Design For B.T. ROAD
Design For B.T. ROAD
Design For B.T. ROAD
CC ROAD DESIGN
Wheel Load (from graph) = 3000 Kgs (As per IRC :58-2002)
1.25
=
100*0.00001*(17.3)
2*0.8*10^4
=
2400*1.5
Sys3/file:///conversion/tmp/scratch/374985311.xls 1 of 17
Provide Expansion Joints @ every
15th such joints a spacing of 15 x = 66.00 c/c.
4.4m =
Edge Stresses :
Load Stress in the Edge region,
= 0.572 P/h2(1+0.54 )(4 log10 l/b + log10b - 0.4048)
Kg/Cm2 le
With le = Load stress in the edge region, Kg/Cm2
P = Design wheel load, Kg, = 3000
h = Pavement Slab thickness, cm, = 15
= Poisson's ratio for concrete, = 0.15
E = modulus of elasticity for concrete, Kg/Cm2 = 3 x 105
K = reaction modulus of the pavement foundation, Kg/Cm2 = 6.9
l = radius of relative stiffness, cm = 59.47
Eh3 1/4
=
12(1-2)K
= 59.47 Cm
Load Stress in the Edge region, Kg/Cm = 0.572 P/h2(1+0.54 )(4 log10 l/b + log10b - 0.4048)
= 0.572 x (3000 15^2 (1+0.54 x0.15)x(4log10 59.47/14.06+ log10 14.06 - 0.4048)
= 26.78 Kg/Cm2 Safe
Width of Pavement Slab = 4.50 m
Length of C.C. Slab (i.e. 0 between
= 4.40 m
contraction joint)
Cx - Coefficient based on the value Lx/L is determined by Bradbury's chart
Lx / L = 440/ 59.47
= 7.40
Cx (for 5.46) = 1.05 (IRC:58-2002 Fig-2)
Warping Stress at edge Cx x E x e x t
=
2
1.05 x 3x105x10x10-6x15
=
2
= 23.63 Kg/Cm2 Safe
1.2
Corner Stress 3P a Sqrt(2)
= 1-
h2 l
Sys3/file:///conversion/tmp/scratch/374985311.xls 2 of 17
Hence 15 Cms thick C.C. Slab may be provide.
Provide 8mm dia bars @ 400mm c/c of 600 mm Length as Tie bars according to IRC 58 : 2002 Table - 9.
Sys3/file:///conversion/tmp/scratch/374985311.xls 3 of 17
B.T. ROAD (2) YEMMIGANUR
YEMMIGANUR MUNICIPALITY
B.T. ROAD DESIGN
i Data :-
ii Design:-
Cumulative No. of Axis through the life (As per IRC :37-2001, 3.3.6.1)
Where
The Cumulative number of standard axles to be catered
N =
for in the design in terms of msa.
Initial Traffic in the year of completion of construction in
A = 350
terms of the number of commercial vehicles per day.
714.9902
N = x 918.75
0.075
N = 8758630.3637494
N = 8.76 msa
Sys3/file:///conversion/tmp/scratch/374985311.xls 4 of 17
B.T. ROAD (2) YEMMIGANUR
iv. Composition :-
690-660
Total thickness = 660 + (12.52-10)
20-10.
Sys3/file:///conversion/tmp/scratch/374985311.xls 5 of 17
B.T. ROAD (2) YEMMIGANUR
= 667.56 mm
v. Bituminous Surface :-
B.C.: Thickness = 40 mm
100-70
DBM = 70 + (12.52-10)
20-10.
= 77.56 = 80 mm
The Sub-grade is to be compacted up to 97% of proctor density (As per IRC :36)
Base Cours as W.M.M 75mm to 100mm layers are laid with WBM grade - II and Grade - III for more than
150mm thick base course.
Sys3/file:///conversion/tmp/scratch/374985311.xls 6 of 17
B.T. ROAD (8%)
BHIMAVARAM MUNICIPALITY
B.T. ROAD DESIGN
i Data :-
Two lane Single Carriage Way
ii Design:-
Cumulative No. of Axis through the life (As per IRC :37-2001, 3.3.6.1)
Where
The Cumulative number of standard axles to be
N =
catered for in the design in terms of msa.
Initial Traffic in the year of completion of
A = construction in terms of the number of commercial 400
vehicles per day.
D = Lane distribution factor (as Explained in para 3.3.5) 75%
N = 10009863.2729
N = 10.01 msa
Sys3/file:///conversion/tmp/scratch/374985311.xls 7 of 17
B.T. ROAD (8%)
Sys3/file:///conversion/tmp/scratch/374985311.xls 8 of 17
B.T. ROAD (8%)
iv. Composition :-
v. Bituminous Surface :-
Proposed B.C.: = 40 mm
Proposed D.B.M = 70 mm
Proposed Wet Mix Maccadam (GB) = 250 mm
Proposed GSB = 300 mm
Total = 40+70++250+300 660 mm
The Sub-grade is to be compacted up to 97% of standard proctor density by Borrowed earth and
before construction of sub - base the CBR Valve of the sub-grade so prepared is to be ensured as not
< 8% and certifie to that effect.
Sys3/file:///conversion/tmp/scratch/374985311.xls 9 of 17
CC ROAD DESIGN
MUNICIPAL CORPORATION
B.T. ROAD DESIGN
i Data :-
Two lane Single Carriage
Way
ii Design:-
Cumulative No. of Axis through the life (As per IRC :37-2001, 3.3.6.1)
Where
The Cumulative number of standard axles to be catered for
N =
in the design in terms of msa.
Initial Traffic in the year of completion of construction in
A = 200
terms of the number of commercial vehicles per day.
CC ROAD DESIGN
Thermal Co-efficient of
= 0.00001 Per 0
C (As per IRC :58-2002, 4.7.3)
Concrete (e) 10 x 10-6
Sys3/file:///conversion/tmp/scratch/374985311.xls 10 of 17
CC ROAD DESIGN
Temperature Difference = 23 0
C
1.25
=
100*0.00001*(0.075)
2*0.08*10^4
=
15*3.5
= 65.33 Cm
b = radius of equiv. distribution of pressure
Sys3/file:///conversion/tmp/scratch/374985311.xls 11 of 17
CC ROAD DESIGN
Lx / l = 400/ 65.33
= 6.12
Cx (for 5.46) = 1.08 (IRC:58-2002 Fig-2)
= 37.26 / 37.26
1.00 > 1 Unsafe
According to IRC Thickness adjustment factor is -5 cm for low traffic
Thickness of Slab required = 17 - 5
= 12 Cms.
Hence 12 Cms thick C.C. Slab may be provide.
Sys3/file:///conversion/tmp/scratch/374985311.xls 12 of 17
B.T. ROAD (5) YEMMIGANUR
Cumulative No. of Axis through the life (As per IRC :37-2001, 3.3.6.1)
Where
The Cumulative number of standard axles to be catered
N =
for in the design in terms of msa.
Initial Traffic in the year of completion of construction in
A = 200
terms of the number of commercial vehicles per day.
Sys3/file:///conversion/tmp/scratch/374985311.xls 13 of 17
B.T. ROAD (5) YEMMIGANUR
iv. Composition :-
v. Bituminous Surface :-
S.D.B.C.: Thickness = 25 mm
D.B.M = 55 = 55 mm
Granular Base = 250 mm
Sub - Base = 250 mm
Tota = 25+55+250+250 = 580 mm
The Sub-grade is to be compacted up to 97% of standard proctor density (As per IRC :36)
G.S.B according to IS 2720 Part - 5.
Base Course as W.M.M 75mm to 100mm layers are laid with WBM grade - II and Grade - III for more than
150mm thick base course.
Sys3/file:///conversion/tmp/scratch/374985311.xls 14 of 17
B.T. ROAD YEMMIGANUR
Cumulative No. of Axis through the life (As per IRC :37-2001, 3.3.6.1)
Where
The Cumulative number of standard axles to be catered
N =
for in the design in terms of msa.
Initial Traffic in the year of completion of construction in
A = 350
terms of the number of commercial vehicles per day.
Sys3/file:///conversion/tmp/scratch/374985311.xls 15 of 17
B.T. ROAD YEMMIGANUR
iv. Composition :-
v. Bituminous Surface :-
B.C.: Thickness = 40 mm
100-70
DBM = 70 + (8.76- 5)
10-5.
= 92.56 = 100 mm
Granular Base = 250 mm
Sub - Base = 450 mm
Tota = 40+100+250+450 = 840 mm
The Sub-grade is to be compacted up to 97% of proctor density (As per IRC :36)
Sys3/file:///conversion/tmp/scratch/374985311.xls 16 of 17
B.T. ROAD YEMMIGANUR
Sys3/file:///conversion/tmp/scratch/374985311.xls 17 of 17