-held power tool should follow the GB3787 standard "hand-held power tool of
management, use and inspection Maintenance of safety technology "
The following safety measures should be taken when installing the 3kw Off-Grid Solar System:
1 The components of a photovoltaic system in the storage, handling, lifting and other process can not
to be collision damage. When Solar PV lifting,its bottom be timbered, the back can not be subjected to
any impact and weight;
2 The surface of the Solar panel shall be covered by the valid shade during the installation, to prevent
the risk of electrical shock.
4 When connected with no-switch-off arc function, it cannot be positive or negative or open under load
or a low resistance circuit situation.
5 When connected completed or partially completed PV systems, in case of rupture of Solar Panel,we
cannot close to the system and ask the professional worker for disposal.
6 Pay attention to the impact of the hot spot effect after connected Turn PV circuit and can not partial
shelter solar panel.
7 Set up a dedicated footboard when installed and construced on more than 10 ° sloping roof
8 Aerial construction workers should wear safety protective equipment, and set up eye-catching, clear,
understandable security identity.
Construction projects include: fabrication and installation of solar panel module bracket, installation
of solar panel assembly phalanx, the battery connections, installation and commissioning of electrical
equipment, debugger of off-grid system.
Construction Preparation
No
Name Deviation Usage
.
Level Measured horizontally standard deviation
1 Building Axes test vote
Theodolite ±2"
2 Vertical Measured the vertical standard deviation Building verticality test vote
theodolite ±6"
Measured go-back error of ± 3mm per building General height
3 Level gauge
kilometer high measurement
4 Steel tape Length error ± 3mm Distance
5 Multimeter Accuracy error of ± 0.5 Measured voltage and current
Technical preparation
Technical preparation is the key factor in determining the quality of construction, it follow following
aspects of work:
(1) first carry out investigation and research on the ground and access local data and related data
analysis summary, make practical engineering design.
(2) The axis of the control point building the establishment of the construction site of the project and
elevation axes of control network.
(3) Of high construction control ,it use water level elevation to introduced from the measurement
standard point (bp), and establish fixed elevation control point outside the building was built in order to
lead building measure and the foundation level.
(4) Engineering axes control:axis test using theodolite Surveying and both ends of each control
axis,establish some distance fixed mark leaving the location of the building to, for construction
observation and review of the transfer use.
(5) Prepare the construction of the required specifications, work instructions, for all kinds of records
form Atlas construction and construction-related materials.
(6) Organize construction team familiar with the drawings and specifications and do preliminary
drawings record.
(7) The technical staff make a joint checkup of the drawings and make a record of examination
question.
(8) Make practical and technical measures for the construction program and make construction
schedule.
The installation include :1 Solar mounting system installation 2 Solar panel Installation 3 The
connection of the system component.
(5) string connection of Solar battery cables and DC convergence box connection
According to drawings, determine the mounting area of solar panels, depending on the different
components of the installation area, check if the embedded part meets the design requirements,
determine the details of the location of each part of the holder of aluminum profiles, block division and
do markers;
According to drawings,it is the time to divide region to refine division and precision measurement
through a level, theodolite and other measuring tools. Put line according to each location, and retest to
ensure the accuracy of construction, in order to reduce the amount of adjustment after the procedure.
Fix the base reference point and confirm the installation location
Install front and back column on the Cement block foundation, and then install the Triangle connection
on the front and back column. Attention: install the M10*25 Outer corner and within briquetting on the
triangle connection firstly.
(2) Vertical beams installation
On the open side of the vertical beams , be connected tightly with the triangle connection Within
briquetting.
Firstly, installed the part of triangle connection well .Secondly, connect the bracing and triangle
connection orderly. Thirdly, installed Fastener well.
Firstly, installed the beam on the vertical beams through the bolt set. Secondly, connected well the
Beam through the fittings. Thirdly, tighten up the Fastenerver.
(5) Component installation
Firstly, install Edge Crush and Medium Crush well with the Bolt set.Secondly,list the solar panels
well.Secondly, tighten up the Fastener.
List embedded solar array rack plinth.And detect a single cell board current, voltage, qualified ,then
install solar panel modules.Check if Plug is firmly .junction boxes and plug should be waterproofed.
Detect if solar module array of No-load voltage is normal.this work should be completed by the
professional technician.
1 After the solar panels installation is completed, make the appropriate fine-tuning of the appearance of
the assembly square flatness, pitch gap portion parts. After all meet the requirements, make the link at
the welding operation with the welding and the whole structure stereotypes.
2 when installed solar panels, make ensure that the connection assembly bracket solid and reliable,
and it can easily replaced by another solar cell module. Square solar cells must be able to resist and
stand 120km / h wind without being damaged. Each Bolts, retainer clips and clamps must be fixed, can
not be gaps.
3 Make sure the connection of the components accordance with the design and installation diagram
groups are in strict connected in series, Grouping attended. Each group is connected to refine the
division of labor, strengthen self-test and supervise each other, make sure the connection is correct.
While ensuring reliable grounding. Wire joint firm, not out of line, the drain line. On-site production of
special connectors must be installed strictly complyed with rational combination of the assembly
process, dedicated connector plug must be connected in place.
Component testing:
1 Solar panel installed well and work well, to test the connection.
2 Packet detect each solar cell connection status and parameters, there is some things need to detect
such as physical output voltage, output current, and insulation resistance, etc., in order to detect the
string connection is working, appropriate records should be made.
3 Ensure the reliable connection of the solar cell module and a holder, ensure reliable grounding DC
combiner box and reliable connection as well as a solar cell module with insulation
(2) Battery (200AH / 12V): 12V battery every four series into a group consisting to 200AH / 48V. After
the completion of a series-parallel drawn, positive lead and a negative lead from both sides of the
battery. Positive and negative connect to the input terminal (1,3,5) of Breaker 100A, leads to two wires
from the output of the Breaker (2,4,6) connected to the solar inverter
(3) AC output cable (220V / 50HZ) connection. AC output terminal of solar inverters connect to three-
Color lines ,which connected to the AC output terminals live, neutral and ground. On the other end ,it
connected to 32A Breaker input terminal: FireWire to FireWire connection, the zero line to the zero
line, ground to ground wire. The live, neutral and ground leading from the breaker is connected to the
power supply socket (FireWire connected FireWire, zero line and ground zero ground). As illustrated
(4)3kw Off-grid Inverter
AC 220V or110V50/60HZ
input
DC Battery:48V
220v±3% or AC 220v±3%240v±3% or AC 100v±3%110v±3%
AC
50HZ/60HZ
output
Rated The maximum continuous output power: 3000W;The instantaneous
power maximum power: 6000W
Charging
Intelligent charging
way
Battery
Charging
0-15A
current
DC input 48v(48v-80v)
Max
45A
current
Controlle Solar panel reverse polarity protection, short circuit protection, lightning
Protect
r protection, battery high / low protection, thermal protection, over-
function
discharge protection
Convert
≤5s
time