CH 1
CH 1
CH 1
It is very difficult to find a single comprehensive definition of project because projects are
different in terms of their nature and objectives. Some of its definitions are:
Though project can be defined in various ways and though they differ in many respects the
following are common features/characteristics of project:
Page 1 of 14
Projects are terminated when the objectives are achieved, or conversely, if the
objectives cannot be met.
They involve multiple resources (human and nonhuman) and require close
coordination.
Projects encompass complex activities that are not simple, and may require
repetitive acts.
There exists a constant conflict for project resources and for leadership roles in
solving project problems.
The principal purposes of goals of undertaking projects depend on the nature of the
project:
There is some degree of relationship between projects, plans and programs. There
are also significant differences.
Page 2 of 14
1.4.1. Development Goal/Objectives
A strategy is defined as in various ways by different authors. But in general it refers to the
general methods of achieving specific objectives at national or organizational levels.
It mainly describes the essential resources which will be committed to achieve objectives.
It also explains how these resources will be organized. Example, it may ask how to organize
the labor force of the organization or the project. It can take different forms such as import
substitute, export promotion, ADLI etc.
Establishment of sector goals- for example, what is the goal of agricultural sector in
the next 5 years, 10 years; the industry sector in the coming 10 years.
Defining of the means to achieve the sector goals
Determining of the feasibility of achieving the stated goals from the political,
technical, organizational and resource point of view.
Preliminary assessment of costs and benefits of the goals and objectives
Setting priorities – which sub sector, should be provided more attention in each
sector.
Projects can, therefore, be seen as policy instruments through which national and sub-
national plans are treated into action. Projects are often referred to as the “cutting age
of development”.
Page 3 of 14
The national and sub-national plan serves as a reference for the identification and
valuation of a project.
A program and a project often used interchangeably but they are not the same. As can be
shown below, a project is narrower than a program in terms of technical performance,
time and resources (scope). A program most of the time consists more than one project.
Program Project
Scope/objective Wide/diverse Narrow limited
s
Location Diffused/wide Specific
Life time Non-time bound Time bound
Resources Larger budget Limited budget
Project with the characteristics already outlined above typically run through at least
several separable stages of activity, which can be thought of as constituting a
definite sequence that some authors/institutions/ have called a project cycle.
The first basic model of a project cycle is that of Baum (1970), which has been
adopted by the World Bank and initially recognized four main stages, namely;
1. Identification
2. Preparation
3. Appraisal and Selection
4. Implementation
Page 4 of 14
At a later stage (1978) the author has added an additional stage call “Evaluation”
which usually closes the cycle as it gives rise to the identification of new projects,
thus making the stages 5 in number. These processes can usually be considered as a
comprehensive sequence in the sense that for the project that is implemented each
stage naturally follows the proceeding one and leads on the next. Actually, the
division into stages is artificial, but it helps us to understand that project planning,
though a continuous process over time, has distinct phases and stages.
Throughout the project cycle the primary preoccupation of the analyst is to consider
alternatives, evaluate them, and to make decisions as to which of them should be
advanced to the next stages. Thus each of Baum’s main stages is discussed briefly
below.
2.1.1. Identification
The first stage in the cycle is to find potential projects. Some sources of projects
are given here.
Some may be “resource based” and stem from the opportunity to make
profitable use of available resources.
Some projects may be “market based” arising from an identified demand in
home or overseas markets.
Others may be “need-based” where the purpose is to try to make available to
all people in an area of minimal amounts of certain basic material
requirements and services.
Well-informed technical specialists and local leaders are also common
source of projects. Technical specialists will have identified many areas
where they feel new investment may be profitable, while local leaders may
have suggestions about which investment might be carried out.
Ideas and new projects also come from proposals to extend existing
programs.
In general, most projects start an elementary idea. Eventually, some simple ideas are
elaborated into a form to which the title “project” can be formally applied.
Once projects have been identified, there begins a process of progressively more
detailed preparation and analysis of project plans. At this stage the project is being
seriously considered as a definite investment action.
Page 5 of 14
Project preparation (project formulation) covers the establishment of technical,
economic and financial feasibility. Decisions have to be made on the scope of the
project, location and site, soil and hydrological requirements, project size (farm
or factory size) etc.
Resource base investigations are undertaken and alternative forms of projects are
explored. Complete technical specifications of distinct proposals accompanied by
full details of financial and economic costs and benefits are the outcome of the
project preparation stage. The project now exists as a set of tangible proposals.
2.1.3. Appraisals
After a project has been prepared, it is generally appropriate for a critical review or
an independent appraisal to be conducted. This provides an opportunity to
reexamine every aspect of the project plan to assess whether the proposal is
appropriate and sound before large sums are committed.
Generally, internal government staffs only are used for this work and consultants
and projects are appraised both in the field and at the desk level. Appraisals should
cover at least seven aspect of a project, each of which must have been given special
considerations during the project preparation phase:
These issues are the subjects of specialized appraisal report. And on the basis of
these report, financial decisions are made –whether to go ahead with the
project or not. In practice, there can be quite a sequence of project selection
decisions. Following appraisal, some projects may be discarded.
If the project involves loan finance, the lender will almost certainly wish to carry out
his own appraisal before completing negotiations with the borrower. Comments
made at the appraisal stage frequently give rise to alterations in the project plan
(project proposal)
2.1.4. Implementation
The objective of any effort in project planning and analysis clearly is to have a
project that can be implemented to the benefit of the society. Thus, implementation
is perhaps the most important part of the project cycle.
In this stage, funds are actually disbursed to get the project started and keep
running. A major priority during this stage is to ensure that the project is carried out
in the way and within the period that was planned. Problems frequently occur when
economic and financial environment at implementations differs from the situation
expected during appraisal.
Frequently original proposals are modified, through usually with difficulty, because
of the need to get agreement between the parties involved.
It is during implementation that many of the real problems of the project are first
identified. Because of these, the feedback effect on the discovery and design of new
projects and the deficiencies in the capabilities of the project actor can be revealed.
Therefore, to allow the management to become aware of the difficulties that might
arise, recording, monitoring and progress reporting and important activities during
Page 7 of 14
the implementation stage. There are some aspects of implementation that are of
particular relevance to the project planning and analysis.
1. The first is that the better and more realistic a project plan is, the more
likely it is that the plan can be carried out and the expected benefit realized.
This emphasize once again the need for careful attention to each aspect of
project planning and analysis
2. The second is that implementation must be flexible. Circumstances will
change and project managers must be able to respond intelligently to these
changes.
The common ones are technical changes (soils, water logging, and nitrogen
applications) price changes, economic changes and these will alter the ways in
which it should be implemented.
2.1.5. Evaluation
The final phase in the project cycle is evaluation. Once a project has been carried
out, it is often useful, (though not always done) to look back what took place, to
compare actual progress with the plans, to judge whether the discussion and
actions taken were responsible and useful.
The extent to which the objectives of a project are being realized provides the
primary criterion for evaluation. The analyst looks systematically at the elements of
success and failure in the project experience to learn how better to plan for the
future.
Evaluation may be undertaken when the project is in trouble, as the first step in a
re-planning effort. Careful evolution should precede any effort to plan follow-up
projects. And, finally, evaluation should be undertaken when a project is terminated
or is well into routine operation. Many different people may do evaluation.
Page 8 of 14
In large and innovative projects, the project’s administrative structure may
provide a separate evaluation unit responsible for monitoring the projects
implementation and for bringing problems to the attention of the project’s
management.
Evaluation can help not only in the management of the project after the initial phase,
but will also help in the planning of future projects.
Experience with one project can give rise to new ideas for extension, repetition, the
need for “vertically” associated projects, which supply, inputs to or process products
from this project, and other ideas which became the seeds or new project proposals.
According to UNIDO, project cycle involves three major phases. These are:
1. Pre-investment phase
2. Investment phase (Implementation phase)
3. Operation phase (operation and ex-post evaluation)
Each of the above phases will be explained in the section that follows:
Availability of resources
Future demand for goods, increasing population and increasing
purchasing power.
Import and export substitutions
Environmental impact
Success of similar projects elsewhere
Possible inter-linkage with other industries
Page 9 of 14
Expansion through linkages (Backward integration) and forward
linkages (Forward integration)
Industrial policies of the government
General investment climate of the country
Export potentials
Availability and cost of production
Etc
Specific Project Opportunity Studies (Enterprise Approach) are seen in the form
of products with potential for domestic manufacture. A specific project opportunity
study may be defined as the transformation of a project idea into a broad
investment proposition.
A project opportunity study should not involve any substantial cost in its
preparation, as it is intended primarily to highlight the principal investment aspect
of a possible industrial proposition. The purpose of opportunity study is to arrive at
a quick and inexpensive determination of salient facts of an investment possibility.
Page 10 of 14
Preparation (feasibility study)
The projects justified by pre-feasibility study enter this phase for detailed analysis
based on investigated efforts than on guess-estimated. This stage provides all data,
define, and critically examine the commercial, technical, financial, economic, and
environmental aspects for each project. In feasibility study phase, window dressing
approach should be avoided.
After the three phases (opportunity study, pre- feasibility, and feasibility study), the
supporting data should fulfill the following minimum reliability standards.
(1) After opportunity studies, the project should be reliable about 70% for
implementation
(2) The project should be reliable about 80% for implementation after pre-
feasibility studies
(3) After feasibility studies, the project should be about 90% reliable for
implementation.
Project Appraisal
Page 11 of 14
After feasibility studies are completed, the projects should be presented to the
appraising parties. The appraisal of project is based on the objectives set earlier,
the expected risk, costs, and gains. The quality of feasibility studies makes easier
the appraisal work. If the objective of the appraiser is Return on investment, the
project is appraised on this base.
The investment phase, also called implementation phase, includes the following
activities:
Page 12 of 14
2.2.3. Operating phase
Once activities listed under investment phase are completed, the project will go in to
actual operation. The operation involves producing the envisaged goods, and sale to
the target market, or renders the envisaged service to the target market. The project
also requires evaluation, which deals with the review of whether the project is being
implemented as per expectation. The necessary corrective actions should also be
taken if deviation is identified.
There are various ways in which the project cycle may be viewed and depicted
depending on the purpose, emphasis and detail required to illustrate.
1. Pre-investment
2. Investment and
3. Operation
Each of these three phases may be divided into stages. The guidelines have divided
the project into six stages.
1. Identification
2. Preparation
3. Appraisal
4. Implementation
5. Operation
6. Ex-post evaluation
The pre-investment phase consists of the first-three stages, the investment phase
includes the fourth stage and the operation phase covers the last two stages.
The project cycle means the various stages of information gathering and decision-
making, which take place between a project’s inception and completion.
In reality, these are somewhat artificial, but do serve to emphasis the need to think
of project planning as a process of decision-making taking place over time. Broadly
speaking, what is important about this process is that it should begin with the
identification of a number of alternatives, using existing information and gathering
Page 13 of 14
new data in such a way as to limit alternatives under consideration to those few,
which are most promising.
Throughout the project cycle the primary preoccupation of the analyst is to consider
alternatives, evaluate them, and to make decisions as to which of them should be
advanced to the next stage.
In short, the project planning process is essentially one of eliminating and the
planner naturally hopes that the best alternative will emerge.
In this process:
1. The results (output) of a given stage serve as the input or part of the input
of the next stage, if it is decided to proceed to the next stage.
2. The output or part of the output of one stage may be used as new input
(feedback) to reconsider or revise, where necessary, the result of a
proceeding stages and
3. Most importantly, the results of the implementation, operation and ex-post
evaluation stages of a project constitute valuable experience for the
preparation of subsequent projects provided these inputs are
systematically documented and analyzed.