Page 2 BOQ - ROAD 2016-17
Excavate new mitre drain not less tha 15m long and
2.2 Lm 450 3000 1,350,000.00
use labour for reshaping the channel
Excavate new mitre drain not less tha 15m long and
2.2 Lm 500 4000 2,000,000.00
use labour for reshaping the channel
Excavate new mitre drain not less tha 15m long and
2.2 Lm 100 3000 300,000.00
use labour for reshaping the channel
Page 3
Excavate, Provide, Lay and Joint Concrete PipesPage 4
Culvert BOQ - ROAD 2016-17
diameter 900mm of 7M long including with mass
2.1 concrete (1:3:6), backfilling with selected materials and No. 2 3,000,000 6,000,000.00
construction of reiforced concrete wing wall and head
wall at CH.5+410, and CH.6+280
Page 4
Excavate, Provide, Lay and Joint Concrete Pipes Culvert
Page 5 BOQ - ROAD 2016-17
diameter 900mm of 8M including with mass concrete
2.1 (1:3:6), backfilling with selected materials and No. 2 3,000,000 6,000,000.00
construction of reiforced concrete wing wall and head
wall at CH. 4+000 and 8+140
Excavate new mitre drain not less tha 15m long and
2.2 Lm 120 3000 360,000.00
use labour for reshaping the channel
GENERAL SUMMARY
TOTAL ###
Page 5
BILL OF QUANTITES
ROUTINE MAINTENANCE OF LUGOBA - TALAWANDA ROAD 16.8KM, MAGULUMATARI - TALAWANDA ROAD
5.75KM, MSATA - PONGWEMSUNGURA ROAD 16.25 KM PERIODIC MAINTENANCE OF CHALINZE -
TALAWANDA ROAD 22.72KM, LUGOBA - TALAWANDA ROAD 16.8KM AND SPOT IMPROVEMENT OF
MAGULUMATARI - TALAWANDA ROAD 5.74KM
Note:All government taxes inclusive (With holding taxes 5% and VAT 18%)
Item Description Unit Qty Rate Amount
Excavate new mitre drain not less tha 15m long and
2.1 Lm 180 3000 540,000.00
use labour for reshaping the channel
Heavy Grading
Formation of the road by Heavy Reshaping from CH
1.1 Km 2.5 2,500,000 6,250,000.00
1+500 to CH. 4+000
Heavy Grading
Formation of the road by Heavy Reshaping from
1.1 CH ,6+320 ~7+000,15+840 ~16+780 and CH.18+550 Km 2.2 2,500,000 5,500,000.00
~19+400
-
Gravelling -
2.4 Provide and lay concrete class 15 (1:3:6) on the base m3 4.75 250,000 1,187,500.00
GENERAL SUMMARY
201,719,525.00
167,092,130.00
34,627,395.00
34,627,395.00
0.828338903
BILL OF QUANTITES
PERIODIC MAINTENANCE OF
CHALINZE TOWN ROADS
ROAD WORKS AND ROAD
2.0 FORMATION
ROUTINE MAINTENANCE OF
MBOGA - DIOZILE ROAD 7.6KM
ROUTINE MAINTENANCE OF
LUGOBA - MORETO ROAD 3.887
KM
SUMMARY
TOTAL ###
Mobilisation/Demobilisation of Plants
1.1 Ls
and equipments 1 6,000,000.00 6,000,000.00
Establishment one site office
1.2 including removed on completion of Ls
works 1 2,500,000.00 2,500,000.00
ROUTINE MAINTENANCE OF
PINGO - MAGURUMATALI ROAD
18KM
2.1
Site clearance from CH.1+000 -6+000 m2 15000 200 3,000,000
-
Heavy Grading -
2.2
Formation of the road by heavy
grading from CH 0+000 ~ 5+000 km 5 1,900,000 9,500,000
Excavations:
(a) Common excavation to
4.4 m3 300 6,000.00 1,800,000.00
spoil(Inclunding River training)
Fill Materials
Fill layers as specified in the
Drawings or as directed by the
4.5 m3 1,016.00 16,000.00 16,256,000.00
Engineer , minimum G7 quality
material (Including overhaul)
4.7 Erect standard reflector road sign No. 2.00 280,000.00 560,000.00
Concrete Finish
5.2 Smooth Vertical formwork to provide m2 120 18,000.00 2,160,000.00
class of finish F3 to main cells and
end structures of box culverts
Steel reinforcement
5.5 (iii) High-yield-stress-steel bars (T16) tonne (t) 6.0 2,900,000.00 17,400,000.00
5.6 (iv) High-yield-stress-steel bars (T12) tonne (t) 7.5 2,900,000.00 21,750,000.00
5.7 (iv) High-yield-stress-steel bars (T8) tonne (t) 0.2 2,900,000.00 580,000.00
GENERAL SUMMARY
TOTAL 128,756,000.00
148278800
137111280
128089000
9,022,280.00
9022280
137111280 14,820,800.00
0.85551465174496 23156320
182,770,200.00
147,913,000.00
34,857,200.00
34857200
1.4 Gravelling
Light Grading
Formation of the road by Light Grading from CH
1.1 Km 9 1,500,000 13,500,000.00
0+000 ~9+000
Fill materials
1.9 Allow holes for draining water from the deck (use No 1 45,000.00 45,000.00
100mm Dia PVC pipes)
GENERAL SUMMARY
TOTAL ###
ADD 18% VAT ###
150,988,080.00
Table 6
Table 6. Preliminary Examinations results. (Contractor’s name) As read Out Above.
PRELIMINARY DOCUMENTATION REQUIRED CEY ULM D&L(T) FOMAST COAST MEGA SEA SHORE
EXAMINATION CRITERIA ENGINEERING INVESTMENT LIMITED COMPANY BELT BUILDERS CIVIL WORKS
CONTRACTOR COMPANY LTD CONSTRUC LTD CONTRACTO
S TION LTD RS
CO.LIMITED
ITT Clause 3 Eligibility of Valid Certificate of Incorporation NO YES YES YES YES NO YES
Bidder
Council Receipt for purchasing Tender Document YES YES YES YES YES YES
Valid Business License NO YES YES YES YES YES YES
Valid Contractors Registration Board Certificate YES YES YES YES YES NO YES
by CRB
Valid Certificate of Taxpayers Identification YES YES YES YES YES YES YES
Number (TIN)
Power of Attorney authorizing the signatory of bid YES YES YES YES YES NO YES
to commit the bidder
CRB Annual fee NO YES YES NO YES YES
Dully filled and signed by an authorized person NO YES YES YES YES YES YES
Bidder has accepted the bid validity period YES YES YES YES YES YES YES
One copy & original submitted YES YES YES YES YES YES YES
BOQ YES YES YES YES YES YES
Tender Submission form YES YES YES YES YES YES YES
Memorandum of Ant bribery YES YES YES YES YES YES YES
Working Experience Work in progress (Recent performed work) NO YES NO YES YES NO YES
Proposed Equipments of Equipments Possesses NO YES YES YES NO NO YES
the Contractor
Personnel Experience Site Manager experience YES YES YES YES YES YES YES
Evidence of adequate Attached Company’s financial statement YES YES YES YES YES NO YES
working capital
Information Regarding Current written information regarding bidders NO YES YES YES YES NO YES
litigation (current) Litigations
ITT. Clause 18. Tender Tender Security and tender Security Declaration YES YES YES YES YES YES YES
Security
Acceptance for Detailed NO YES NO YES NO NO YES
Examination
SAJO CIVIL
ENGINEERIN
G AND
BUILDING
CONSTRUCTI
ON COMPANY
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
Table 6
Table 6. Preliminary Examinations results. (Contractor’s name) As read
PRELIMINARY DOCUMENTATION REQUIRED BESTA OLDONYO MPATA
EXAMINATION HOLDINGS LENGAI COMPANY
CRITERIA COMPANY ENGINEERI LTD
LIMITED NG Co.LTD
Proposed
Equipments of the Equipments Possesses YES
Contractor
Personnel Site Manager experience YES
Experience
Evidence of
adequate working Attached
statement
Company’s financial YES
capital
Information
Regarding litigation Current
regarding
written information
bidders Litigations YES
(current)
ITT. Clause 18. Tender Security and tender Security YES
Tender Security Declaration
1.4 Gravelling
Light Grading
Formation of the road by Light Grading from CH
1.1 Km 9
0+000 ~9+000
Fill materials
1.9 Allow holes for draining water from the deck (use No 1
100mm Dia PVC pipes)
GENERAL SUMMARY
TOTAL
GRAND TOTAL
KM,PERIODIC MAINTENANCE OF
ERTS ALONG KIDOGOZERO ROAD
nd VAT 18%)
Rate Amount
9,000,000
600,000
500,000
600,000
UMMARY 10,700,000
96 96,000.00
800,000 4,000,000.00
16,000 7,360,000.00
20,000 22,500,000.00
###
4,200,000 12,600,000
1,800,000 1,800,000
60,000 60,000
5,000 750,000
O SUMMARY 14,460,000
O ROAD 15.5KM
Rate Amount
900,000 8,100,000.00
15,000 6,000,000.00
10,000 11,250,000.00
###
100.00 24,000.00
200,000.00 200,000.00
5,000.00 300,000.00
100,000.00 4,760,000.00
100,000.00 360,000.00
100,000.00 1,300,000.00
200,000.00 200,000.00
70,000.00 280,000.00
12,000.00 636,000.00
8,060,000.00
2,800.00 1,792,000.00
2,800.00 896,000.00
2,800.00 168,000.00
2,856,000.00
Rate Amount
15,500.00 434,000.00
280,000.00 3,360,000.00
3,794,000.00
###
3,150,000 6,300,000
3,600,000 3,600,000
3,150,000 3,150,000
5,000 100,000.00
2,800 98,000
12,000 120,000
300,000.00 600,000.00
100,000 1,800,000
250,000 825,000
16,593,000.00
Rate Amount
100,000.00 540,000.00
100,000 313,000
15,000 945,000
2,800 98,000
12,000 120,000
300,000.00 600,000.00
100,000 1,000,000
600,000.00
300,000
2500 500,000.00
4,716,000.00
MARY 36,019,000
10,700,000.00
59,306,000.00
50,479,000.00
###
###
###
143665000
1,492,700.00
1492700
BILL OF QUANTITES
PERIODIC MAINTENANCE OF VIGWAZA - BUYUNI ROAD 9.4KM,PERIODIC MAINTENANCE OF
KIDOGOZERO ROAD 15.5KM AND CONSRUTCTION OF CULVERTS ALONG KIDOGOZERO ROAD
Note:All government taxes inclusive (With holding taxes 5% and VAT 18%)
Item Description Unit Qty Rate Amount
1.4 Gravelling
Light Grading
Formation of the road by Light Grading from CH
1.1 Km 9 600,000 5,400,000.00
0+000 ~9+000
Fill materials
1.9 Allow holes for draining water from the deck (use No 1 20,000.00 20,000.00
100mm Dia PVC pipes)
GENERAL SUMMARY
1 PRELIMINARY AND GENERAL COST 5,100,000.00
TOTAL ###
140213500
143665000
3,451,500.00
3451500
0.92864
150,988,080.00
10,774,580.00
10,774,580.00
BILL OF QUANTITES
ROUTINE MAINTENANCE OF LUGOBA - TALAWANDA ROAD 16.8KM, MAGULUMATARI - TALAWANDA ROAD
5.75KM, MSATA - PONGWEMSUNGURA ROAD 16.25 KM PERIODIC MAINTENANCE OF CHALINZE -
TALAWANDA ROAD 22.72KM, LUGOBA - TALAWANDA ROAD 16.8KM AND SPOT IMPROVEMENT OF
MAGULUMATARI - TALAWANDA ROAD 5.74KM
Note:All government taxes inclusive (With holding taxes 5% and VAT 18%)
Item Description Unit Qty Rate Amount
Excavate new mitre drain not less tha 15m long and
2.1 Lm 180 3000 540,000.00
use labour for reshaping the channel
Heavy Grading
Formation of the road by Heavy Reshaping from CH
1.1 Km 2.5 1,800,000 4,500,000.00
1+500 to CH. 4+000
Heavy Grading
Formation of the road by Heavy Reshaping from
1.1 CH ,6+320 ~7+000,15+840 ~16+780 and CH.18+550 Km 2.2 1,800,000 3,960,000.00
~19+400
-
Gravelling -
2.4 Provide and lay concrete class 15 (1:3:6) on the base m3 4.75 18,000 85,500.00
GENERAL SUMMARY
Excavate new mitre drain not less tha 15m long and
2.1 Lm 180 100 18,000.00
use labour for reshaping the channel
Heavy Grading
Formation of the road by Heavy Reshaping from CH
1.1 Km 2.5 2,500,000 6,250,000.00
1+500 to CH. 4+000
Heavy Grading
Formation of the road by Heavy Reshaping from
1.1 CH ,6+320 ~7+000,15+840 ~16+780 and CH.18+550 Km 2.2 2,500,000 5,500,000.00
~19+400
-
Gravelling -
2.4 Provide and lay concrete class 15 (1:3:6) on the base m3 4.75 120,000 570,000.00
GENERAL SUMMARY
- 18,255,721.00
5,400,000.00
EMERGENCY WORKS ALONG KIMANGE ~ PONGWEKIONA ROAD
Item Description Unit Qty Rate Amount
BILL NO.2:DRAINAGE
2
WORKS
site clearance upstream and
2.1 downstream including bush m2 120 300.00 36,000.00
clearance
GENERAL SUMMARY
TOTAL ###
ROUTINE MAINTENANCE OF PINGO - MAGURUMATALI ROAD 18KM AND CONSTRUCTION OF BOX CULVERT ALONG PINGO -
MAGURUMATARI ROAD
Note:All government taxes inclusive (With holding taxes 5% and VAT 18%)
PAY ITEM Unit Qty Rate Amount
ACTIVITY DESCRIPTION
Tshs Tshs
1.1 Mobilisation/Demobilisation
equipments
of Plants and Ls
0.8 6,000,000.00 4,800,000.00
1.2 Establishment one site office including removed on
completion of works Ls
0.4 2,500,000.00 1,000,000.00
2.1
Excavations:
4.4 (a) Common excavation to spoil(Inclunding River
training) m3 6,000.00 0.00
Fill Materials
Fill layers as specified in the Drawings or as
4.5 directed by the Engineer , minimum G7 quality m3 16,000.00 0.00
material (Including overhaul)
Concrete Finish
5.2 Smooth Vertical formwork to provide class of finish m2 18,000.00 0.00
F3 to main cells and end structures of box culverts
Steel reinforcement
5.9 (b) Class of 30/20 structural concrete in main cells m3 400,000.00 0.00
and end structures of box culverts
GENERAL SUMMARY
TOTAL 19,650,000.00