Standard Revisions
Standard Revisions
Standard Revisions
Index of Misc. Bridge Standards. REVISED INDEX TABLE TO ADD NEW STANDARD
7/1/2015 100-M
1066A, PRETENSIONED PRESTRESSED CONCRETE BEAM DATA SHEET.
4549-4553, 4514-4521, 4549-BTCDE thru 4552-BTCDE, REVISED: CHANGED CONCRETE PLACEMENT NOTE TO ACCOUNT FOR THE
4514-BTB, 4515-BTB, 4516-BTB, 4517-BTB, 4518-BTCD, POSSIBLE ADDITION OF A RETARDING ADMIXTURE TO THE CONCRETE. "NOTE:
4518-BTE, 4519-BTCD, 4519-BTE, 4520-BTCD, 4521- CONCRETE DECK SHALL BE PLACED IN SECTIONS AND SEQUENCES INDICATED.
BTCD, 4521-BTE, H40-09-06, H40-15-06, H40-22-06, ALTERNATE PROCEDURES FOR PLACING DECK CONCRETE MAY BE SUBMITTED FOR
H40-29-06, H40-09-14, H40-15-14, H40-22-14, H40-29- APPROVAL TOGETHER WITH A STATEMENT OF THE PROPOSED METHOD AND
7/1/2015
14, H44-09-07, H44-15-07, H44-22-07, H44-09-14, EVIDENCE THAT THE CONTRACTOR POSSESSES THE NECESSARY EQUIPMENT AND
H44-15-14, H44-22-14, RS40-031-10 thru RS40-035-10, FACILITIES TO ACCOMPLISH THE REQUIRED RESULTS. FOR APPROVED ALTERNATE
RS40-031-14 thru RS40-035-14, H24-09-06, H24-15-06, PROCEDURES THE ENGINEER SHALL DETERMINE IF A RETARDING ADMIXTURE IS
H24-22-06, H24-29-06, H30-09-06, H30-15-06, H30-22- REQUIRED TO MAINTAIN PLASTICITY OF THE CONCRETE DECK DURING
06, H30-29-06. PLACEMENT."
LRFD Designed Trestle Pile Bents. CHANGED THE WORD "SHOULD" TO "SHALL" IN
11/1/2015 P10L THE NOTE "IT SHOULD BE USED IF PILE EMBEDMENT IS LESS THAN 1'-6." IN THE
2ND PARAGRAPH 2ND SENTENCE OF "GENERAL NOTES".
Retrofit Rail Details, Deck Repair & Re-overlay Deck Repair Quantities. Culvert
11/1/2015 1031T, 1038, 1038R, 1043s1, 1043P Extension Details. Precast Culvert Extension General Notes. MODIFIED "DESIGN
HISTORY" TABLE TO STATE "(INCLUDES THIS DESIGN)".
1/1/2016 1092 CIP Culvert Revetment Protection Details. ADDED NOTE "SEE CULVERT PLANS FOR
LIMITS OF REVETMENT AND ENGINEERING FABRIC."
UPDATED NOTE 17 PERTAINING TO CONCRETE FORMS. (OLD NOTE: REMAINING
1/1/2016 RCB G1-12, TWRCB G1-12, TRRCB G1-12 IN PLACE 5 DAYS OR LONGER, EXCEPT MIN. CONC. FLEXURAL STRENGTH BEFORE
REMOVAL SHALL BE 575 PSI).
3/1/2016 RCB G2-12 ADDED SKEWED TRANSITION WALL DETAILS.
ADDITION OF PAVING NOTCH BAR 8u1 & STAINLESS STEEL QUANTITY TABLE.
J40-(01,03,05,07,09,11,13,15,17)-14 ; J40-(19-20)-14 ; J40-
3/1/2016 NOTE REFERENCING TO ROAD STANDARD PLAN BR-205. REFERENCE TO "1" DIA.
(30,32,34,36)-14 ; J40-(39-42)-14 ; J40-(47-48)-14 ; J40-50-
PVC PIPE" WAS CHANGED FROM " 1" DIA.PLASTIC CONDUIT". CHANGED
14
REFERENCE TO THE J40-51-14 STANDARDS INSTEAD OF J40-51-06 STANDARDS.
ADDITION OF PAVING NOTCH BAR 8u1 & STAINLESS STEEL QUANTITY TABLE.
J44-(01,03,05,07,09,11,13,15,17)-14 ; J44-(19-20)-14 ; J44-
3/1/2016 NOTE REFERENCING TO ROAD STANDARD PLAN BR-205. REFERENCE TO "1" DIA.
(30,32,34,36)-14 ; J44-(39-42)-14 ; J44-(47-48)-14 ; J44-50-
PVC PIPE" WAS CHANGED FROM " 1" DIA.PLASTIC CONDUIT". CHANGED
14
REFERENCE TO THE J44-51-14 STANDARDS INSTEAD OF J44-51-06 STANDARDS.
4/1/2016 J40-(03, 05, 07, 09, 11, 13, 15, 17, 19)-14 INCLUDED PAVING NOTCH BAR 8u1 WEIGHT IN ESTIMATED QUANTITIES TABLE.
4/1/2016 J44-(03, 05, 07, 09, 11, 13, 15, 17, 19)-14 INCLUDED PAVING NOTCH BAR 8u1 WEIGHT IN ESTIMATED QUANTITIES TABLE.
4/1/2016 1070-1079 Flume Chute Details - 3 to 12ft. Ht. CHANGED DESIGNATION TO "SL" IN "FLUME
DATA" FROM "S" TO ALLEVIATE CONFUSION WITH THE WORD "SPAN".
PPCB Data Sheet. This sheet VOID now Deleted. Beginning on 01-01-2016 it was
5/1/2016 1066A required to replace this sheet with the bid item note: Includes Contractor filling
out beam numbers by location and beam seat elevations in "PPC Beam Data
Spreadsheet" and forwarding electronic spreadsheet to the Engineer.
7/1/2016 1043s2 Culvert Extension Details. ADDED THE UPDATED DESIGN VERTICAL AND
HORIZONTAL EARTH PRESSURES IN THE GENERAL NOTES.
PRCB G1-13 ADDED THE UPDATED DESIGN VERTICAL AND HORIZONTAL EARTH
PRESSURES AND RENUMBERED THE GENERAL NOTES.
PRCB G2-13, PES 1-13-T1, PES 1-13-T3 CORRECTED TYPOS.
7/1/2016 PRCB G1-13, PRCB G2-13, PES 1-13-T1, PES 1-13-T3, PES 2-13-
PES 2-13-T3 CORRECTED TYPOS. ADDED DIM. “G” ALONG CENTERLINE OF
T3, PES 3-13-T3
SKEWED LINTLE BEAM.
PES 3-13-T3 CORRECTED TYPOS. ADDED DIM. “G” ALONG CENTERLINE OF
SKEWED LINTLE BEAM. ADDED TABLE FOR LENGTH “G”.
RCB G1-12: ADDED THE DESIGN VERTICAL AND HORIZONTAL EARTH PRESSURES
RCB G1-12, PWH 0-3-12, PWH 0-5-12 thru PWH 0-9-12, PWH AND RENUMBERED THE GENERAL NOTES. CHANGED DISTANCE IN NOTE #20
7/1/2016 15-3-12, PWH 15-5-12 thru PWH 15-9-12, PWH 30-3-12, PWH FROM 20 INCHES TO 18.
30-5-12 thru PWH 30-9-12, PWH 45-3-12 and PWH 45-5-12 PWH 0-3-12, PWH 15-3-12, PWH 30-3-12 and PWH 45-3-12: CHANGED 10”
thru PWH 45-9-12 VERTICAL DIMENSION FROM PERMISSIBLE WALL CONSTRUCTION JOINT TO 6s4
BAR. (DIMENSION WAS 1’-8 VERTICAL FROM TOP OF PARAPET TO 6s4 BAR).
PWH 0-5-12 thru PWH 0-9-12, PWH 15-5-12 thru PWH 15-9-12, PWH 30-5-12 thru
PWH 30-9-12 and PWH 45-5-12 thru PWH 45-9-12: CHANGED FENCE ANCHOR BAR
(5fa) FROM 3’-1 TO 2’-10.
TRRCB G1-12: ADDED THE DESIGN VERTICAL AND HORIZONTAL EARTH PRESSURES
AND RENUMBERED THE GENERAL NOTES. CHANGED DISTANCE IN NOTE #20
FROM 20 INCHES TO 18.
7/1/2016 TRRCB G1-12, TRH 0-4-12, TRH 15-6-12 , TRH 30-6-12 and TRH 0-4-12: REMOVED 1’-8 VERTICAL DIMENSION FROM 6s3 BAR TO TOP OF
TRH 45-9-12 PARAPET. THIS ALLOWS FOR THE VARIABLE VERTICAL LOCATION OF THE
HORIZONTAL LEG IN THE SLAB. THIS VARIANCE IN LOCATION IS CAUSED BY THE
DIFFERING WING SIZES OF DIFFERENT SIZED R.C.B. CULVERTS.
TRH 15-6-12, TRH 30-6-12 and TRH 45-6-12: REMOVED 1’-8 VERTICAL DIMENSION
FROM 6s5 & 6s6 BARS TO TOP OF PARAPET. THIS ALLOWS FOR THE VARIABLE
VERTICAL LOCATION OF THE HORIZONTAL LEG IN THE SLAB. THIS VARIANCE IN
LOCATION IS CAUSED BY THE DIFFERING WING SIZES OF DIFFERENT SIZED R.C.B.
CULVERTS.
1020SF: CHANGED 5c1 BAR LENGTH TO 7'-5 (IT WAS 5'-11 IN ERROR). 1029E &
1029F: CHANGED THE BRIDGE APPROACH PAVEMENT STANDARD TO "BR" (WAS
9/1/2016 1020SF, 1029E, 1029F, 1030As1, 1030As2 "RK-20") AND CORRECTED TYPOS. 1030As1: ADDED STANDARD SPECIFICATIONS
4158.02,B,2 IN LIGHTING NOTES AND CHANGED BAR MARK FROM "x" TO "p".
1030As2: ADDED CONDUIT SUPPORT RAIL DETAIL TO KEEP CONDUIT ISOLATED
FROM THE STAINLESS STEEL REINFORCING.
9/1/2016 1007D, 1007E CHANGED THE BRIDGE APPROACH PAVEMENT STANDARD TO "BR" (WAS "RK").
H24-(50, 57, 64, 71)-06: CHANGED PIER COLUMN CAP AND FOOTING BEVELED
KEYWAY TO 3" x 10" (WAS 2" x 8"). H24-(51 thru 56, 58 thru 63, 72 thru 77)-06:
9/1/2016 H24-50-06 thru H24-77-06, H24-81-06 thru H24-84-06 CHANGED VERTICAL CLEARANCE OF REBAR "f2" TO TOP OF PIER FOOTING TO 3"
(WAS 2"). H24-(81 thru 84)-06: CHANGED THE BRIDGE APPROACH PAVEMENT
STANDARD TO "BR" (WAS "RK-20").
9/1/2016 J24-44-06, J24-45-06 CHANGED THE BRIDGE APPROACH PAVEMENT STANDARD TO "BR" (WAS "RK-20").
J40-20-14: CORRECTED REFERENCE TO OPEN RAIL SHEET J40-48-14 (IT WAS J40-
9/1/2016 J40-(20, 47, 52, 53)-14 48-06 IN ERROR). J40-47-14: REMOVED "NOTE: REINFORCING STEEL QUANTITIES
ARE INCLUDED ON THE SUMMARY QUANTITIES SHEET." J40-(52, 53)-14 :
CHANGED THE BRIDGE APPROACH PAVEMENT STANDARD TO "BR" (WAS "RK-20").
J44-20-14: CORRECTED REFERENCE TO OPEN RAIL SHEET J44-48-14 (IT WAS J44-
9/1/2016 J44-(20, 47, 52, 53)-14 48-06 IN ERROR). J44-47-14: REMOVED "NOTE: REINFORCING STEEL QUANTITIES
ARE INCLUDED ON THE SUMMARY QUANTITIES SHEET." J44-(52, 53)-14 :
CHANGED THE BRIDGE APPROACH PAVEMENT STANDARD TO "BR" (WAS "RK-20").
10/1/2016 1054 Aesthetic Deck Drain Details. ADDED 1/4 " FILLET WELD CALLOUT TO DRAIN TUBE
IN "PART SECTION A-A" STEEL BEAM DETAIL.
10/1/2016 4305 30ft. Rdwy. Welded Girder Cross Section - LRFD Design. ADDED A DECK BAR THAT
WAS MISSING IN DETAIL "HALF SECTION NEAR ABUTMENT".
10/1/2016 H24-(06, 12, 19, 26)-06 REMOVED SECTION DIRECTORS “C-C” FROM PART SECTION B-B, THEY WERE VOID
BECAUSE THERE WAS NO SECTION C-C DETAIL.
10/1/2016 H24-(50, 57, 64, 71)-06 CHANGED BEVELED KEYWAY LENGTH OF PIER COLUMN CAP AND FOOTING TO BE
5'-0 LESS THAN WIDTH OF PIER COLUMN.
10/1/2016 J44-(20, 39 thru 42)-06 ADDED 4 3/8” DIMENSION THAT WAS MISSING IN “SECTION NORMAL TO
ABUTMENT AT CENTERLINE” DETAIL.
UPDATED SPECIFICATIONS DESIGN: AASHTO LRFD (WAS 4th ED., SERIES OF 2007)
(CONSTRUCTION, SERIES 2012). UPDATED DESIGN STRESSES: AASHTO LRFD (WAS
10/1/2016 RS40-002-10 4th ED., SERIES OF 2007), DECK & SUBSTRUCTURE CONCRETE (WAS SECTION 5, f'c
= 4,000 PSI.). REMOVED REFERENCE TO BRIDGE DESIGN MANUAL CADD NOTE
E177. REMOVED REFERENCE TO “PIERS” IN STEEL “H” PILE NOTES. ADDED
WEATHERING STEEL NOTE STATING BEAM FABRICATED FOR DEAD LOAD FIT.
10/1/2016 RS40-(031 thru 035)-10 UPDATED ESTIMATED QUANTITY STRUCTURAL STEEL WEIGHT TO INCLUDE SHEAR
STUDS AND DIAPHRAGMS.
10/1/2016 RS40-041-10 ADDED DIAPHRAGMS TO SKEWED FRAMING PLAN IN OUTER BAYS, BETWEEN
BEAMS 1 & 2 AND 5 & 6 OF 64'-0 CENTER SPAN, 6'-0 FROM PIER CENTERLINES.
10/1/2016 RS40-082-10 UPDATED DIAPHRAGM WEIGHTS FOR BRIDGE LENGTHS 160'-0 TO 220'-0 WITH 10,
20 AND 30 DEGREE SKEWS.
10/1/2016 RS40-(091, 092)-10 UPDATED LI-104 JUNCTION BOX DETAIL.
CHANGED BEVELED KEYWAY IN PIER COLUMN CAP AND FOOTING TO 3” x 10”
10/1/2016 RS40-(116, 136, 136, 146, 156)-10 (WAS 2” x 8”). Keyway length was adjusted to measure 5’-0 less than the width of
the pier column.
10/1/2016 RS40-(118, 121, 124, 128, 131, 134, 138, 141, 144, 148, 151, CHANGED VERTICAL CLEARANCE OF REBAR "f2" TO TOP OF PIER FOOTING TO 3"
154, 158, 161, 164)-10 (WAS 2").
10/1/2016 RS40-(173 thru 176)-10 CHANGED THE BRIDGE APPROACH PAVEMENT STANDARD TO “BR” (WAS “RK”).
11/1/2016 1043s2 Culvert Extension Details. ADDED THE WORD "THEREFORE" TO THE PARAGRAPH
STATING THE HIGHWAY WILL NOT BE CLOSED, IN THE GENERAL NOTES.
12/1/2016 B24-16 ADDED NEW 24'-0 SINGLE SPAN CONCRETE BOX BEAM STANDARDS.
12/1/2016 B30-16 ADDED NEW 30'-0 SINGLE SPAN CONCRETE BOX BEAM STANDARDS.
12/1/2016 RCB G2-12, TWRCB G2-12, TRRCB G2-12 EDITED KEYWAY NOTES IN PLAN VIEWS AND CORRECTED TYPOS.
2/1/2017 1092 CIP Culvert Revetment Protection Details. ADDED SECTION DIRECTORS "A-A" TO
ZERO SKEW PLAN VIEW DETAIL.
2/1/2017 PWH 45-2-12 CORRECTED TYPO. (RCB-G1-12 WAS RCB-G1-11 IN ERROR).
UPDATED SPECIFICATIONS DESIGN: AASHTO LRFD (WAS 4th ED., SERIES OF 2007)
(CONSTRUCTION, SERIES 2012). UPDATED DESIGN STRESSES: AASHTO LRFD (WAS
2/1/2017 RS40-002-14 4th ED., SERIES OF 2007), DECK & SUBSTRUCTURE CONCRETE (WAS SECTION 5, f'c
= 4,000 PSI.). REMOVED REFERENCE TO BRIDGE DESIGN MANUAL CADD NOTE
E177. REMOVED REFERENCE TO “PIERS” IN STEEL “H” PILE NOTES. ADDED
WEATHERING STEEL NOTE STATING BEAM FABRICATED FOR DEAD LOAD FIT.
2/1/2017 RS40-041-14 ADDED DIAPHRAGMS TO SKEWED FRAMING PLAN IN OUTER BAYS, BETWEEN
BEAMS 1 & 2 AND 5 & 6 OF 64'-0 CENTER SPAN, 6'-0 FROM PIER CENTERLINES.
2/1/2017 RS40-(072 thru 080)-14 CHANGED NOTE STATING “MISCELLANEOUS DETAILS (pertinent length) BRIDGE”
(WAS 160’-0 IN ERROR).
ADDED 4 SHEAR STUDS AT “CENTERLINE OF BOLTED SPLICE” LOCATION BETWEEN
2/1/2017 RS40-(075, 076, 077)-14 “ZONES C & D”. ADDED "SHEAR STUD ON SPLICE PLATE DETAILS" SHOWING 2
STUDS PER ROW.
2/1/2017 RS40-082-14 UPDATED DIAPHRAGM WEIGHTS FOR BRIDGE LENGTHS 160'-0 TO 220'-0 WITH 10,
20 AND 30 DEGREE SKEWS.
REMOVED ALL CONDUIT, JUNCTION BOX DETAILS AND LIGHTING NOTES. ADDED
NOTES STATING "SEE STANDARD SHEET 1030As1 AND 1030As2 FOR JUNCTION
2/1/2017 RS40-(091, 092)-14 BOX DETAILS AND LIGHTING NOTES, REINFORCING AND DETAILS REGARDING
REINFORCING AND THE PLACEMENT OF CONDUIT AND JUNCTION BOXES IN
BARRIER RAILS WITH STAINLESS STEEL REINFORCING".
2/1/2017 RS40-(118, 121, 124, 128, 131, 134, 138, 141, 144, 148, 151, CHANGED VERTICAL CLEARANCE OF REBAR "f2" TO TOP OF PIER FOOTING TO 3"
154, 158, 161, 164)-14 (WAS 2").
2/1/2017 RS40-(173 thru 176)-14 CHANGED THE BRIDGE APPROACH PAVEMENT STANDARD TO “BR” (WAS “RK”).
3/1/2017 100-RR Index of Repair Retrofit Bridge Standards. ISSUED STANDARD SHEETS 1055,
1057s1 AND 1057s2. STANDARD SHEETS 1039s1 & 1039s2 NOW VOID.
Retrofit Rail Details, Deck Repair & Re-overlay Deck Repair Quantities. MODIFIED
3/1/2017 1031T, 1038, 1038R CONSTRUCTION: STANDARD SPECIFICATIONS BRIDGE CONSTRUCTION, SERIES TO
2015, (WAS 2012).
3/1/2017 1039s1, 1039s2 Deck Repair Notes. THESE SHEETS VOID, SEE BRIDGE DESIGN MANUAL FOR
CURRENT NOTES.
Deck Repair & Re-overlay Deck Repair Details. CHANGED REFERENCE TO ROAD
3/1/2017 1040, 1040R STANDARD BR-111. (WAS RK-17). CHANGED NOTE STATING "EXISTING 1/4 "
RESILIENT JOINT FILLER TO BE U.A.C." (WAS PREFORMED JOINT FILLER).
Deck Repair - Approach Pavement. CHANGED NOTE STATING " 1" RESILIENT
3/1/2017 1042 EXPANSION JOINT MATERIAL BY THE BRIDGE CONTRACTOR" (WAS PREFORMED
EXPANSION JOINT FILLER).
3/1/2017 1055, 1057s1, 1057s2 Prestressed Concrete Beam End Repair & Prestressed Concrete Beam FRP Repair
Details. THESE SHEETS ISSUED.
Precast Extension of CIP Culvert Details. CHANGED REFERENCE TO 6w1 & 6w2
BARS ( WAS 6x1 & 6x2 ). ADDED 6w3 BAR AND DETAILS. MODIFIED "PART
3/1/2017 1044P REMOVAL PLAN" DETAILS TO SHOW ADDITIONAL 1'-6 REMOVAL OF EXISTING
R.C.B. FOOTING. ADDED NOTE STATING 2 INCH CLEARANCE FROM FACE OF
CONCRETE TO FACE OF REINFORCING.
3/1/2017 1081P Precast Culvert General Notes. CHANGED BID ITEM REFERENCES TO "SPECIAL
BACKFILL" ( WAS "GRANULAR BACKFILL" ).
Precast Culvert Extension and General Notes. REMOVED REFERENCE "TO THE
OFFICE OF BRIDGES AND STRUCTURES" IN NOTE STATING TO SUBMIT DETAILS OF
4/1/2017 1043P, 1081P PROPOSED PRECAST BOX SECTIONS. ADDED NOTE STATING "SHOP DRAWINGS
SHALL BE SUBMITTED WITH THE FOLLOWING NAMING CONVENTION".
(Paren)_County_DesignNumber_SubmittalDescription.pdf Example:
(090)_BlackHawk_Design915_DeckDrains.pdf
6/1/2017 1035A Temporary Detour Bridge - Single Span - Wood Piles. CORRECTED TYPOS.
Temporary Detour Bridge - Single Span - Steel Piles. ADDED “PIER CAPS” TO ITEMS
6/1/2017 1035D THAT ARE TO BE HAULED TO WILLIAMS AFTER DETOUR BRIDGE IS NO LONGER
NEEDED.
Beam Camber & Deck Thickness Details. REMOVED CENTER 6b BAR FROM UNDER
6/1/2017 1065 "#4 BAR IN BEAM" IN "SECTION THRU SLAB HAUNCH" DETAIL. (WAS THREE 6b
BARS NOW TWO).
BNSF & UPRR General Notes & Shoring. ADDED NOTE OUTSIDE OF SHEET BORDER
6/1/2017 1067 TO EXPLAIN THE USE OF THIS STANDARD SHEET WITH ARCHIVED METHODS
MEMO MM201.
6/1/2017 1069 Hydrodemolition Notes. UPDATED REFERENCES TO BRIDGE DECK (WAS BRIDGE
FLOOR).
7/1/2017 SCST-(00 thru 09)-17 NEW STEEL CANTILEVER SIGN TRUSS STANDARDS.
MODIFIED NOTES. CHANGED CALLOUT "SIMILAR TO DETAIL A" ( WAS "DETAIL D" )
7/1/2017 SOST-(02 thru 05)-11 TO CONFORM TO CHANGE OF DETAIL D ON SOST-08-11. REFERENCE TO DETAIL D
WAS REMOVED FROM "SEE STANDARD SHEET ...." NOTE.
MODIFIED NOTES. CHANGED CALLOUT "DETAIL D" ( WAS "SIMILAR TO DETAIL D" )
7/1/2017 SOST-(06 thru 07)-11 TO CONFORM TO CHANGE OF DETAIL D ON SOST-08-11. ADDED DELTA SYMBOL
TO 1" CONDUIT CALLOUT. IN "BASE SIDE VIEW" ADDED "JAM NUT" CALLOUTS.
7/1/2017 SOST-09-11 MODIFIED NOTES. CORRECTED DEPICTIONS OF VIEWS D-D AND E-E TO PROPERLY
COINCIDE WITH DETAILS F AND G.
7/1/2017 SOST-14-11 CORRECTED WELD SIZE IN VIEW Q-Q TO 3/16" (WAS 1/4") TO MATCH THAT
SHOWN IN OTHER DETAILS.
7/1/2017 SOST-15-11 MODIFIED NOTE.
7/1/2017 SOST-16-11 MODIFIED FORMATTING OF CALLOUTS.
Precast Culvert Extension and General Notes. CHANGED AND REMOVED NOTES
REFERING TO APPROVAL OF NONSTANDARD DETAILS THAT ARE DESIGNED AND
SEALED BY A PROFESSIONAL ENGINEER. ADDED NOTE "THE PRECAST BOX
CULVERT AND EXTENSION SHALL BE BUILT TO THE DIMENSIONS AND
4/1/2018 1043P, 1081P SPECIFICATIONS SHOWN IN THESE PLANS." CHANGED CLASSIFICATION OF 6"
BEDDING UNDER THE BARREL DETAILS TO "SPECIAL BACKFILL". (WAS REFERRED
TO AS GRANULAR MATERIAL OR GRANULAR BEDDING.) REMOVED FROM
GENERAL NOTES "THE 6 INCH GRANULAR BEDDING SHALL BE BID AS SPECIAL
BACKFILL."
Precast Prestressed Concrete Deck Panel Max. Clear Span = 7'-0". MOVED
4/1/2018 1037 DIMENSION TEXT IN 8'-0 DECK PANEL DETAIL. IT WAS OVERLAPPED BY DIMENSION
LINE.
Precast Prestressed Concrete Deck Panel Min. Clear Span = 7'-0" to Max. CL. Span
4/1/2018 1037B = 10'-0". CORRECTED DETAIL B CALL-OUT CIRCLE LOCATION. MOVED DIMENSION
TEXT IN 8'-0 DECK PANEL DETAIL. IT WAS OVERLAPPED BY DIMENSION LINE.
30, 40, 44ft. & (40ft. Symm. Crown) Rdwy. Welded Girder Cross Section - LRFD
Design. REMOVED LAST PART OF NOTE IN THE FIRST SENTENCE OF THE "TYP.
DECK & HAUNCH DETAIL" (WAS "AS SHOWN ON THE "THEORETICAL CONCRETE
7/1/2018 4305, 4308, 4309, 4310 HAUNCH DIAGRAM" SHOWN ELSEWHERE ON THESE PLANS." ). CHANGED NOTE
STATING " 1/2" RESILIENT JOINT FILLER" (WAS PREFORMED EXPANSION JOINT
FILLER).
Part Plan & Longit. Sect. B, C or D Beams Stub. Abut. 0-30 Degree Skew, LA & RA.
7/1/2018 4542, 4543, 4544, 4545, 4546, 4547, 4548 ADDED "WASH SURFACES" AND LEADER LINE TO "CONCRETE SEALER LIMITS"
DETAIL.
30, 40, 44ft.& (40ft. Symm. Crown) Rdwy. PPCB (B, C & D Beams-Stub Abut.) Cross
7/1/2018 4556, 4559, 4560, 4561 Sect.-LRFD Design. CHANGED NOTE STATING " 1/2" RESILIENT JOINT FILLER" (WAS
PREFORMED EXPANSION JOINT FILLER).
8/1/2018 RS40-10 (ALL SHEETS) UPDATED BRIDGE ENGINEER SIGNATURE.
ADDED RS40-177-10 "TEMPORARY DECK OVERHANG BRACKET AND BRACING
8/1/2018 RS40--001-10 SYSTEM" AND REORGANIZED SHEET LISTINGS. UPDATED BRIDGE ENGINEER
SIGNATURE.
REVISED INTERMEDIATE & PIER DIAPHRAGM SIZES & BOLTED CONNECTION DTLS.
8/1/2018 RS40-081-10 FOR BRIDGE LENGTHS 200'-0 TO 340'-0, ADDED SECTION D-D. UPDATED BRIDGE
ENGINEER SIGNATURE.
UPDATED DIAPHRAGM WEIGHTS FOR BRIDGE LENGTHS 200'-0 TO 340'-0 FOR ALL
8/1/2018 RS40-082-10 SKEWS. UPDATED BRIDGE ENGINEER SIGNATURE.
REVISED INTERMEDIATE & PIER DIAPHRAGM SIZES & BOLTED CONNECTION DTLS.
8/1/2018 RS40-081-14 FOR BRIDGE LENGTHS 200'-0 TO 340'-0, ADDED SECTION D-D. UPDATED BRIDGE
ENGINEER SIGNATURE.
UPDATED DIAPHRAGM WEIGHTS FOR BRIDGE LENGTHS 200'-0 TO 340'-0 FOR ALL
8/1/2018 RS40-082-14 SKEWS. UPDATED BRIDGE ENGINEER SIGNATURE.
ADDED NOTES INCLUDING BID ITEM NOTE TO IMPROVE CLARITY. NEW BID ITEM
LIST INCLUDES TWO SPECIAL BID ITEMS ("ANCHOR BOLT ASSEMBLY--FURNISH"
AND "ANCHOR BOLT ASSEMBLY--INSTALL AND SURVEY") TO CLARIFY
3/1/2019 SCST-09-17 CONTRACTOR RESPONSIBILITY TO ACCURATELY INSTALL ANCHOR BOLT ASSEMBLY.
REORDERED NOTES TO IMPROVE READABILITY. MODIFIED ALTERNATE 6c1 SHAFT
CIRCULAR TIES TO INCLUDE 135° HOOKS.
3/1/2019 SOST-02-11 REPLACED NOTE IDENTIFIER ASTRISK WITH ENCIRCLED NUMBER TO IMPROVE
READABILITY. UPDATED BRIDGE ENGINEER SIGNATURE.
3/1/2019 SOST-03-11, SOST-04-11, SOST-05-11 UPDATED BRIDGE ENGINEER SIGNATURE.
CORRECTED DIMENSIONS SHOWN FOR L 3" x 3" x 3/8" IN TYPICAL SIGN PANEL
SECTION AND SECTION F-F. REMOVED NONESSENTIAL WASHER UNDER BOLT
3/1/2019 SOST-11-11 HEAD IN SECTION F-F. REPLACED NOTE IDENTIFIER ASTRISKS WITH ENCIRCLED
NUMBERS TO IMPROVE READABILITY. UPDATED BRIDGE ENGINEER SIGNATURE.
MODIFIED VIEW P-P FASTENER NOTE AND 1/2" DIA. ROD DESCRIPTION TO
3/1/2019 SOST-14-11 ADDRESS CHANGES IN ASTM SPECIFICATIONS. CORRECTED VIEW Q-Q CALLOUT
FROM 2 1/2" DIA. x 1/4" TUBE TO 2" DIA. STANDARD STEEL PIPE. UPDATED
BRIDGE ENGINEER SIGNATURE.
3/1/2019 SOST-16-11 MODIFIED SECTION V-V FASTENER NOTE TO ADDRESS CHANGE IN ASTM
SPECIFICATIONS. UPDATED BRIDGE ENGINEER SIGNATURE.
3/1/2019 SOST-19-11 THIS SHEET ISSUED 03-2019. (THE ORIGINAL SHEET SOST-19-11 WHICH WAS
ISSUED 03-2013 WAS RENAMED SOST-20-11.)
7/1/2019 100-M Index of Misc. Bridge Standards. CHANGED STANDARDS 1065 & 1066 TITLES
REFERING TO "SLAB" TO "DECK".
7/1/2019 1065, 1066 Beam Camber, Deck Thickness and Haunch Data Details. CHANGED ALL
REFERENCES OF "SLAB" TO "DECK".
BNSF & UPRR General Notes & Shoring. FOR UPRR, CHANGED HORIZONTAL
7/1/2019 1067 DISTANCE OF MINIMUM CONSTRUCTION CLEARANCE ENVELOPE TO 15'-0" (WAS
12'-0").
Paving Notch Replacement. CHANGED BENT ENDS (HOOK LEG) OF 5k1 BAR TO 6"
7/1/2019 1068 (WAS 4 1/2"). CHANGED ALL REFERENCES OF "SLAB" TO "DECK".
4/1/2020 SCST-02-17 CLARIFIED THAT 17'-6 MINIMUM CLEARANCE IS FROM HIGH POINT OF PAVEMENT
BELOW SIGN TO BOTTOM OF SIGN SUPPORT ANGLES.
7/1/2020 RCB G1,G2,G3-20, RCB 3-3-20 thru RCB 16-14-20, PWH 0-1-20 NEW ISSUE SINGLE REINFORCED CONCRETE BOX STANDARDS (WITH UPDATED
thru PWH 45-11-20, CBJ 1-20 thru CBJ 5-20 PARALLEL WING HEADWALLS).
TWRCB G1,G2,G3-20, TWRCB 8-4-20 thru TWRCB 12-12-20, NEW ISSUE TWIN REINFORCED CONCRETE BOX STANDARDS (WITH UPDATED
7/1/2020 TWPWH 0-1-20 thru TWPWH 45-9-20, TWCBJ 1-20 thru
TWCBJ 3-20 PARALLEL WING HEADWALLS).
TRRCB G1,G2,G3-20, TRRCB 10-4-20 thru TRRCB 12-12-20, NEW ISSUE TRIPLE REINFORCED CONCRETE BOX STANDARDS (WITH UPDATED
7/1/2020 TRPWH 0-1-20 thru TRPWH 45-7-20, TRCBJ 1-20 thru TRCBJ 3- PARALLEL
20 WING HEADWALLS).
8/1/2020 J40-(47, 48)-06 UPDATED BRIDGE ENGINEER SIGNATURE. CHANGED SECTION A-A (WAS VIEW A-
A).
8/1/2020 J40-14 UPDATED BRIDGE ENGINEER SIGNATURE.
UPDATED BRIDGE ENGINEER SIGNATURE. ADDED 3 3/8" (TYP.) & 5 3/8" (TYP.)
8/1/2020 J40-(02, 04, 06, 08, 10, 12, 14, 16, 18)-14 HORIZONTAL DIMENSIONS TO LONGITUDINAL SLAB REINFORCING LINES D & E IN
"HALF SECTION NEAR PIER".
8/1/2020 J40-(47, 48)-14 UPDATED BRIDGE ENGINEER SIGNATURE. CHANGED SECTION A-A (WAS VIEW A-
A).
8/1/2020 J44-06 UPDATED BRIDGE ENGINEER SIGNATURE.
UPDATED BRIDGE ENGINEER SIGNATURE. ADDED 3 3/8" (TYP.) & 5 3/8" (TYP.)
8/1/2020 J44-(02, 04, 06, 08, 10, 12, 14, 16, 18)-06 HORIZONTAL DIMENSIONS TO LONGITUDINAL SLAB REINFORCING LINES D & E IN
"HALF SECTION NEAR PIER".
8/1/2020 J44-21-06 UPDATED BRIDGE ENGINEER SIGNATURE. CORRECTED BAR LENGTH ON 6c2 & 5d2
BAR (WAS 21'-3).
8/1/2020 J44-(47, 48)-06 UPDATED BRIDGE ENGINEER SIGNATURE. CHANGED SECTION A-A (WAS VIEW A-
A).
8/1/2020 J44-14 UPDATED BRIDGE ENGINEER SIGNATURE.
UPDATED BRIDGE ENGINEER SIGNATURE. ADDED 3 3/8" (TYP.) & 5 3/8" (TYP.)
8/1/2020 J44-(02, 04, 06, 08, 10, 12, 14, 16, 18)-14 HORIZONTAL DIMENSIONS TO LONGITUDINAL SLAB REINFORCING LINES D & E IN
"HALF SECTION NEAR PIER".
8/1/2020 J44-21-14 UPDATED BRIDGE ENGINEER SIGNATURE. CORRECTED BAR LENGTH ON 6c2 & 5d2
BAR (WAS 21'-3).
UPDATED BRIDGE ENGINEER SIGNATURE. REMOVED NOTE STATING "ALL BARRIER
8/1/2020 J44-45-14 RAIL REINFORCING STEEL IS TO BE INCLUDED WITH THE SUPERSTRUCTURE
REINFORCING STEEL."
8/1/2020 J44-(47, 48)-14 UPDATED BRIDGE ENGINEER SIGNATURE. CHANGED SECTION A-A (WAS VIEW A-
A).
(PT-G1&G2-20), (PT-RCB 12-11-20 thru PT-RCB 14-12-20), (PT-
8/1/2020 FWH 0-1 thru 4-20), (PT-CBJ 1&2-20), (PT SR 1&2-20), (PT AD NEW ISSUE SIGNED CIP PEDESTRIAN TUNNEL STANDARDS
1&2-20)
8/1/2020 (PPT-G1 thru G3-20), (PPT-RCB 12&14-20), (PPT-FWH 0-1 thru NEW ISSUE SIGNED PRECAST PEDESTRIAN TUNNEL STANDARDS
5-20), (PPT-SR 1&2-20), (PPT AD 1&2-20)
8/1/2020 7001, 7010, 7011, 7012 Pedestrian Tunnel Details. NEW ISSUE CIP PEDESTRIAN TUNNEL WORKSHEETS
8/1/2020 7001P, 7010P, 7020P Precast Pedestrian Tunnel Details. NEW ISSUE PRECAST PEDESTRIAN TUNNEL
WORKSHEETS
9/1/2020 J30-06 UPDATED BRIDGE ENGINEER SIGNATURE.
UPDATED BRIDGE ENGINEER SIGNATURE. ADDED 3 3/8" (TYP.) & 5 3/8" (TYP.)
J30-(02B, 02E, 04B, 04E, 06B, 06E, 08B, 08E, 10B, 10E, 12B, HORIZONTAL
9/1/2020 DIMENSIONS TO LONGITUDINAL SLAB REINFORCING LINES D & E IN
12E, 14B, 14E, 16B, 16E, 18B, 18E)-06 "HALF SECTION NEAR PIER".
J30-(03B, 03E, 05B, 05E, 07B, 07E, 09B, 09E, 11B, 11E, 13B, UPDATED BRIDGE ENGINEER SIGNATURE. CHANGED PAVING BLOCK LIFTING
9/1/2020 13E, 15B, 15E, 17B, 17E, 19B, 19E)-06 and J30-(21, 22, 27-29, HOOP
31, 34-37)-06 BAR MARK, (WAS 5x1).
9/1/2020 J30-(42, 43)-06 UPDATED BRIDGE ENGINEER SIGNATURE. CHANGED SECTION A-A (WAS VIEW A-
A).
12/1/2020 (RCF 01-20 thru RCF 04-20), (RCFB 01-20 thru RCFB 11-20), NEW UPDATED ISSUE SIGNED FLUME STANDARDS. REPLACES APRIL 2012
(FBJ 01-20 thru FBJ 09-20) VERSION.
Office of Bridge & Structures - Standard Revisions and Updates 2021
1/1/2021 1073P Precast Culvert Parapet to CIP Flume Details. ADDED 14'-0 AND 16'-0 SPANS.
1/1/2021 1060, 1061 Culvert Baffle and Weir Details. UPDATED 4h BAR LAPS PER AASHTO LRFD 8TH ED.
Flume Chute Details - 3ft. Ht. UPDATED TO STANDARD SHEET 1070-03 (THIS
SHEET WAS 1070). UPDATED BAR LAPS PER AASHTO LRFD 8TH ED. CHANGED THE
1/1/2021 1070-03 REFERENCE TO STANDARD
SHEETS RCF 1-20 & RCF 2-20 IN THE NOTES (WAS RCF-01-12 & RCF-02-12), AND
FBJ ??-20 & RCFB ??-20 (WAS FBJ-??-12 & RCFB-??-12).
Flume Chute Details - 4ft. Ht. UPDATED TO STANDARD SHEET 1070-04 (THIS
SHEET WAS 1071). UPDATED BAR LAPS PER AASHTO LRFD 8TH ED. CHANGED THE
1/1/2021 1070-04 REFERENCE TO STANDARD
SHEETS RCF 1-20 & RCF 2-20 IN THE NOTES (WAS RCF-01-12 & RCF-02-12), AND
FBJ ??-20 & RCFB ??-20 (WAS FBJ-??-12 & RCFB-??-12).
Flume Chute Details - 5ft. Ht. UPDATED TO STANDARD SHEET 1070-05 (THIS
SHEET WAS 1072). UPDATED BAR LAPS PER AASHTO LRFD 8TH ED. CHANGED THE
1/1/2021 1070-05 REFERENCE TO STANDARD
SHEETS RCF 1-20 & RCF 2-20 IN THE NOTES (WAS RCF-01-12 & RCF-02-12), AND
FBJ ??-20 & RCFB ??-20 (WAS FBJ-??-12 & RCFB-??-12).
Flume Chute Details - 6ft. Ht. UPDATED TO STANDARD SHEET 1070-06 (THIS
SHEET WAS 1073). UPDATED BAR LAPS PER AASHTO LRFD 8TH ED. CHANGED THE
1/1/2021 1070-06 REFERENCE TO STANDARD
SHEETS RCF 1-20 & RCF 2-20 IN THE NOTES (WAS RCF-01-12 & RCF-02-12), AND
FBJ ??-20 & RCFB ??-20 (WAS FBJ-??-12 & RCFB-??-12).
Flume Chute Details - 7ft. Ht. UPDATED TO STANDARD SHEET 1070-07 (THIS
SHEET WAS 1077). UPDATED BAR LAPS PER AASHTO LRFD 8TH ED. CHANGED THE
1/1/2021 1070-07 REFERENCE TO STANDARD
SHEETS RCF 1-20 & RCF 2-20 IN THE NOTES (WAS RCF-01-12 & RCF-02-12), AND
FBJ ??-20 & RCFB ??-20 (WAS FBJ-??-12 & RCFB-??-12).
Flume Chute Details - 8ft. Ht. UPDATED TO STANDARD SHEET 1070-08 (THIS
SHEET WAS 1074). UPDATED BAR LAPS PER AASHTO LRFD 8TH ED. CHANGED THE
1/1/2021 1070-08 REFERENCE TO STANDARD
SHEETS RCF 1-20 & RCF 2-20 IN THE NOTES (WAS RCF-01-12 & RCF-02-12), AND
FBJ ??-20 & RCFB ??-20 (WAS FBJ-??-12 & RCFB-??-12).
Flume Chute Details - 9ft. Ht. UPDATED TO STANDARD SHEET 1070-09 (THIS
SHEET WAS 1078). UPDATED BAR LAPS PER AASHTO LRFD 8TH ED. CHANGED THE
1/1/2021 1070-09 REFERENCE TO STANDARD
SHEETS RCF 1-20 & RCF 2-20 IN THE NOTES (WAS RCF-01-12 & RCF-02-12), AND
FBJ ??-20 & RCFB ??-20 (WAS FBJ-??-12 & RCFB-??-12).
Flume Chute Details - 10ft. Ht. UPDATED TO STANDARD SHEET 1070-10 (THIS
SHEET WAS 1075). UPDATED BAR LAPS PER AASHTO LRFD 8TH ED. CHANGED THE
1/1/2021 1070-10 REFERENCE TO STANDARD
SHEETS RCF 1-20 & RCF 2-20 IN THE NOTES (WAS RCF-01-12 & RCF-02-12), AND
FBJ ??-20 & RCFB ??-20 (WAS FBJ-??-12 & RCFB-??-12).
Flume Chute Details - 11ft. Ht. UPDATED TO STANDARD SHEET 1070-11 (THIS
SHEET WAS 1079). UPDATED BAR LAPS PER AASHTO LRFD 8TH ED. CHANGED THE
1/1/2021 1070-11 REFERENCE TO STANDARD
SHEETS RCF 1-20 & RCF 2-20 IN THE NOTES (WAS RCF-01-12 & RCF-02-12), AND
FBJ ??-20 & RCFB ??-20 (WAS FBJ-??-12 & RCFB-??-12).
Flume Chute Details - 12ft. Ht. UPDATED TO STANDARD SHEET 1070-12 (THIS
SHEET WAS 1076). UPDATED BAR LAPS PER AASHTO LRFD 8TH ED. CHANGED THE
1/1/2021 1070-12 REFERENCE TO STANDARD
SHEETS RCF 1-20 & RCF 2-20 IN THE NOTES (WAS RCF-01-12 & RCF-02-12), AND
FBJ ??-20 & RCFB ??-20 (WAS FBJ-??-12 & RCFB-??-12).
1/1/2021 1070-13, 1070-14 Flume Chute Details - 13 & 14ft. Ht. THIS SHEET ISSUED 01-2021.
Flume Chute Details - 3 to 12ft. Ht. THESE ARE OUTDATE AND HAVE BEEN
1/1/2021 1070, 1071, 1072, 1073, 1074, 1075, 1076, 1077, 1078, 1079
REPLACED WITH 1070-03 THRU 1070-12
NEW UPDATED ISSUE SIGNED SINGLE RCB CULVERT STANDARDS - FLARED WING
2/1/2021 FWH G1-21, FWH G2-21, FWH 0-1-21 thru FHW 45-13-21
HEADWALLS.
NEW UPDATED ISSUE SIGNED TWIN RCB CULVERT STANDARDS - FLARED WING
2/1/2021 TWFWH G1-21, TWFWH 0-1-21 thru TWFHW 45-9-21
HEADWALLS.
NEW UPDATED ISSUE SIGNED TRIPLE RCB CULVERT STANDARDS - FLARED WING
2/1/2021 TRFWH G1-21, TRFWH 0-1-21 thru TRFHW 45-8-21
HEADWALLS.
1043P, 1044P, 1045P, 1060P, 1061P, 1073P, 1081P, 1082P, Precast Culvert Details. Corrected typos. Renamed sheet 1073P (was "Precast
7/1/2021
1089P Parapet Details").
10/1/2021 PRCB G2-20 Updated Note 3.
10/1/2021 PRCB 14-20, PRCB 16-20 Updated Note 1 & Variable Dimension Table.
Updated curtain wall height. Updated wall thickness & inside wall reinforcing in
10/1/2021 PES 3-20-T1
Section Y-Y. Added note reference for floor thickness in Section Z-Z.
10/1/2021 PES 4-20-T1 Updated Note 7 & 8 and added Note 10.
10/1/2021 PES 1-20-T3 Updated lintel beam connection hole location in Plan View.
Updated curtain wall height & lintel beam connection hole location in Plan View.
10/1/2021 PES 3-20-T3 Updated wall thickness & inside wall reinforcing in Section Y-Y. Added note
reference for floor thickness in Section Z-Z.
10/1/2021 PES 4-20-T3 Updated Note 3 & 7 and added Note 10.
10/1/2021 PES 5-20-T3 Added lintel beam connection hole location in Plan View.
Updated curtain wall height & added lintel beam connection hole location in Plan
10/1/2021 PES 7-20-T3 View. Updated wall thickness & added note reference for floor thickness in End
View.
Updated Note 10 & 12 and added Note 14. Updated As4 Reinforcing Table for H =
10/1/2021 PES 8-20-T3
13'-0" & 14'-0".
Updated width dimension on Plan of Square Lintel Beam & Plan View of Skewed
10/1/2021 PES 10-20-T3
Lintel Beam.
Precast Culvert Extension and General Notes. Updated General Notes to remove
paragraph referring to "Approval of details is not required for projects that follow
10/1/2021 1043P, 1081P
the Standard Details ......". Updated to now only state "The Contractor shall allow
30 working days for the Engineer's Shop Drawing review."
Precast Culvert Design Method Details. Removed note referring to Loading, Design
10/1/2021 1089P Methods and Materials. Added minimum laying length note. Removed "check
boxes" in table for Iowa DOT Standard or Non-Standard Precast Box Option.
Index of Misc. Bridge Standards. NOW VOID ARE STANDARD SHEETS 1035, 1035A,
3/1/2022 100-M 1035B, 1035C, 1035D, 1035E AND 1069. STANDARD SHEETS 1035, 1035A, 1035B,
1035C, 1035D, 1035E WERE REMOVED FROM INDEX OF SHEETS.
3/1/2022 1035, 1035A, 1035B, 1035C, 1035D, 1035E Temporary Detour Bridge. THESE SHEETS ARE VOID.
BNSF & UPRR General Notes & Shoring. UPDATED "GENERAL EXCAVATION ZONES"
3/1/2022 1067 DETAIL AND "GENERAL SHORING NOTES" TO FOLLOW THE "UPRR & BNSF
GUIDELINES FOR TEMPORARY SHORING, 2021".
Precast Culvert Extension General Notes. Added "Note to Detailer to add CADD
8/1/2022 1043P Cell E65 to plan set" regarding addition of the "Working Drawing and Calculations
Submittals" table. This replaces the Shop Drawing Submittals Table.
Precast Culvert General Notes. Removed statement in the paragraph "The length
in linear feet of precast…..", (text was; "Class E Revetment", "Granular Leveling
Material", and ____.). Added statement in the paragraph "All costs including
8/1/2022 1081P material and labor…..", text added; "of the granular leveling material". Added
"Note to Detailer to add CADD Cell E65 to the plan set" regarding addition of the
"Working Drawing and Calculations Submittals" table. This replaces the Shop
Drawing Submittals table.
Updated Bridge Engineer Signature. Removed note stating "All open rail
reinforcing steel is to be included with the superstructure reinforcing steel."
8/1/2022 J24-41-06
Corrected Number of 6j1 bars for 130'-0. Changed number of 6h1 bars from 32 to
36 for bridge lengths of 80'-0, 90'-0, 100'-0, and 110'-0.
Office of Bridge & Structures - Standard Revisions and Updates 2023
1/1/2023 1045P Precast Extension of Precast Culvert Details. Added note to burr threads of
Concrete Box Ties to prevent nut rotation after tightening is complete.
Single Precast Reinforced Concrete Box Culverts - Typical Culvert Barrel Details.
PRCB G2-20, PES 2-20-T1, PES 4-20-T1, PES 2-20-T3, PES 4-20-
1/1/2023 Added note to burr threads of Concrete Box Ties to prevent nut rotation after
T3, PES 6-20-T3, PES 8-20-T3
tightening is complete.
Precast Pedestrian Tunnel General Notes & Quantities. Added Granular Leveling
Material requirements Section 4117 of Standard Specifications and note including
cost of material and labor associated with Granular Leveling Material. Updated
1/1/2023 7001P Granular Leveling Material Detail, was Special Backfill Material Detail. Removed
Special Backfill from notes and update Bridges and Structures Bureau terminology.
Removed Shop Drawing Submittals table and replaced with "Note to Detailer" to
add CADD Cell E65 "Working Drawing & Calc. Submittals" table to plan set.
7/1/2023 100-RR, 1031, 1031C, 1031D, 1031E, 1031F, 1031T, 1038, Repairs and Retrofits. This sheet re-issued. These were re-released to update
1038R, 1040, 1040R, 1042, 1045, 1055, 1057s1, 1057s2 CADD files to MicroStation CONNECT version format.
7/1/2023 100-FS, 1005, 1005A, 1006, 1006A, 1006B, 1006C, 1006D, Foreslope Protection. This sheet re-issued. These were re-released to update
1006E, 1007, 1007A, 1007B, 1007C, 1007D, 1007E CADD files to MicroStation CONNECT version format.
100-1, 2078, 2079, 2080, 2081, 2082, 2083, 8084, 2085, 2086,
Integral Abutments. This sheet re-issued. These were re-released to update
2087, 2088, 2089, 2090, 2091, 4380, 4383, 4384, 4385, 4500,
CADD files to MicroStation CONNECT version format and to show new single slope
9/1/2023 4501, 4502, 4503, 4504, 4505, 4506, 4507, 4508, 4509, 4510,
rail and increased deck thickness following the AASHTO LRFD Bridge Design
4511, 4512, 4513, 4514, 4515, 4516, 4517, 4518, 4519, 4520,
Specifications 9th Edition.
4521
100-S, 1059, 2092, 2093, 2094, 2095, 2096, 2097, 2098, 2099,
2100, 2101, 2102, 2103, 2104, 2105, 2106, 2107, 2108, 2109,
Stub Abutment. This sheet re-issued. These were re-released to update CADD
11/13/2023 4305, 4305A, 4308, 4309, 4310, 4542, 4543, 4544, 4545,
files to MicroStation CONNECT version format.
4546, 4547, 4548, 4549, 4550, 4551, 4552, 4553, 4556, 4559,
4560, 4561
Office of Bridge & Structures - Standard Revisions and Updates 2023
Beam Data Sheets. These sheets were revised with new epoxy coated 5b3 bars
replacing the uncoated 5b2 bars at the beam ends in the "Reinforcing Bar List"
6/12/2024 4600, 4610 and the Reinforcing Steel Quantities updated for the A42, A46, A50, and A55
beams. ***Notes were added referencing the lifting loop details being provided
on the individual A42, A46, A50, and A55 beam sheets.
Beams Detail Sheets. These sheets were revised with new epoxy coated 5b3 bars
4601-(A42 and A46), 4602-(A50 and A55), and 4612- replacing 5b2 sheets near the beam ends for the 4601-(A42 and A46), 4602-(A50
6/12/2024 (B55,B59,B63, and B67) and A55), and 4612-(B55, B59, B63, and b67. In addition, due to the new 5b3 bars,
revised lifting loop details were added to the individual beam sheets.
Beam Data Sheets. This sheet was revised with additional 4b1 added and 4b2
reduced in the "Reinforcing Bar List" for the C75 and C80 bars. The Reinforcing
6/12/2024 4620 Steel Quantities were updated for the C75 and C80. ***Notes were added
referencing the addition of lifting loop details to the individual C75 and C80 beam
sheets.
Beam Detail Sheet. Added the straight strands to the lower part of beam in View
6/12/2024 4622-C63 A-A.
Beams Detail Sheets. These sheets were revised with additional 4b1 epoxy coated
bars replacing the uncoated 4b2 bars at the beam ends for the C75 and C80
6/12/2024 4623-C75, 4623-C80 beams. Due to the additional 4b1 bars, revised lifting loop details were added to
C75 and C80 individual beam sheets.
6/12/2024 1007C ForeSlopeProtectionBridges. Changed Control Point text (was Bench Mark).
2078-BTB, 2079-BTB, 2080-BTB, 2081-BTB, 2082-BTB, 2083-BTB, BTIntegralBridges. Updated "Abutment Step Diagram", removed the text and
2084-BTB, 2085-BTCD, 2085-BTE, 2086-BTCD, 2086-BTE, 2087- numbers to make the vertical dimensions neutral. On BTCD sheets an additional
8/1/2024 BTCD, 2087-BTE, 2088-BTCD, 2088-BTE, 2089-BTCD, 2089-BTE, revision is: Added missing 2'-2" vertical dim. in "Part Rear Elevation at Abutment"
2090-BTCD, 2090-BTE, 2091-BTCD, 2091-BTE detail.