09 February 2024

DXB/
M/s. Ruslan Technical services

For the kind Atten: Tendering Department


Project: Proposed Open shed, Boundary wall & block wall Partition.
Client: Biotechnology
Plot: MO-0506 at Jabel Ali Freezone.

Subject: Tender Clarification& revised offer

Dear Sir,

Upon reviewing your tender submitted on 10 Jan 2024, we hereby


request you to reply / confirm the attached clarification report and re-
submit your revised competitive offer no later than Thursday 15
February 2024.

Thank you and best regards


For Orion engineering consultants

MALEK MONAER
Managing Director
Ruslan Technical Services

PRICE ANALYSIS

No. Item Consultant Comment

• The quoted price for this bill is high. It’s recommended to


01. Bill No.1 – Preliminaries
recheck the prices on items A,B PAGE 2 OF BILL 1.

• The quoted price for this bill is high. It’s recommended to


02. Bill No.2 – Site Works
recheck the prices on items 2,3& 4 page 1

please re-check the rates, the rate for floor slab is too low, while
03. Bill No.3 – Concrete
the rate for c/s plaster is too high, please clarify

04. Bill No.4 – Metal Works item no. 3 to be as PS item

please recheck followings: rate for boundary wall is too low,


rate for excavate is too high, rate forfoundation is too low, rate
05. Bill No.5 – Special works
for plaster is too high, price analysis for item 8 to be provided

• The quoted price for this bill is high. It’s recommended to


06. Bill No.6 – Finishes
recheck the price.

• The quoted price for this bill is too high. It’s recommended to
07. Bill No. 7 – Electrical works
recheck the price.

Bill No. 8 – Fire Detection & Alarm • The quoted price for this bill is Low. It’s recommended to
08.
System recheck the price.

Thank you and best regards