similar accident was reported from this compressor station The stability and performance of AC UPS system will be
after this modification. Meanwhile, for future brand new better after isolating the system interfere and optimizing the
project, it is better to consider the feature of island operation electrical system power quality.
power system and design the AC UPS with better
configuration at the beginning. VII. CONCLUSION
For the island operation power system of gas compressor
VI. RECOMMENDATION FOR FUTURE PROJECT station, the power quality is not very good based on the
For future similar project design of AC UPS system, it is character of power load and scale of the power distribution
necessary to consider the following suggestions: network. The ‘common’ practice of equipment configuration
• Neutral zero-potential point should not be involved might not be suitable for the small power system, where
in IGBT inverter working, which means the inter- harmonics, unbalanced current, voltage fluctuation, power
connection power cable between DC battery and source stability appears frequently. Hence, special cautions
UPS main unit should be 2-core type (positive, should be taken into account for the delicate power
negative). electronic devices, like the AC UPS system.
• The built-in neutral bus of AC UPS should be
isolated from power system neutral conductor. REFERENCES
• Input isolation transformer should be considered in [1] Wang Zhaoan, Huang Jun, “Technology of Power Electronics”,
Edition 4th, China Machine Press, 2001.
UPS main unit and bypass unit, and Y winding is not
recommended for primary winding. Moreover, [2] IEC 62040, “Uniterruptible Power Supply (UPS)”.
output isolation transformers should be configured [3] IEEE Std 519-1992, “IEEE Recommendaed Practices and
Requirements for Harmonic Control in Electrical Power Systems”.
for inverter as well.
[4] IEEE Std 1100-2005, “IEEE Recommended Practice for Powering
• Special measures and equipment should be and Grounding Electronic Equipment”.
considered to improve the power quality of island [5] BS 7671-2008, “Requirements for Electrical Installations” .