Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

CBR Test Sheet

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

SATCON CONSTRUCTION PLC

GINER-IMI-GODE ROAD PROJECT


CONTRACT (3) IMI-LAB

WORK SHEET
CALIFORNIA BEARING RATIO TEST - AASHTO T 193
SAMPLING STATION: OFFSET FORMCL: SAMPLE TAKEN FROM:
DEPTH: DATE SAMPLE:
VISUAL DESCRIPTION DATE AND TIME SOAKED:
PURPOSE: SOURCE STATION DATE AND TIME TESTED:
MDD (g/cc) OMC (%) : REF No.:

DENSITY DETERMINAITON
10 Blows 30 Blows 65 Blows
SOAKING CONDITION BEFORE AFTER BEFORE AFTER BEFORE AFTER
MOLD NUMBER 8 8 9 9 10 10
WEIGHT OF SOIL + MOLD g 9530 9855 9595 9730 10180 10320
WEIGHT OF MOLD g 5890 5890 5415 5415 5865 5865
WEIGHT OF SOIL g 3640 3965 4180 4315 4315 4455
VOLUME OF MOLD cc 2124 2124 2124 2124 2124 2124
WET DENSITY OF SOIL g/cc 1.71 1.87 1.97 2.03 2.03 2.10
DRY DENSITY OF SOIL g/cc 1.44 1.41 1.65 1.59 1.71 1.70

MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION AFTER AFTER AFTER
BEFORE TOP IN. AVG. BEFORE TOP IN. AVG. BEFORE TOP IN. AVG.
CONTAINER NUMBER D 15 Z8 8 14 U
WET SOIL + CONTAINER g 206.2 267.1 194.9 188.5 196.5 208.6
DRY SOIL + CONTAINER g 178.9 210.3 169.2 154.4 170.8 175.7
WEIGHT OF WATER g 27.30 56.80 25.70 34.10 25.70 32.90
WEIGHT OF CONTAINER g 35.4 34.2 34.1 32.4 35.4 34.1
WEIGHT OF DRY SOIL g 143.50 176.10 135.10 122.00 135.40 141.60
MOISTURE CONTENT % 19.02 32.25 19.02 27.95 18.98 23.23
AVG. MOISTURE CONTENT %
Ring factor = 0.10367
PENETRATION TEST DATA
PENETRATION (mm) 10 Blows 30 Blows 65 Blows
(mm) DIAL RDG LOAD (kn) COR.LOAD(KN) CBR % DIAL RDG LOAD (kn) COR.LOAD(KN) CBR % DIAL RDG LOAD (kn) COR.LOAD(KN) CBR %
0 0 0.0000 0 0.0000 0 0.00
0.64 3 0.0359 13 0.1557 6 0.62
1.27 8 0.0958 38 0.4552 15 1.56
1.96 20 0.2396 91 1.0902 30 3.11
2.54 36 0.4313 0.43 3 154 1.8449 1.84 14 40 4.15 4.15 31
3.18 58 0.6948 233 2.7913 51 5.29
3.81 83 0.9943 300 3.5940 60 6.22
4.45 105 1.2579 365 4.3727 68 7.05
5.08 122 1.4616 1.46 7 413 4.9477 4.95 25 74 7.67 7.67 38
7.62 162 1.9408 494 5.9181 96 9.95
10.16
12.7

SWELL
No. OF BLOWS 10 30 65
RDG (BEFORE SOAKING 0.04 0.05 0.03
RDG (AFTER SOAKING) 2.3 1.14 1.97
PERCENT SWELL 1.94 0.94 1.67
AVERAGE PERCENT SWELL: 1.51

_________________________________ ___________________________________
contractor consultnt
SATCON CONSTRUCTION PLC
GINER-IMI-GODE ROAD PROJECT
CONTRACT (3) IMI-LAB
WORK SHEET
CALIFORNIA BEARING RATIO TEST - AASHTO T 193
SAMPLING STATION: OFFSET FORMCL: SAMPLE TAKEN FROM:
DEPTH: DATE SAMPLE:
VISUAL DESCRIPTION DATE AND TIME SOAKED:
PURPOSE: SOURCE STATION DATE AND TIME TESTED:
MDD (g/cc) OMC (%) : REF No.:
D ry density g/cc

MODIFUDE PROCTOR: T180


MDD(g/cc) 1.66
OMC(g/cc) 19
95% of MDD(g/cc) 1.58
Moisture density relations

1.68 Before soking After soking

1.66 Blows DD (g/cc) Moistur % DD (g/cc) Moistur %


1.64 10 1.44 19.02 1.41 32.25
1.62 30 1.65 19.02 1.59 27.95
1.60 65 1.71 18.98 1.70 23.23
1.58

pe r s e nt s w e ll (% )
1.56
1.54
12.0014.0016.0018.0020.0022.0024.00
moisture content % Dry density-persent swell
2.5
2

Load-penetration curve 1.5


Load (kn)

1
20
0.5
16 0
1.4 1.45 1.5 1.55 1.6 1.65 1.7 1.75
12
Dry density (g/cc)
8
percent CBR

4
Density - CBR Curve
0
0 2 4 6 8 10 40
Penetration (mm)
30

LOAD (KN) CBR(%) Swell 20


Blows 2.54mm 5.08mm 2.54mm 5.08mm % 10
10 0.43 1.46 3.23 7.31 1.94 0
30 1.84 4.95 13.82 24.74 0.94 1.40 1.45 1.50 1.55 1.60 1.65 1.70 1.75
65 4.15 7.67 31.06 38.36 1.67 Dry density (g/cc)

Blows dry density CBR%


Blows 10 30 65 10 1.44 7
DD 1.44 1.65 1.71 30 1.65 25
Swell 1.94 0.94 1.67 65 1.71 38
CBR at 95% :19%
Swell at 100% :1.0%

________________________________ _________________________________
contractor consultant
SATCON CONSTRUCTION PLC
GINER-IMI-GODE ROAD PROJECT
CONTRACT (3) IMI-LAB
DRY DENSITY/MOISTURE CONTENT RELATION SHIP

Date of test
Type of material
Source of sample
Material used for
Location of sample

Density Determination Maximum Dry density/OMC


Trial No. 1 2 3 4 5 6
Assumed water content (%)
Wt.of mould+soil (gm) 5060 5140 5200 5240 5220 1.68
Wt.of mould (gm) 3355 3355 3355 3355 3355
1.66
Wt.of soil in mould (gm) 1705 1785 1845 1885 1865

Dry density gm/cc


Volume of mould(c.c) 944 944 944 944 944 1.64
Wet density(gm/cc) 1.81 1.89 1.95 2.00 1.98
1.62
Moisture content determination
1.60
Moistture can No. Z5 A Z7 -7 3
Wt.of can+Wt.of wet soil (gm) 213.1 236.3 229.4 238.4 203.2 1.58
Wt.of can+Wt.dry of soil (gm) 191.9 208.8 199.9 204.2 172.2
Wt.of water (gm) 21.20 27.50 29.50 34.20 31.00 1.56
Wt.of can (gm) 34.8 33.4 34 35.7 34.3
1.54
Wt.of dry soil (gm) 157.10 175.40 165.90 168.50 137.90
12 14 16 18 20 22 24
Moisture content (%) 13.49 15.68 17.78 20.30 22.48
Dry density(gm/cc) 1.59 1.63 1.66 1.66 1.61 M.C(%)

Contractor____________________ MDD=___________________

Consultant____________________ OMC=___________________

You might also like