Professional Documents
Culture Documents
Gedion Z.-DESGIN OF HEAT RECOVERY SYSTEM FOR BOILER
Gedion Z.-DESGIN OF HEAT RECOVERY SYSTEM FOR BOILER
Main customers: The end users/customers are every person aged above 18 years
old. The products are distributed across the country in four regions and three
ware houses. These are:
Region1:covers Amhara;Benishangul and Afar region.
Region 2: covers the whole Tigray region.
Region 3: covers central and western part of Ethiopia.
Region 4: covers east and south parts of Ethiopia as well as in the foreign
country such as Australia ,Israel & South Sudan.
Work flow of the company: Gonder
Dashen
Brewery s.c
Beer processing
Utility section Production section
section
Brew Section:
In brew house malt from raw materials stock entered in to mill star. The
type of mill star is white mill. The entered malt milled by roller with the
help of warm water.
Utility section:
It is the backbone of the company. Because, it is the sources of power
supply, air compressor, steam, process water, glycol and purified
carbon dioxide those have significant impact on production. Utility
section comprises many plants.
production room: It consists of Beer filling and packing process of
bottled beer.
Tools:
extractor to extract bearings, gears
welding machines
grinders
pipe wrench
Allen key set
Major Challenges And Problems Identified:
In Terms Of Improving
Entrepreneurship Skills
The main objective of this project is to design boiler blow down heat
recovery system which will recover the heat lost due to boiler blow
down.
Specific objective:
Analyze the economic feasibility of heat recovery system
Decide on how the heat recovery system looks
Design hot water storage tank
Design heat exchanger
Select servo meters
Design piping
Design insulation
Methodology
Identifying The Problem
Collection Of Data
Material Selection
Design Analysis
Preparation of Working
Drawing
Design analysis:
Heat Recovery System:
Installing a heat recovery system for a boiler system can save a
considerable amount of money and help in achieving healthy steam
generation Due to the instant pressure decrease when the blow down
water flows to flash tank some of the water flashes off, thus the heat is
wasted in two forms. This obliges to have two ways of recovering
heat:
Flash steam recovery to the de-aerator
Heat recovery using the heat exchanger
Since steam is distilled water, the flash steam is pure to use it back to the
de-aerator to expel oxygen and other dissolved gasses. To
accommodate the intermittent blow down with flow rate requirement
of de-aerator and heat exchanger, servo meter and hot water storage
tank is used respectively.
Con…
we need a storage tank to supply a constant supply of hot water to the heat
exchanger due to two reasons. These are
when during bottom blowing down, hence the total hot water is allowed to
pass through the heat exchanger, it causes the makeup water which is at
lower pressure (1 bar in the de-aerator) to vaporize before the feed pump
which is risky to the pump.
it is better to supply constant flow of fluid to heat exchanger to avoid
thermal crack of heat transferring surfaces.
Diagrammatically the heat recovery system is to be combined with the boiler
system as follows. Both the bottom and surface blow down water flows to
the flash tank. Part of it flashes to steam and goes to the de-aerator. The
servo meter adjusts the valve of the steam pipe as per the flow rate of the
flash steam. The remaining (residual blow down) flows to the hot water
storage tank and the servo meter adjusts the valve to feed the required hot
water to the heat exchanger as per the flow rate or outlet temperature of the
makeup water to heat up the makeup water and then discharged.
Diagrammatically:
Hot Water Storage Tank Design:
Due to the bottom blow down the flow rate of water to the heat recovery
system varies. So the amount of heat to be recovered fluctuates. So we
need to have some mechanisms which supplies constant flow rates to
the system. The extra hot water and steam is to be stored and used
continuously throughout the boiler operation hour.
The storage tank is subjected to loads from
Hydrostatic pressure of the fluid
Internal pressure of the fluid
Thermal stresses
The tank is designed based on the pressure vessel design principle and
then the thickness is checked for the hydrostatic pressure.
Result:
drawing quantity Dimension Name Material
As we try to discuss in the theoretical part we can match it with the design
analysis above by calculating the required parameters and as much as
possible we try to solve the problem for the company .the solution has its
own positive impact for company and costumers like by saving
economic aspect and hazard of environment. The calculated parts are
really and practically accepted. we have discussed also the overview of
the company with its image on the costumer as it must use mechanical
parts instead of manual power for production of good quality and
quantity.
Recommendation:
There is highly energy loss in work kettle and bad noise in the
environment but it does not affect even if it need to recover (recycle)
that heat loss (energy loss).
The boiler operator should take the mandate to control it after being
installed and the servo meters must be checked regularly.
Conclusion:
The heat recovery system looks economical to install saving
very considerable amount of money with very shorter payback
period. It will recover more than 233.6 kW of energy which
means saving more than 3.7% of furnace oil which is costy and
pollutant. It increases the boiler efficiency by more than 1.95%
and will reduce 65.42 kg of co2 emissions per day. Again it
saves more than 31.1 liters of service water per day. So
installing the heat recovery system is economical.
The project also paves the way to other boiler efficiency
improvement options. It is also attractive than any other heat
recovery systems when seen from the length of pay pack period.
.
THANK YOU FOR
YOUR ATTENTION…