Group1 - B.A.G
Group1 - B.A.G
Group1 - B.A.G
PREPAREDNESS
UNDER NDRRM
PLAN
Module 1
GROUP 1:
Jherome C. Devaras
Alfred Salubon
Kei Adhelein Diocolano
Beverly A. Medalla
Angela Rose Mejico
Jhogia Centeno
THEMATIC AREA 2:
DISASTER PREPAREDNESS
Overall Responsible agency: Department of interior and local government (DILG)
OUTCOME LEAD AGENCIES
7. Increased level of awareness and enhanced capacity Philippine information Agency (PIA)
of the community to the threats and impacts of all
hazard.
8.Communities are equipped with necessary skills and Department of interior and local government (to coordinate)
capability to cope with the impacts of disasters. and OCD (to implement)
9. Increased DRRM and CCA capacity of local DRRM
councils, offices and operation centers at all levels. DILG
10.Developed and implemented comprehensive national
and local preparedness and response policies , plans,
and systems. DILG and OCD
11.Strenghten partnership and coordination among all
key players and stakeholders.
DILG
PROGRAM AND ACTIVITIES UNDER
THE DISASTER PREPAREDNESS
Conducting Drills and Exercises
REGIONAL
DRRM PLANS
LOCAL DRRM
PLANS
PDRRMCs Department
Regional DRRMPs manual of operations
(regional offices)
National Government LEVEL
Local Government LEVEL
Manual(s) of Operation /Contingency Plan(s)
P/C/M/B DRRMPs (LGUs’ Offices)
ORGANIZATIONAL STRUCTURE
UNDER THE NDRP
Chairperson, NDRRMC
Camp coordination
and Management
CONTINGENCY PLAN
Scenarios and observation are agreed.
To respond
frame
Contents are actual and precise
ASPECTS DRRM PLANNING CONTINGENCY OPERATIONS
PLANNING PLANNING
When to do Planning period (annual, bi Before Emergency (normally Immediately following the
done after EWS or before a emergency to include on – scene
annual, etc.) incident action planning
planned event)
Scope of plan General; covers the four priority Specific; with time frame More specific
components prevention &
mitigation, preparedness, response
for some events/hazards
and rehabilitation and recovery.
Planning Level All DRRMC levels Managerial level Actual/on-site or field level
Plan Execution Annual, Bi-Annual, etc. Specific (but uncertain); Executed right time, fixed
Developing
PURPOSE OF RA 10121
Hazards
Disaster
• Natural Disaster
• Man-Made Disaster
BASIC CONCEPT ON DISASTER RISK
REDUCTION AND MANAGEMENT (DRRM)
AND CLIMATE CHANGE ADAPTION (CCA)
Vulnerability
Capacity
Exposure
RISK
- The combination of probability of an event and its negative consequences.
DISASTER RISK
- The potential disaster losses when hazards occur or disaster risk is dependent on
the strength of hazard; and extent of exposure, vulnerability, and capacity of a
community to withstand the onslaught of the hazard.
MITIGATION
- the action of reducing the severity, seriousness, or painfulness of
something, it will also lessening or limitation of the adverse impacts
of hazards and related disasters.
PREPAREDNESS
-refers to a very concrete research-based set of actions that are taken
as precautionary measures in the face of potential disasters.
RESPONSE
RECOVERY
RESELIENCE
-capacity to maintain social and economic activities or structures in the
face of climate change or disaster.
COMMUNITY
- is a group of people living in the same geographic area, sharing
resources together, and having the same interests.
CLIMATE CHANGE
Children can :
*conserve water
*conserve electricity
*recycle
*help in waste segregation at home and in school
*inform peers and their family regarding climate
change and how to mitigate the effects
THE IMPORTANCE OF DISASTER
RISK MANAGEMENT?