QA Clarification Letter
QA Clarification Letter
QA Clarification Letter
DXB/
M/s. QA Construction
Dear Sir,
MALEK MONAER
Managing Director
QA Construction Building Contracting
PRICE ANALYSIS
No. Item Consultant Comment
the rate for floor slab is little bit high, please re-check and
03. Bill No.3 – Concrete
clarify it.
05. Bill No.5 – Special works price analysis for item 8 to be provided
• The quoted price for this bill is too high. It’s recommended to
07. Bill No. 7 – Electrical works
recheck the price.
MALEK MONAER
Managing Director