Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

VFJ-520 Manual en

Download as pdf or txt
Download as pdf or txt
You are on page 1of 39

VFJ-520 Full Automatic Vertical Packing Machine

Manual
Content
1. Preface ----------------------------------------------------------------------- 1

2. Safety Notice ---------------------------------------------------------------- 2

2.1Safety Notice and Marks -------------------------------------------------- 2

2.2Working environment ------------------------------------------------------ 2

2.3Attentions -------------------------------------------------------------------- 3

3. Technical Parameters ------------------------------------------------------- 3

3.1Packing machine technical Parameters ---------------------------------- 3

3.2Optional accessories match with the machine -------------------------- 4

4. Machine installation -------------------------------------------------------- 4

4.1 Structure of the machine -------------------------------------------------- 4

4.2 Before turn on the Machine ---------------------------------------------- 6

4.3 Install roll film ------------------------------------------------------------- 7

4.4 Film install drawing ------------------------------------------------------- 8

4.5 Adjustment of vertical sealing ------------------------------------------- 8

4.6 Color code sensor detecting and adjusting ---------------------------- 9

5. Operation interface introduction ----------------------------------------- 10

5.1 Starting --------------------------------------------------------------------- 11

5.2 Main menu ----------------------------------------------------------------- 11

5.3 Automatic ------------------------------------------------------------------ 12

5.4 Manual page --------------------------------------------------------------- 13

5.5 Function page ------------------------------------------------------------- 15


5.6 Parameter setting --------------------------------------------------------- 15

5.7 Alarm ----------------------------------------------------------------------- 18

6. Troubleshooting ------------------------------------------------------------ 20

7. Maintaining ----------------------------------------------------------------- 22

7.1 Wearing part replacement ----------------------------------------------- 22

7.2 Maintaining --------------------------------------------------------------- 22

8. Electric diagram ----------------------------------------------------------- 22

8.1 IO point diagram --------------------------------------------------------- 22

8.2 Main electric circuit diagram ------------------------------------------- 25

8.3 Electromagnet circuit valve diagram ---------------------------------- 26

8.4 Weigher and cup device circuit diagram ------------------------------ 27

8.5 Auger device circuit diagram ------------------------------------------- 28

9. Pneumatic diagram -------------------------------------------------------- 29

10. Listing of spare parts with the machine ------------------------------- 30

11. Attachments --------------------------------------------------------------- 31

11.1 Code printer manual ---------------------------------------------------- 31


1. Preface

Thanks for Choosing VFJ-520 vertical packing machinery. Please read this
instruction thoroughly in order to get a better understanding of operation and
maintenance. We also provide professional after-sale service in case you need.
The sell point of our VFJ-520 is easy operation, high efficiency, safety and stability.
Some of the functions are different from the counting and filling device so this
instruction only describes basic functions.
VFJ-520 is auto feeding, counting, forming bags, filling sealing, printing and
carrying away.
If any problem occurs, please read the book to find a solution or contact with our
after-sale service to better solve the problem.
Every single part of the electricity had been checked but if you have any trouble
installing the machine, please contact us.
Operating according to the instruction will make it easier during the production and
avoid unpredictable situation.
Operate in safe production environment.

Contact information of HONOR PACK.

CHINA.ZHEJIANG
WENZHOU HONOR PACKAGING MACHINERY CO., LTD
4th Floor, Block H, Wisdom Vally, Station Ave.
Wenzhou, Zhejiang, China
Wing huang Phone:+86 13676772213
Fax:86-577-5669-2637
E-mail:marketing@honorpack.com

Wed:www.honorpack.com

-1-
2. Safety Notice
2.1 Safety Notice and Marks
On the left side of this instruction, there are marks.
Please remember the following marks and their meanings.
For a safe using environment, every person using this machine must know the
marks meaning.

Dangerous
Dangerous marks stand for the working part may cause hurting and harming to
people.

Warning
Warning marks stand for may cause damage to machine, people and need to operate
to the instruction.

Notice
Notice marks stand for preventing unpredictable damage or problem to the machine
or people when doing something to the target part.

工作时请勿接近!
Work please keep out!
Watch out
Watch out marks Stands for non-operator should keep a distance form the working
machine.

2.2 Working environment


1). Temperature:0-40℃, humidity:35-85%

-2-
2). Power and voltage: AC 200V ~ 240V 50/60Hz
3). Installation requirement:
4). Frame of the equipment should safe and reliable
5). Frame should connect to ground electrode
6). Stay away from severe interference
7). Don’t apply in corrosive environment.

2.3 Attentions
1). Read instruction and set the correct parameters at first running.
2). Connect the machine to ground electrode
3). Clean and withdraw all the products in side the machine before each running.
4). Sterilize contacting part of food and roll film everyday.
5). Cut off pneumatic and electric supply before maintenance or cleaning.
6). Fix must be done by profession engineer while electric and pneumatic parts
break down.
7). No touching to the mechanical part and electric parts while machine was
running.
8). Do not use shape object to touch the screen.
9). Machine cannot place at explosive environment.

3. Technical Parameters
3.1 Packing machine technical Parameters

Total power 2.2KW

Packing product puff food, cookies, beens, peanuts, nuts and etc; powder, flour and etc

Horizontal sealing
OPP/CPP、CPP/PE
Packing material heating element 800W/AC 220V
MST/PE、PET/PE
power(total)

Thickness of the vertical heating pipe


0.05—0.08mm 500W/AC 220V
packing film power
Measuring range of
Max roll film width 420mm 10—1200ml
the bag
Air pressure
Max bag size 200mm(W)x300mm(L) 0.65Mpa
required

Packing speed 5—60bags/min Air consumption 0.3m3/min

-3-
1080(L)*1300(W)*
Total weight 540Kg Dimension
1400(H)mm
Note: Packing material should choose roll film which roll film width≤420mm,
and the roll film inner Φ75mm, thickness of the film is 0.05-0.08mm, the surface
of the film should be smooth, no pattern and words should be printed at the
10mm form the edge of the film, the eye mark color should be obvious telled
from the background.

3.2 Optional accessories match with the machine


Name Function
14 heads combine Matching with packing machine to reach high speed and
weigher accuracy
10 heads combine
Matching with packing machine to reach high accuracy
weigher
Vibrating hopper Vibrate feeding
Z shape elevator Automatic feeding to the weigher
Single hopper elevator Automatic feeding to the volumatic cup device
Manual droping block or fragil product to hopper to reach
Bucket feeder
one dump one pack
Finished product
Finished product carry away machine
elevator
Round rotating table Round rotating table for easy picking.
Matching with auger filler to elevate powder and flour
Auger elevator
product
Vacuum elevator Elevating material in a good environment.
Auger filler Measuring powder and flour product
Big four head weigher Suitable for big bulk prodcut measuring and filling
Weight detecting Selecting finished product which can not reach the target
machine weight

4. Machine installation
4.1 Structure of the machine

-4-
Pic.4-1 front side
1 operating system 2 Emergency stop
3 Temperature controller 4 Power switch

-5-
Pic.4-2 whole machine structure
1 Horizontal sealing cylinder 2 Roll film stablize Inflatable shaft
3 Roll film reducer motor 4 Date adjusting rod
5 Carry film motor 6 Vertical sealing position adjust wheel
7 Angle adjusting pole(roll film and collar) 8 Bag former collar
9 Bag former tube 10 Vertical sealing mechanism
11 Carry film belt 12 Horizontal sealing mechanism
13 Finish product buffer board

4.2 Before turn on the Machine


1). Choose suitable leakage protection switch
2). If the material elevator works separately, pls choose leakage protection switch
-6-
according to the power and a PF power.
3). The machine must connect to the ground wire. (there is a mark on the machine
frame)
4). Connect air pipe to pnuematic FRL behind the machine.
5). Install date printing code and ink ribbon
6). Turn on the power and set horizontal and vertical sealing bar and date printer to
temperature needed, double check if the ribbon, roll film and eye mark is install
correctly.

4.3 Install roll film


1). Put the roll film in the Inflatable shaft.

Pic.4-3-1 Film install

2). Correct the position according to the deviding ruler.

Pic.4-3-2 Adjusting position

3). Use the gas gun to fill up the Inflatable shaft in order to stablize the roll film.

Pic.4-3-3 Stablize the roll film

-7-
4.4 Film install drawing

Pic.4-4 Film install drawing

4.5 Adjustment of vertical sealing


1). Bag former and vertical sealing adjusting (as the picture):
Stablize the bag former, loose ②, roll ① to adjust the distance of vertical sealing
and bag former tube to be at 8mm(if the vertical sealing is direct press), and to be
2mm if the bag press type is side press. Finally lock ②.

Pic.4-5-1 Change bag former, adjust vertical sealing

-8-
1 Hand wheel(adjust vertical sealing distance) 2 Tighten bolt
Vertical sealing heating
3 Bag former tube 4
element

2). Back seal side turning (when using side sealing)


Open the side turning device, turn back seal to the side you want and close the side
turning device
Requirement: Distance of forming tube and point A should be 2mm.
Distance of forming tube and point B should be 4mm.

Pic.4-5-2 The edgefold on Vertical sealing device


1 Back seal turning device 2 Forming tube

4.6 Color code sensor detecting and adjusting


Optical fiber color code sensor detection sensor combines optical technology,
photoelectronic technique and modem technology. It has high sensitivity, fast
response speed, good anti-bias light interference capacity, small volume and easy
operation strength. Working as a sensor in the packing machine operating system,
color code sensor is making the code detection and location, bag length cutting, film
rectifying easier. However, as customer’s film is different from our testing film, the
color code may not be catch. So its secsitivity will be need to set.
1). Loose the bolt of the sensor, move the sensor, the optical fiber bolt movement
decide the point of the light, the smaller the better. Aim the light to the middle of the
code (which is on the edge and are revert to the background color), then tight the
bolt(as the picture).

-9-
Pic.4-6 Adjustment the color code position

2). After doing 1, press the ON bottom at the sensor amplifier while the red and the
green light will on.
3). Then point the light to the background color which is normally brighter than the
color code, press OFF while only green light on.
4). Testing of the color code. Pull the film using your hand, see if it is red and green
light on when the light point at the color code(see if it is only green light on when the
light point at background color.), if not, pls set again according to step 2 and 3.
5). When setting bag length, bag should be X+20mm.

5. Operation interface introduction


The operation interface mainly consists of the following 8 functions:
1). Contact us---the information of our company.

- 10 -
2). Language select---Normally with Chinese and English, and date setting.
3). Main page---function page easy access page
4). Auto---automatic running function and other shortcut.
5). Manual---manual test function.
6). Function---open or close some function.
7). Parameter setting---adjust the bag length, speed, pull film delay, pull film
frequency and other detail parameters.
8). Alarm---shows the problem occur in the machine program.

5.1 Starting
Select the language and enter the main menu.

Pic.5-1 Startup interface

5.2 Main menu


Choose the option to enter.
Press time part can change date and time.

- 11 -
Pic.5-2 Main menu interface

Auto Auto running according to the preset parameter and function.


Manual Test the machine working according to the manual option
Function Open or close the additional function according to the need.
Parameters Adjust function and parameters.
Alarm Set the parameters of the alarm sector
Pre page Back to the start up interface

5.3 Automatic
Select Auto from Main menu to enter the Auto page.(P-5-3)

- 12 -
Pic.5-3 Automatic operation interface

Product No. of the product which you could set certain product parameter for it.
Weight The target weight you choose this program to be.
Bag length The bag length which apply right now
Press filling pack it will auto run packing process and press stop it will
Filling pack
stop.(two bottom in one)
Test Press test, machine will start making empty bags for testing.
Carry film wheel Press the bottom, will open or close the carry film wheel
Spin Change the number of turns(only match with auger filler)
Actual speed Actual packing speed.
Jog will make the structure move up and dowm step by step.(when the
Pull film structure
machine is horizontal pulling film structure)
Filling bags Records of the filled bags
Testing bags Records of the tested bags
Clear Clear the records
Rectify the film of back seal error(when the machine contain rectifying
Rectify
function)

5.4 Manual page


Select manual bottom and enter the following page (as the picture 5-4):

- 13 -
Pic.5-4 Manual page

Pulling film Run the film according to the preset bag length
Make one empty bag Making empty bags one by one according to the preset parameter
Vertical sealing Make vertical sealing run once
Horizontal sealing Make horizontal sealing run once
Cutter Make cutter run once
Withdraw material Withdraw material in the counting filling device
Flashing air Run flashing air function once
Savler bag Run savler bag device once
Pushing bag Run pushing bag device once
Gusset device Run gusset device once
Printer code Run printer device once
Reset the servo motor or horizontal film pullling structure(only in
Reset pulling device
the machine which have these device)
Manual elevator the products(only effective when the manual mode
Stop elevating products
to be turn on in the function page)
Mix motor off Turn on or off mix motor(only work when you have auger filler)
Round table off Turn on or off round table
Move the pull film structure up once(only when the machine is
Pull film device up
hori.sealing pull film)

- 14 -
Hori.jaws open Open horizontal jaws(only the machine have hori.sealing servo)
Move the pull film structure down once(only when the machine is
Pull film device down
hori.sealing pull film)

5.5 Function page


Press the function bottom and enter

Pic.5-5 Function page

Eye mark Turn on/off eye mark tracking


Flushing air Turn on/off flashing air
Gusset device Turn on/off gusset device
Printer code Turn on/off code/date printing
Turn on/off elevator, when on, you can chose auto elevating or
Type of supply products
manual.

5.6 Parameter setting


Select parameter bottom and enter (as the picture 5-6-1)

5.6.1 Parameter setting page 1:

- 15 -
Pic.5-6-1 Parameter setting page 1

Save After changing the parameter you should save


Next page Click to enter next page
Pro.no You can restore 8 product parameter
Weight You can mark weight of the parameter preset
Set the bag length you need(if you turn on the eye mark, the bag
Bag length
length need 20mm longer than the eye mark distance)
Target speed Preset the packing speed
Pulling film servo motor delay(the delay time after a serial
Pulling film delay movement of hori.sealing vertical sealing, cutter, flushing and
gusset device)
The speed of the film pulling motor(lager the number, faster the
Pulling film frequency
speed), the number should not exceed 60000hz
Hori.sealing delay Hori. Sealing electronic magnet close delay time.
Hori.sealing time Hori. Sealing electronic magnet close time
Vertical sealing delay Vertical Sealing electronic magnet close delay time
Vertical sealing time Vertical Sealing electronic magnet close time
Cutter delay Cutting delay time
Cutter time Cutting time
Flushing gas delay Delay time of the flushing air

- 16 -
Flushing gas time Flushing air during time

5.6.2 Parameter setting page 2:

Pic.5-6-2 Parameter setting page 2

Gusset delay The delay time of the gusset movement


Gusset time During time of the gusset movement
Printer delay Delay of code printing
Printer time Code printing time
Salver delay Salver delay time
Salver time Salver time
Push delay Push product delay
Push time Push product during time
Open/close door products falling
Leak proof delay time
down delay
Open/close door products falling
Leak proof open time
down time
Pack delay Sealing delay after filling signal
Filling delay Delay time to fill when cutting run

5.6.3 Parameter setting page 3:

- 17 -
Pic.5-6-3 Parameter setting page 3

Connecting Number of serial bags


Filling times Sealing after filling__times
1mm pulse number Pulse number required when pull 1mm film
Length of vertical sealing, when the preset bag length longer
Vertical sealing length
than vertical length, it will need two times of pulling film
The delay time of adding material when detecting there is no
Elevator delay
material
One ring pulse ring The required pulse of one spin of the auger
Auger number of The spin time of the auger, more spins, more product filling,
turns(weight) and more weight.
Auger speed frequency Spinning speed of the auger
The pull film structure go up delay time(only functional in
Pull film structure up delay
horizontal sealing pull film machine-320V)
Set the pull film structure back to the start point (only
Pull film structure start point
functional in horizontal sealing pull film machine-320V)

5.7 Alarm
Click alarm to enter (as picture 5-7)

- 18 -
Pic.5-7 Alarm interface

Low temperature Alarm will be tricked when the actual temperature lower than
alarm preset temperature 10℃.

Auger servo alarm When problem occur to the auger servo


Film pulling servo
When problem occur to the pull film servo
alarm
Hori.sealing alarm When problem occur to the hori.sealing servo
When date printer run out of ribbon or has a problem, the alarm
No ribbon alarm
will be trick. The time on the right is the delay time.
No film alarm When detecting there is no film signal, the alarm will be tricked
When the material sensor detects no material, the alarm will be
No material alarm
tricked.
When turn on the eye mark tracking, the alarm will be tricked if
Color tag seek erro
there is no eyemark be tracked.
Note:
①Reset: only can reset eye mark error alarm. Other alarm will reset when fix the
problem.
②The machine will stop when there is an alarm being tricked
③Pls save the parameter after change, otherwise, the parameter will not restore
④The parameter setting will affect the packing speed directly. The larger the
parameter is, the slower the packing speed will be.

- 19 -
6. Troubleshooting
Fault type Reason Eliminating method
1. Reset the alarm
1. Check the alarm 2. Turn on the machine after 20
No response when
2. Servo controller alarm seconds after turn down the
touch the touching
No communication between PLC machine, and set the horizontal
screen
and human-machine interface sealing to the original place.
Check the communicate wire.
1.the wire cover is tore out. 1.check protective tube of the
Electric leakage 2.heating sheet and other switch
switch trips electrical appliances have electric 2. check electric appliances one
leakage by one, eliminate
1. protector of open circuit trips 1. check and eliminate open circuit,
2. heating sheet burnt out recover it
Sealing jaw not hot
3.temperature control meter 2. replace heating sheet
damaged 3. replace temperature control
Can’t modify the
Thermal couple connect loose Tight the Thermal couple or
temperature setting or
or damage change it.
display abnormal.
Temperature is
normal when 1. environmental voltage is low, 1. reduce packing speed or add
closedown, but causing descending of power of voltage stabilizing device
descends heating sheet 2. replace it with heating sheet of
continuously when 2. power of heating sheet is too low bigger power
running
1. properly increase temperature
2. check if total pressure is 6.5
1. temperature is insufficient
kilograms
2. pressure is insufficient
3. properly increase sealing time
Air leak at sealed 3. sealing time is too short
parameter
mouth of packing bag 4. irregular front and back
4. carefully adjust parallel status of
horizontal sealing rolls
mouth of horizontal sealing roll
5. material clamped
5. adjust baiting time or inflation
delay
1. side of packaging film 1.replace packing film
cockles or photoelectric wrong 2.re-adjust photoelectric
action caused by poor quality of sensitivity
Cutting position or
light path 3.increase bag length
cut into half a bag
2. sensitivity of photoelectric 4.close the eyemark tracking, make 5
can not be
head isn’t adjusted well empty bags to see if the length is
controlled
3. bag set length is insufficient and same. If not the belt is to smooth, pls
different lengths caused clean it.
4. Belt wear out and is not rough to 5.asume the eyemark distance is X

- 20 -
carry the film pls set the bag length to be
5.the board under the eye mark X+50MM.
sensor is out of shape.
6.bag length is set not correctly, the
length is lower than the eyemark
distance
1. pressure of conveyance film 1. check if pressure of conveyance
cylinder is insufficient or too film is 2.5 kilograms
The film cannot be
much 2. scrape surface of belt with saw
carried down
2. belt slides of damaged sheet or replace it
3. static of packing film is too big 3. replace packing film
1.file the cutter or change the
1.the knife/cutter is rust or bend cutter
2.sealing jaw mesh diviation 2.adjust the sealing jaw position
Cannot cut the bags
3.cutting delay and cutting time so that the cutter can come out.
is not match 3.set the cutting delay and cutting
time appropriate.
1.temperature is not appropriate
so the ribbon cannot print. 1.adjust the temperature to
2.distance is to far between the suitable one.
Code is not clear or
film and the printer. 2.adujust the distance
air leakage of the
3.tempreture is too high or the 3.lower the pressure of the
printing area
pressure of the cylinder is too cylinder
high 4.change the ribbon
4.ribbon has bag quality.
Motor not working 1.starting capacitance break. 1.change the starting capacitance
or work all the time 2.solid relay or intermediate 2.change solid relay or
when turn on the relay break. intermediate relay
power 3.problem occur in the motor 3.change motor
1.close the power and restart
after one minute. Check the
1.servo motor or driver error alarm code on the servo screen
Film pulling system
alarm and tell us.
and conveyor not
2.frequency converter overload 2. close the power and restart
working
alarm after one minute, check the
alarm code on the coverter
screen and tell us.
1.Product dropping time is not
appropriate
1.adjust the dropping time.
Broken bags and 2.speed too fast and material
2.lower the packing speed
seal jaw clip the too light
3.adjust bag length
product 3.bag length is too short
4.adjust the parameter.
4. packing time and dropping
time is not match

- 21 -
7. Maintaining
7.1 Wearing part replacement
1). If the carry film belt wear out, pls loose M6 bolt on the top, replace the belt and
tight the bolt again.
2). Replace the cutter, loose two M5 bolt and take out the cutter in the cutter groove
(mind the heat if the jaw was heating), replace it and tight the bolt. Also install the
cutter according to the division.
3). When run out of ribbon, take out the rest of the wheel from the wheel groove
and replace with new ribbon. (pls review the code printer install and using instruction)

7.2 Maintaining
1). On the first running, pls make sure all the bolts are tight, and check form time to
time. If there is any abnormal noise, pls stop the machine immediately. Pls keep the
machine running for 2-3 min after installation or before working.
2). Check the FRL oil tank, and keep the oil more than 1/3. If oil needed to be
added, pls use 20# pure engine oil
3). Keep the eyemark sensor clean and keep the electric part from moisture.
4). Tighten the bolt of the sealing (if there is any bolt is loose) after stop using the
machine.
5). Before running the machine, pls add the oil cup full with 20# engine oil.
6). Take out the roll film to prevent it bend the roller.
7). When running, if broke bag situation happen, pls use emergency stop, and use
cooper brush to clean the sealing jaw.
8). First change of engine oil of the gear box is 40 hours using. Thereafter, per 1000
hour using should change once.
9). If the machine haven’t been used for a long time, pls keep the machine running
testing mode for 0.5-1 hour, every 5-6 day once.

8. Electric diagram
8.1 IO point diagram

- 22 -
- 23 -
All translation for the IO point diagram:
1) color code signal 26) pull film servo up limit alarm
2) packing signal 27) pull film servo lower limit alarm
3) emergency stop bottom 28) pull film pulse
4) pneumatic bottom 29) auger/horizontal sealing up-down structure
5) stop bottom 30) horizontal sealing pulse
6) no color ribbon signal 31) pull film reverse signal
7) cutter signal 32) weigher 50, 51/volume cup device
8) low temperature signal 33) horizontal sealing electromagnet
9) no product signal 34) vertical sealing eletromagnet
10) no film signal 35) horizontal sealing up-down structure reverse signal
11) door safety signal 36) horizontal sealing reverse signal
12) horizontal sealing original position 37) cutter electromagnet
13) film release signal 38) carry film wheel electromagnet
14) film release break signa 39) gusset device/serial bag making eletromagnet
15) auto film position rectify signal-left. 40) gas flushing electromagnet
16) auto film position rectify signal-right 41) leak proof electromagnet
17) rectify left limit 42) code printer electromagnet
18) rectify right limit 43) bag salver electromagnet
19) auger filler gate open alarm 44) bag push electromagnet
20) pull film servo alarm 45) rectify film position-left
21) auger servo alarm 46) rectify film position-right
22) Material elevator motor alarm 47) elevate product
23) mix motor alarm 48) film release motor
24) volume cup device motor alarm 49) mix motor
25) horizontal servo alarm 50) round table motor
51) alarm reset output

- 24 -
8.2 Main electric circuit diagram

- 25 -
8.3 Electromagnet circuit valve diagram

- 26 -
8.4 Weigher and cup device circuit diagram

- 27 -
8.5 Auger device circuit diagram

- 28 -
9. Pneumatic diagram

- 29 -
10. Listing of spare parts with the machine
Accessory List:

Horizontal sealing heat susceptor ----------------------------------- 4 pieces

Vertical sealing heat pipe ------------------------------------------- 2 piece

Interior hexagon spanner 4-10mm ----------------------------------- 1 set

Open ended spanner 14-17---------------------------------------------1 set

Open ended spanner 8-10 --------------------------------------------- 1 set

Carrying film synchronous belt ---------------------------------------2 pieces

Copper brush 120mm -------------------------------------------------- 1 piece

Blade 263mm ----------------------------------------------------------- 1 piece

Oil pot 150ml ------------------------------------------------------------1 piece

Word Button ------------------------------------------------------------- 1 box

Printing date specification---------------------------------------------- 1 piece

Temperature controller specification ----------------------------------1 sheet

- 30 -
11. Attachments
11.1 Code printer manual

Pneumatic Ribbon Date Coder Manual


1) Main Structure

2) Performance and Technical Parameters


The ribbon coder is applicable to vertical intermittent packing machines like bag
filling sealing machine, granule packing machine, liquid packing machine and

- 31 -
labeling machine to print production date, lot number, price and weight on any soft
packaging material such as plastic film, PP, OPP, paper bags, label, leather and so on.
It adopts high precision cylinder, the print speed synchronous with packing speed, and
the coding results accurate and efficient.
It adopts thermal printing ribbon and the out print characters are clear and endurable.
With compact size, easy operation, repair and maintenance, it is widely used in the
industries of foodstuff, beverage, and pharmaceuticals etc.

Technical Parameters
Driver Air Cylinder
Print Speed 0-150 times/min
Power supply Single Phase 220V/50Hz 150W
For single row: max. at 4*35mm, 15 types.
Print Area For double row : max. at 8*35mm, 30 types
For triple row: max. at 12*35mm, 45 types.
Dimension 400mm *210mm*250mm
Weight 4kg
Ribbon (max. width at 35mm, diameter of standard
Consumable
core at 25mm)

3) Description of Control System

Panel of Temperature Control Box


Temperature
Scale 0 1 2 3 4 5 6
Temperature ℃ 0 80 100 120 140 160 180

- 32 -
Temperature Control Knob: Turn on the power, the controller system automatic
boot up the heating function. Set temp. control knob at position 2 and the heating
indicator lamp lightens red. After preheating for 3-5 minutes, turn on the work switch,
coding machine begins printing. Turn the temp. control knob clockwise to speed up
heating, Conversely, turn counter-clockwise to slow down. To preheat the machine
quickly, turn the temp. control knob at max. position, after the required temperature is
obtained and then adjust it to the optimal scale. When the temperature reaches highest
point, the constant temp. lamp lightens green.

4) How to Install and Replace Character Types


Slightly push inwards print head handled, at the same time, turn it by 90-180 ℃ ,
Undo hook head and pull out print head, and unscrew the brass character locknut on
print head to replace characters types. The types should be arranged at the same height
without deflection. Never use a metal rod to knock the types, as it may damage them.
(As shown in the diagram)

5) How to Install and Replace Ribbon


Unscrew (not screw out) the ribbon replacing nut on ribbon feeding roller, take off
active organic glass baffle, mount on thermal printing ribbon and active baffle. The
baffle should be close to the side of thermal printing ribbon. Wind the ribbon in the
way indicated in the diagram below. Unscrew the ribbon replacing nut on ribbon
callback roller, take off active baffle, mount on hollow paper cylinder (the remains of
used-up paper cylinder), glue the ribbon tip onto the hollow paper cylinder with
sticker in the same direction as indicated in the diagram, mount on active baffle, then
screw in the ribbon replacing nut.

- 33 -
6) How to Adjust Ribbon Width
Adjust the axial position of ribbon retainer, but no need to adjust the inside retainer,
to make the distance between the two retainers 1mm wider than ribbon width.

7) How to Adjust the Resistance of Ribbon Feeding


Ribbon should be kept not to be loosened (moderately tightened at least) when
coding machine is running a printing program. Try to minimize the resistance of
ribbon feeding, but not too low, as thermal printing ribbon must be assured of enough
tension after printing so that it will not be stuck to the material printed, or run crooked
when ribbon is moving.

8) How to Adjust the Stroke of Connecting Rod


Adjust the stroke of connection rod according to the thickness of the materials to be
printed on. Make sure that printer head is able to closely press upon the materials
when at the lowest position, 1-2mm lower than the highest point of the materials to
ensure clear printing. Over high pressure will result in ribbon and material broken,
and unclear printing; ultralow pressure also will cause unclear printing.

9) How to Adjust the Stroke of Ribbon Feeding


Adjust the space adjusting screw for ribbon feeding stroke up and down to alter the
ongoing space of ribbon, upward for less space, and downward for larger. The space
between rows should better be kept at 1mm, thus to save the ribbon.

10) Description of Circuit Theory

- 34 -
11) Common Failures, Causes and Solutions
Failure Cause Solution

Inadequate preheating, it should


take at least 15 minutes. In the
case of emergency, set the temp.
Temperature too low control knob to max. scale and
then reset at the optimal scale to
lower the temp. after temp. is
obtained.
Too high temperature
Unclear which causes scalded and Lower the temperature
printing colorless character
Tighten the pressure adjusting
Ultralow printing bolt. Then adjust the length of
pressure connecting rod to lower the
height of print head.
The ribbon too tense to
move Loosen tension adjusting nut.

Ribbon being wet or oiled Replace new one

Silica rubber plate aged Replace new one

- 35 -
Check the unidirectional ribbon
Abnormal feeding of feeding parts. Pull tight the
ribbon spring of pressure roller to raise
pressure.
Reinstall the characters to a
character not suitably
uniform height without
located
deflection.
The face and back of
ribbon oppositely Reinstall ribbon
Failure of
installed.
printing
Heating block fails to Check heating tube and heating
heat circuit board.
Guide bars deformed and Readjust the parallelism between
nonparallel guide bars.
Crooked
Guide ribbon retainer
running of Readjust the position of retainer.
improperly located
ribbon
Pressure roller and ribbon Replace pressure roller or ribbon
feeding roller nonparallel feeding roller.
Over high temp. To lower temperature
To adjust the length of
Ribbon broken Over high printing
connecting rod and raise the
pressure
height of print head.
Coding Make sure all wires well and
Control box damaged or
machine fails correct contacted. Replace
malfunction
to work control box.

12) General Maintenance


To avoid the printing ribbon to be sticky or slip and effect the clarity of printed
characters, please use the absolute alcohol clean the surface of rubber pressure roller,
pressure roller and the belt guiding pole regularly. Keep lubricated between slider and
draw runner, lubricate with grease once very week.

- 36 -

You might also like