Construction Methods and Technology: - Psda - Gami Jade - Course Guide: Prof. Vignesh Ayyathurai
Construction Methods and Technology: - Psda - Gami Jade - Course Guide: Prof. Vignesh Ayyathurai
Construction Methods and Technology: - Psda - Gami Jade - Course Guide: Prof. Vignesh Ayyathurai
and Technology
AUMCM774
• PSDA - GAMI JADE
• Course guide : Prof. Vignesh Ayyathurai
PRESENTED NAME ENROLLMENT NUMBER
BY :
MRUNALINI DONODE A70059022073
SURAJ WAGHMODE A70059022012
SAMRUDHI PATIL A70059022058
SIVATHA S A70059022067
Work breakdown structure
1 Introduction
2 Context, Considerations
and Challenges
3 Construction Programme
and Methodology
5 Strategies to reduce
Impact
INTRODUCTION:
ABOUT :
G
A
• A beautiful project
• A well-planned living space
• Flats at reasonable prices
MJ
• Conveniently located, provide
connectivity from all the important
landmarks and places of everyday
utility
DEVELOPMENT PLAN:
Rate of Gami Jade is Rs. 11,000/carpet
I A
sq ft
The development of a new 25 storey
building accommodating residential and
retail uses. The existing ground floor
D
E
and podium will be used to provide
retail, leisure, parking, servicing, plant
and associated infrastructure
01
SITE
BOUNDARIES
CONTEXT 02
• Well-equipped gymnasium
• Cool shimmering blue Pool
• Manicured podium garden
• Sit-outs with panoramic
view
• Clubhouse with indoor
games
• Open air theatre
• Kids play area
• Jogging track
• High speed elevators
• Landscaped garden
AMENITIES
03
VASHI
SITE SURROUNDINGS
06
EXISTING CLP
VEGETATION
PEDESTRIAN PATH
VEHICULAR PATH
CLP- PROPOSED
BY US
METER ROOM
SHOPS
LOBBY
RAMP
METER ROOM
PLOT AREA
LOBBY
LIFTS
TOILETS
VEGETATION
PEDESTRIAN PATH
VEHICULAR PATH
CLP- PROPOSED
BY US
STRATEGIES S
T
R
A
T
E
G
I T
E O
S
R
E
D
U I
CHALLENGES: • NO ADVANCE SAFETY TECHNOLOGY C M
• SIGNAGE WAS MISSING • TRAFFIC CONGESTION E P
• EMERGENCY MEDICAL HELP • TOO MUCH OF HOLDING ON TO A
WASN’T AVAILABLE EQUIPMENTS C
T
CHALLENGES AND STRATEGIES
FACTORS
RECOMMENDATION AND STRATEGIES
INFLUENCING
PROJECT
CONSTRUCTION COST
LOGISTIC PLAN • Installation of rain water harvesting
WORKFORCE
tank
MOTIVATION
• Incorporation of solar panels
SPEED OF
CONSTRUCT • Adapting smart technology
SECURITY
ION • Using a Construction Consolidation
HEALTH AND MATERIAL Centre(CCC), to reduce
SAFETY AVAILABILITY transportation and thus less carbon
emissions
INFLATION • Use of sustainable architecture
• Providing advance safety for
PROJECT
TIME workers, thus adding on to a proper
RELIABILITY time consumption on site
SUPPLY
TASK TIME CHAIN • Proper skilled labours to manage
RELIABILITY PERFORMA the technology
NCE AIR
COMPETITI
VENESS OF POLLUTION
A TENDER LEVELS
• USE OF NEW CONSTRUCTION TECHNOLOGY S
• WELL EQUIPPED AMENITIES
W
S OS
TW
• NO PROPER MAINTENANCE OF EQUIPMENTS AND
MATERIALS O
• NO PROPER METHODOLOGY FOLLOWED FOR ACCESS AT
W N
AN
A
• SELF SUFFICIENT SURROUNDING, PROMOTES SALE LA
• MEETS ALL REQUIREMENTS FOR A BETTER LIFESTYLE YL
Y
O S
S
II
• TRAFFIC CONGESTION, AS LOCATED AT IMPORTANT SS
NODES
• IN CURRENT TIMES , INFLATION CAN BE A THREAT
T WITH PROJECT RELIABILITY
SITE PICTURES
• https://dwello.in/
view/
• https://youtu.be/
DT2bFFHVWFI
REFERENCE:
THANK YOU!