MRP 1 (2)

MRP

Exercise 1

A LT: 1 w

B LT: 2 w C LT: 1 w

D LT: 1 w E LT: 1 w

The product structure of the final product A with lead times (LT) is shown above. Complete the table
below to determine the need of components and when to place an order. Demand for final product A is
50 at week 5 and 100 at week 6.

Week
Item
1 2 3 4 5 6
Gross Requirements 50 100
A
Beginning of assembly
Gross Requirements
B
Planned order
Gross Requirements
C
Planned order
Gross Requirements
D
Planned order
Gross Requirements
E
Planned order

Jyväskylän Postiosoite/ Puhelin/Tel. Faksi/Fax Internet Y-tunnus 1006550-2


ammattikorkeakoulu Address 020 743 8100 (014) 449 9694 www.jamk.fi
JAMK University of PL 207 +358 20 743 8100 +358 14 449 9694
Applied Sciences FI-40101 Jyväskylä
FINLAND
MRP 2 (2)

Exercise 2
Fill the following MRP- table. Delivery time for this product is 2 weeks. The order lot size is
100 pieces.
Week 1 2 3 4
Gross Requirements 50 45 20
Available inventory 75
Net Requirements
Planned Order Receipt
Planned order

Exercise 3

Fill the following MRP- table. Delivery time for this product is 2 weeks and Minimum Order
Quantity (MOQ) is 200 pcs. How should we proceed?

week 1 2 3 4
Gross Requirements 50 250 100 50
Placed orders 200
Available inventory 150
Net Requirements
Planned Order Receipt
Planned order

Jyväskylän Postiosoite/ Puhelin/Tel. Faksi/Fax Internet Y-tunnus 1006550-2


ammattikorkeakoulu Address 020 743 8100 (014) 449 9694 www.jamk.fi
JAMK University of PL 207 +358 20 743 8100 +358 14 449 9694
Applied Sciences FI-40101 Jyväskylä
FINLAND

You might also like