Fault Analysis of AC Uninterruptible Power Supply System in Gas Pipeline


Compressor Station

Chen Hanlin
China Petroleum Engineering & Construction Corporation
Beijing, China
chenhanlin@cpecc.com.cn

Abstract—Regarding the AC UPS fault accident happened in


one compressor station which caused severe consequence with II. STRUCTURE OF AC UPS
gas transmission pipeline, this paper lists the possible reasons The static uninterruptible power supply system (UPS) is
based on the recorded fault code and equipment configuration, of dual redundant configuration, normally both inverters
and solutions are proposed for modification. In the end, shall be synchronized with each other and with the AC
recommendations are given for the future project design of AC
power input. The two inverters shall be operating in parallel
UPS.
and sharing the load equally. When a disturbance/fault
Keywords- Uninterruptible Power Supply; UPS; Gas Pipeline; occurs in any of the inverters, the faulty unit shall be
Island Operation; Compressor Station; High Frequency; Power automatically disconnected and the entire load supplied from
Frequency; Power Electronics; IGBT; Power Quality the remaining inverter. If both inverters develop a fault, the
load shall be transferred to the bypass supply through the
static switch.
I. INTRODUCTION Refer to Figure.1 for the single line diagram of AC UPS
The purpose of a compressor station is to boost the system.
pressure in a natural gas pipeline and move the natural gas According to the manufacture specification, the incoming
further downstream. This compressor station is one of the cables for UPS main unit #1 and #2 are 3C+PE type, and the
middle compressor stations along an international long incoming cable for bypass unit is 4C+PE type. The isolation
distance gas pipeline. In this compressor station, gas turbine transformers for UPS main unit #1 and #2 are of delta-delta
serves to operate the centrifugal compressor and gas engine winding, and the bypass transformer is of star-star winding.
generators are used as main power supply (total 3 nos., each Nominal output voltage for DC battery bank is 720VDC with
is 1000kW, 380V, 50Hz, 0.8pf). The electrical system is of 3 wires (positive, neutral, negative). IGBT is used in invertor
T-N-S type. unit.
As per category of electrical loads, most power
consuming devices are fed by normal and emergency bus bar III. FAULT RECORD OF AC UPS
separately, and important equipment such as Station Control As per the report, fault codes record from the mimic
System (SCS) and telecommunication system are powered panel of UPS #1 and #2 were same during the flash-stop
by Uninterruptible Power Supply. Based on history record of accident, refer to Table 1.
Electrical Control System (ECS), gas generator #3 is the only According to the alarm code, during the flash-stop
running generator with output power 600kW during normal moment, both invertor units of UPS #1 and #2 were shut
condition. down and bypass was not available. Beside, some internal
According to the official report from operators, the error was found by the self-exam module. Because AC UPS
accident of AC UPS output flash-stop happened during hot- automatically and immediately recovered and none hardware
standby gas generator #2 increasing power output after gas fault was found after later examination, it is obvious that the
generator #3 shutting down from one failure. The output of transition period of generator #2 rapid increasing power
AC UPS suddenly stopped and automatically recovered after output caused this accident.
a very short time. The fail-safe type ESD (emergency
shutdown) system which is powered by AC UPS was TABLE I. ALARM CODE DESCRIPTION FOR THE FLASH-STOP
triggered by this flash-stop accident, and all running process ACCIDENT
equipments which connected with the SCS & ESD system
were emergency stopped. Besides, the communication Code Alarm Name Description
between the compressor station and the pipeline SCADA
central control station broke down by power failure. A15 Bypass fault Bypass is not available
The fault analysis will be carried out from the structure of A25 Invertor closed Invertor is shut down
AC UPS.
A28 UPS self-exam fault System warning

Published by Atlantis Press, Paris, France.


© the authors
2271
Proceedings of the 2nd International Conference on Computer Science and Electronics Engineering (ICCSEE 2013)

Figure 1. Single Line Diagram of AC UPS system

interfered with the DC neutral line and caused the control


IV. FAULT ANALYSIS circuit shutting down the invertors of UPS #1 and #2
Based on the universal practice of factory fabrication, together. Besides, it’s also possible that the harmonics from
there are one common neutral bus bar and one common the power system interfered with the control circuit of AC
earthing bus bar inside the AC UPS cabinets, which means UPS and generated incorrect order. After all the interfere
that all neutral conductor belong the AC UPS system will be disappeared, the UPS system automatically recovered.
bonded to the common neutral bus bar, and all earthing It’s clear that the disturbance from the power system
conductor including cabinets’ enclosure will be connected to neutral line caused the accident.
the common earthing bus bar. The ‘common’ neutral
provides zero-potential reference for the AC UPS working V. SOLUTION
and the ‘common’ earthing provides electrical equipotential Since the interfere from the system caused the accident,
bonding for protection. then it is reasonable by segregating the system neutral
The Y-winding neutral point of bypass transformer and conductor from the AC UPS neutral bus bar to solve this
the neutral wire of DC battery bank are bonded to the problem.
common neutral bus bar as well. During the transient period, It is applicable to replace the bypass transformer of Y-Y
the electrical load of gas generator was increasing rapidly winding to D-Y winding to make a ‘floating’ neutral point
and causing turbulence to this small power system of island inside the AC UPS system. Then the AC UPS common
operation. The feedback harmonics and unbalanced current neutral will be isolated from the system neutral, and the
between phase lines made the power quality very poor. The disturbance in the system neutral conductor will not affect
transient current in the system neutral line was delivered to the AC UPS. The AC UPS output neutral line will be related
the AC UPS system via the Y-winding neutral point of the with the DC battery bank neutral wire only.
bypass transformer unit. The interfere from the power system This solution is the most suitable and economic way to
flowed into the common neutral bus bar of AC UPS system, prevent the similar accident happening again. No more

Published by Atlantis Press, Paris, France.


© the authors
2272
Proceedings of the 2nd International Conference on Computer Science and Electronics Engineering (ICCSEE 2013)

similar accident was reported from this compressor station The stability and performance of AC UPS system will be
after this modification. Meanwhile, for future brand new better after isolating the system interfere and optimizing the
project, it is better to consider the feature of island operation electrical system power quality.
power system and design the AC UPS with better
configuration at the beginning. VII. CONCLUSION
For the island operation power system of gas compressor
VI. RECOMMENDATION FOR FUTURE PROJECT station, the power quality is not very good based on the
For future similar project design of AC UPS system, it is character of power load and scale of the power distribution
necessary to consider the following suggestions: network. The ‘common’ practice of equipment configuration
• Neutral zero-potential point should not be involved might not be suitable for the small power system, where
in IGBT inverter working, which means the inter- harmonics, unbalanced current, voltage fluctuation, power
connection power cable between DC battery and source stability appears frequently. Hence, special cautions
UPS main unit should be 2-core type (positive, should be taken into account for the delicate power
negative). electronic devices, like the AC UPS system.
• The built-in neutral bus of AC UPS should be
isolated from power system neutral conductor. REFERENCES
• Input isolation transformer should be considered in [1] Wang Zhaoan, Huang Jun, “Technology of Power Electronics”,
Edition 4th, China Machine Press, 2001.
UPS main unit and bypass unit, and Y winding is not
recommended for primary winding. Moreover, [2] IEC 62040, “Uniterruptible Power Supply (UPS)”.
output isolation transformers should be configured [3] IEEE Std 519-1992, “IEEE Recommendaed Practices and
Requirements for Harmonic Control in Electrical Power Systems”.
for inverter as well.
[4] IEEE Std 1100-2005, “IEEE Recommended Practice for Powering
• Special measures and equipment should be and Grounding Electronic Equipment”.
considered to improve the power quality of island [5] BS 7671-2008, “Requirements for Electrical Installations” .
operation system.