This method statement outlines the excavation process for a road area, which will involve excavating down to 1.5 to 2 meters, leveling and compacting the soil with a road roller, and transporting excess soil to a designated area. Equipment used will include excavators, dump trucks, tractors, and the work areas will be properly demarcated and barricaded for safety.
This method statement outlines the excavation process for a road area, which will involve excavating down to 1.5 to 2 meters, leveling and compacting the soil with a road roller, and transporting excess soil to a designated area. Equipment used will include excavators, dump trucks, tractors, and the work areas will be properly demarcated and barricaded for safety.
This method statement outlines the excavation process for a road area, which will involve excavating down to 1.5 to 2 meters, leveling and compacting the soil with a road roller, and transporting excess soil to a designated area. Equipment used will include excavators, dump trucks, tractors, and the work areas will be properly demarcated and barricaded for safety.
This method statement outlines the excavation process for a road area, which will involve excavating down to 1.5 to 2 meters, leveling and compacting the soil with a road roller, and transporting excess soil to a designated area. Equipment used will include excavators, dump trucks, tractors, and the work areas will be properly demarcated and barricaded for safety.
Download as DOC, PDF, TXT or read online from Scribd
Download as doc, pdf, or txt
You are on page 1of 1
METHOD STATEMENT
Purpose: Excavation for Road Area
Scope of work
Excavation up to 1.5 mtrs.To 2 Mtrs. approximately
Side cutting, dressing leveling & compaction Road Roller Transported of soil to designated area. Procedure
De-markation of to Excavation Area.
Proper access making for vehicle movement. Dressing leveling and side cutting using hand tools Compaction by using Road Roller Excavation using mechanical machines poclane, dumpers, & tractors & may be manually. Transportation of soil to designated area using dumpers etc. Area hard barrication around excavated area. Access to be provided for entry exit to pit excavated.
Equipment Used
Poclan, JCB, Dumpers, Tractors.
Safety Measures
PPE’S will be provided to all work men.
Proper access for vehicle movements. Hard barrication 1.00mtr. Away from excavated pit. Swing area defines & barricaded any one side around excavator.. Continuous supervision.