Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Air System Sizing Summary For Scenario 1: Harmonic Mode

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Air System Sizing Summary for Scenario 1 : Harmonic mode

Project Name: ESI Carbon Capture and Storage (CCS) Project 08/26/2015
Prepared by: Prime Electrical 08:39AM

Air System Information


Air System Name ............... Emirates Steel-Harmonic Number of zones ........................................................... 1
Equipment Class ...................................... PKG ROOF Floor Area ................................................................ 52.0 m
Air System Type ............................................. SZCAV Location ................... Abu Dhabi, United Arab Emirates

Sizing Calculation Information

Calculation Months .................................... Jan to Dec Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ................................................ Calculated Space L/s Sizing .............. Individual peak space loads

Central Cooling Coil Sizing Data

Total coil load ..................................................... 102.7 kW Load occurs at .................................................. Jul 1500
Sensible coil load ................................................ 102.5 kW OA DB / WB ................................................... 43.9 / 23.3 C
Coil L/s at Jul 1500 .............................................. 4264 L/s Entering DB / WB ........................................... 35.8 / 21.2 C
Max block L/s ...................................................... 4264 L/s Leaving DB / WB ............................................ 15.9 / 14.5 C
Sum of peak zone L/s .......................................... 4264 L/s Coil ADP .................................................................. 13.6 C
Sensible heat ratio .............................................. 0.998 Bypass Factor ........................................................ 0.100
m/kW .................................................................... 0.5 Resulting RH ............................................................... 27 %
W/m ................................................................ 1975.4 Design supply temp. ................................................. 15.0 C
Water flow @ 5.6 K rise ....................................... N/A Zone T-stat Check ................................................. 0 of 1 OK
Max zone temperature deviation ................................ 0.0 K

Central Heating Coil Sizing Data


No central heating coil loads occurred during this calculation.

Supply Fan Sizing Data

Actual max L/s ..................................................... 4264 L/s Fan motor BHP ........................................................ 0.00 BHP
Standard L/s ........................................................ 4251 L/s Fan motor kW .......................................................... 0.00 kW
Actual max L/(s-m) ............................................ 82.00 L/(s-m) Fan static ...................................................................... 0 Pa

Outdoor Ventilation Air Data


Design airflow L/s ..................................................... 0 L/s L/s/person ................................................................ 0.00 L/s/person
L/(s-m) ................................................................. 0.00 L/(s-m)

Hourly Analysis Program v4.90 Page 1 of 3


Zone Sizing Summary for Scenario 1 : Harmonic mode
Project Name: ESI Carbon Capture and Storage (CCS) Project 08/26/2015
Prepared by: Prime Electrical 08:39AM

Air System Information


Air System Name ............... Emirates Steel-Harmonic Number of zones ........................................................... 1
Equipment Class ...................................... PKG ROOF Floor Area ................................................................ 52.0 m
Air System Type ............................................. SZCAV Location ................... Abu Dhabi, United Arab Emirates

Sizing Calculation Information

Calculation Months .................................... Jan to Dec Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ................................................ Calculated Space L/s Sizing .............. Individual peak space loads

Zone Sizing Data

Maximum Maximum Zone


Cooling Design Minimum Heating Floor
Sensible Airflow Airflow Time of Load Area Zone
Zone Name (kW) (L/s) (L/s) Peak Load (kW) (m) L/(s-m)
Zone 1 102.6 4264 4264 Aug 1500 0.7 52.0 82.00

Zone Terminal Sizing Data


No Zone Terminal Sizing Data required for this system.

Space Loads and Airflows

Cooling Time Air Heating Floor


Zone Name / Sensible of Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m) L/(s-m)
Zone 1
Emirates Steel-Harmonic 1 102.6 Aug 1500 4264 0.7 52.0 82.00

Hourly Analysis Program v4.90 Page 2 of 3


Space Design Load Summary for Scenario 1 : Harmonic mode
Project Name: ESI Carbon Capture and Storage (CCS) Project 08/26/2015
Prepared by: Prime Electrical 08:39AM

TABLE 1.1.A. COMPONENT LOADS FOR SPACE '' Emirates Steel-Harmonic '' IN ZONE '' Zone 1 ''
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Aug 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 43.9 C / 23.3 C HEATING OA DB / WB 11.1 C / 6.4 C
OCCUPIED T-STAT 35.0 C OCCUPIED T-STAT 21.1 C
Sensible Latent Sensible Latent
SPACE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m 0 - 0 m - -
Wall Transmission 76 m 484 - 76 m 292 -
Roof Transmission 52 m 1042 - 52 m 259 -
Window Transmission 0 m 0 - 0 m 0 -
Skylight Transmission 0 m 0 - 0 m 0 -
Door Loads 10 m 107 - 10 m 162 -
Floor Transmission 52 m -256 - 52 m 0 -
Partitions 0 m 0 - 0 m 0 -
Ceiling 0 m 0 - 0 m 0 -
Overhead Lighting 360 W 360 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 100680 W 100674 - 0 0 -
People 3 215 180 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 102626 180 - 713 0

TABLE 1.1.B. ENVELOPE LOADS FOR SPACE '' Emirates Steel-Harmonic '' IN ZONE '' Zone 1 ''
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(m) (W/(m-K)) Coeff. (W) (W) (W)
E EXPOSURE
WALL 13 0.386 - 77 - 50
DOOR 4 1.703 - 47 - 72
W EXPOSURE
WALL 12 0.386 - 112 - 46
DOOR 5 1.703 - 60 - 90
N EXPOSURE
WALL 26 0.386 - 114 - 98
S EXPOSURE
WALL 26 0.386 - 181 - 98
E EXPOSURE
ROOF 26 0.498 - 506 - 129
W EXPOSURE
ROOF 26 0.498 - 536 - 129

Required Tonnage for AC unit= 102.6.kw/3.516= 29.1Ton Package unit

Hourly Analysis Program v4.90 Page 3 of 3

You might also like