Assessment of building damage due to incidental fire.

G+M warehouse & G+5 Offices


BUILDINGS On Plot No. EWTA79A
JAFZA - DUBAI

FOR Mr.
Sport Land FZCO.

PRESENTED BY :

ORION ENGINEERING CONSULTANT

06th February 2024


Assessment of building damage due to incidental fire.

ASSESSMENT OF BUILDING DAMAGE


DUE TO INCIDENTAL FIRE.
FOR BUILDING NO. 1
PURPOSE OF THIS REPORT:

To specify damages occurred for the buildings


and report the current conditions and required
remedies for the buildings damaged by fire.
BUILDINGS DESCRIPTION.

a. Building No1:
(G+M) Warehouse which was used as
storage/ retail.
Occurred damages and Current conditions.

a Bldg. Damages remedy required


Component

1 main structure Totally damaged To removed


(Skelton)
2 Interior and Totally damaged To removed
exterior
components
3 MEP services Totally damaged To removed
4 Grade slab Medium defects To be inspected by specialist to determine
the
required repair.
building no1 totally
damaged
building no.1
fully collapsed
building no1
fully damaged
ASSESSMENT OF BUILDING DAMAGE
DUE TO INCIDENTAL FIRE.
FOR BUILDING NO. 2
BUILDINGS DESCRIPTION.

(G+5) building which was used as


offices.
Occurred damages and Current conditions.

a Bldg Damages Treatment


Component required
1 main structure (Skelton) Cracks for some walls ( in To repaired
floors
no…)

2 Interior and exterior Exterior cladding damaged To removed totally and


components for rear side of building at replace with new
levels…. materials (should meet
DCD
requirements)

3 MEP services Partially damage for To be re-tested by


equipment’s located on specialist and decide
roof top required
repairs

4 Lift Not working, To be inspected by


specialist to determine
the
required repair.

5 Floor Tiles Some tiles damaged Tiles Re-fix is required

Overall Building condition: repair is


required for MEP, exterior, floor tiles.
damage for
exterior -elevation 3
fully damages for exterior
at elevation4
full damages
for exterior at
eelevation 4
full damage
for exterior at elevation 4
wall crack
lift stop
working
window
damage
due fire
Glass
broken due
fire
window
damaged
due fire
equipment
damaged
due fire
damaged
equipment
due fire
damaged
tank on roof
due fire
ASSESSMENT OF BUILDING DAMAGE
DUE TO INCIDENTAL FIRE.
FOR BUILDING NO. 3
BUILDINGS DESCRIPTION.

(G+M) warehouse building which was


used as storage& offices
Occurred damages and Current conditions.
a Component Desc. Damages Treatment
required
1 main structure (Skelton) Cracks for To repaired
rear side wall

2 Interior and No damages


exterior components

3 MEP services No Damages

4 Roof sheeting on top partially Damaged on the To be inspected by


side and top specialist to determine
the required
repair.

Overall Building conditions are good with


minor remedies are required due fire.
damaged
sheet due
fire
wall
cracked
due fire