OSBL DPR Dated 16.01.2014
OSBL DPR Dated 16.01.2014
OSBL DPR Dated 16.01.2014
Cumulative Cumulative
Daily Achieved Monthly Monthly Weekly Weekly
Sl. Total Available Achieved Achieved
ITEM DESCRIPTION Unit Planned Today Targets Achieved Planned Achieved REMARKS
No. Scope Front till Prev. Till Date
Qty (QTY) (Jan'14) Qty (Jan'14) Qty Qty
Day (QTY) (QTY)
3 EQUIPMENT ERECTION
3.1 EQUIPMENT ERECTION (Static & Rotary) Nos. 183 183 183 0 0 183 0 0 Completed
PIPING FABRICATION (OVERALL) Inch - dia 43020 43020 43020 0 0 43020 0 0 Completed
5.0 Electrical
5.5 Earth Strip Laying Nos. 6000 6000 6000 0 0 6000 0 0 Completed
6.0 Instrumentation 0 0 0
Page 1 of 9
Coal Gasification Plant, JSPL, Angul, Orissa
Project No. - 0789
DAILY PROGRESS REPORT
Report No. : TP/OSBL/692 Reported on- 16.01.2014
Cumulative Cumulative
Daily Achieved Monthly Monthly Weekly Weekly
Sl. Total Available Achieved Achieved
ITEM DESCRIPTION Unit Planned Today Targets Achieved Planned Achieved REMARKS
No. Scope Front till Prev. Till Date
Qty (QTY) (Jan'14) Qty (Jan'14) Qty Qty
Day (QTY) (QTY)
Page 2 of 9
Coal Gasification Plant, JSPL, Angul, Orissa
Project No. - 0789
DAILY PROGRESS REPORT- OSBL
Report No. : TP/OSBL/692 Reported on-
1.1 Ash Handling System CUM 7256 7256 7256 0 7256 ###
1.1.a Ash Slurry Sump & Pump House CUM 1850 1850 1851 1851 Completed
1.1.b Coveyor Gallery 1A/B & 2B CUM 1220 1220 1221 1221
1.1.f Oversize & Fine Ash silos CUM 700 700 696 696
1.1.g Cable Trench & Pump Fdns CUM 120 120 120 120
1.2 Cooling Tower OSBL (By Petron) CUM 3805 3805 3804 3804
Circulating Water Pump House
1.3 CUM 2530 2530 2531 2531
(By Simplex)
1.4 Side Stream Filter CUM 300 300 300 300
1.4 Feed Water Heating Station CUM 1466 1466 1466 0 1466
1.4.1 Foundation & Plinth Beam CUM 445 445 445 445 Completed
1.4.2 Slab at EL. 7500 (T.O.C) CUM 100 100 100 100 Completed
2.1 Circulating Water Pump House MT 118 118 118 118 Completed
A.3 ASH HANDLING SYSTEM & SS-3 MT 278 278 278 0 278
Page 3 of 9
Coal Gasification Plant, JSPL, Angul, Orissa
Project No. - 0789
DAILY PROGRESS REPORT- OSBL
Report No. : TP/OSBL/692 Reported on-
Cumulative
Cumulative Achieved
Sl. Available Achieved
ITEM DESCRIPTION Unit Total Scope Achieved till Till Date REMARKS
No. Front Today
Prev. Day
Qty
2.1 Circulating Water Pump House MT 118 118 118 118 Completed
Page 4 of 9
Coal Gasification Plant, JSPL, Angul, Orissa
Project No. - 0789
DAILY PROGRESS REPORT- OSBL
Report No. : TP/OSBL/692 Reported on-
Cumulative
Cumulative Achieved
Sl. Available Achieved
ITEM DESCRIPTION Unit Total Scope Achieved till Till Date REMARKS
No. Front Today
Prev. Day
Qty
1 Fabrication Inch - dia 35120 35120 35120 0 35120
Page 5 of 9
Coal Gasification Plant, JSPL, Angul, Orissa
Project No. - 0789
DAILY PROGRESS REPORT- OSBL
Report No. : TP/OSBL/692 Reported on-
Cumulative
Cumulative Achieved
Sl. Available Achieved
ITEM DESCRIPTION Unit Total Scope Achieved till Till Date REMARKS
No. Front Today
Prev. Day
Qty
1 Fabrication Inch - dia 13000 13000 13000 13000
ELECTRICAL
A Substation
1.1 TRANSFORMERS
1.1.1 Transformers Nos. 13 13 13 13
1.2 SWITCHGEAR
1.3.1 Switchgears Nos. 61 61 61 61
1.3 MISCELLANEOUS
1.3.1 Earth Pits Nos. 80 80 80 80
1.3.2 Earthing Strip Laying RM 6000 6000 6000 6,000
1.3.3 Cable Tray Erection RM 6500 6500 6500 6,500
1.3.4 Cable Laying RM 201000 201000 201000 201,000
Overall Electrical Cable laying RM 201000 201000 201000 0 201000
INSTRUMENTATION
DM Water & Cooling Tower
A1 INSTRUMENTS 592 592 560 0 560
1.1 Total Instruments Installation Nos. 592 592 560 560
Page 6 of 9
Coal Gasification Plant, JSPL, Angul, Orissa
Project No. - 0789
DAILY PROGRESS REPORT- OSBL
Report No. : TP/OSBL/692 Reported on-
Cumulative
Cumulative Achieved
Sl. Available Achieved
ITEM DESCRIPTION Unit Total Scope Achieved till Till Date REMARKS
No. Front Today
Prev. Day
Qty
A.2 MISCELLANEOUS
2.1 Cable Tray Erection RM 1200 1200 1200 1,200
2.2 Cable Laying RM 9000 9000 9000 9,000
TOTAL INSTRUMENTATION CABLE
RM 9000 9000 9000 0 9000
LAYING
Note:-
Page 7 of 9
PROJECT : Coal Gasification Plant, JSPL, Angul,Orissa
Project No : 789
DPR NO :
Coal Gasification Plant, JSPL, Angul, Orissa Report Date:
Progress Date:
MANPOWER STATUS - OSBL
CONTRACTOR'S MANPOWER
MECHANICAL CIVIL & STRUCTURE
Sr. No. Designation Shift
M/s Siva M/s Simplex M/s Petron M/s
M/s Allied Ion M/s. Melco
Sakti Resin India M Tech Lube Das Cons. Voltas Gactel (Ash (Ash Simplex(ETP/ M/s L&T M/s Petron M/s Sunil Essar
Energy Exchange India P Ltd.
Construction Handling) Handling) FWHS, 92)
Day 1 1
1 Manager
Night
Day 1 1 2 1
2 Engineer
Night
Day 1 2 1 2
3 Supervisor
Night
Day
4 Mason
Night
Day
5 Carpenter
Night
Day
6 Bar bender
Night
Day
7 Surveyor
Night
Day
8 Chipper
Night
Day 1 1 2 1 1
9 Fitter
Night
Day
10 Fabricator
Night
Day 1
11 Welder (Strl)
Night
Welder Day 1 1
12
(Piping) Night
Welder Day
13
(Tank) Night
Day 1 1
14 Grinder
Night
Day 1
15 Gas Cutter
Night
Day 6 6 2 6
16 Rigger
Night
Day
17 Khalasi
Night
Day 5 2 2
18 Helper
Night
Day
19 Operator
Night
Day
20 Blaster
Night
Day
21 Painter
Night
Day
22 Others
Night
Day
23 Tack Welder
Night
Total 0 0 0 2 18 0 0 12 5 17 0 0 0 0 0 0 0
Total 54 0
Cummulative 54
TP/OSBL/692
16.01.2014
15.01.2014